{"id":20996,"date":"2026-11-07T10:07:01","date_gmt":"2026-11-07T02:07:01","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/shared-output-terminals-branch-record-lrs250\/"},"modified":"2026-11-07T10:07:01","modified_gmt":"2026-11-07T02:07:01","slug":"shared-output-terminals-branch-record-lrs250","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/","title":{"rendered":"Multiple Output Screws on One Supply: Record Shared Capacity and Branch Paths"},"content":{"rendered":"<figure class=\"hero\"><a href=\"https:\/\/www.wehopower.com\/de\/product\/lrs-series-250w-ac-to-dc-single-output-switching-power-supply\/\"><img decoding=\"async\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/hero-24.webp\" alt=\"Multiple Output Screws on One Supply: Record Shared Capacity and Branch Paths  title=\" fetchpriority=\"high\" multiple output screws on one supply: record shared capacity and branch paths title=\"\"><\/a><figcaption>AI-assisted cabinet illustration using original LRS-250-24 artwork. The visible conductors follow the pictured terminal groups; concealed fixing, terminations, selector state and the full branch-protection design remain unverified. No actual load test is represented.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original-17.jpg\">View original product image<\/a><\/figure>\n<p><strong>Several screws marked +V and \u2212V on a single-output supply are not evidence of several independently rated power rails.<\/strong> Review the applicable terminal assignment, total output limit and each external branch. Do not multiply the supply\u2019s rating by the number of screw positions.<\/p>\n<p>This guide is for a panel designer creating a distribution record around the LRS-250-24. Its useful output is a traceable branch map that keeps the supply limit separate from terminal and conductor limits.<\/p>\n<nav class=\"toc\" aria-label=\"On this page\">\n<ol>\n<li><a href=\"#read-assignment\">Read the exact terminal assignment first<\/a><\/li>\n<li><a href=\"#add-concurrent-branches\">Add the currents that can actually run together<\/a><\/li>\n<li><a href=\"#separate-local-limits\">Check local paths without inventing a per-screw rating<\/a><\/li>\n<li><a href=\"#trace-every-return\">Trace the return path with the same care as the positive path<\/a><\/li>\n<li><a href=\"#release-branch-map\">Release a branch map that survives field changes<\/a><\/li>\n<\/ol>\n<\/nav>\n<section id=\"read-assignment\">\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Inhaltsverzeichnis<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Umschalten<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/#Read_the_exact_terminal_assignment_first\" >Read the exact terminal assignment first<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/#Add_the_currents_that_can_actually_run_together\" >Add the currents that can actually run together<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/#Check_local_paths_without_inventing_a_per-screw_rating\" >Check local paths without inventing a per-screw rating<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/#Trace_the_return_path_with_the_same_care_as_the_positive_path\" >Trace the return path with the same care as the positive path<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/#Release_a_branch_map_that_survives_field_changes\" >Release a branch map that survives field changes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/#Single-output_branch_and_return_record\" >Single-output branch and return record<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/de\/news\/shared-output-terminals-branch-record-lrs250\/#Sources_and_further_reading\" >Sources and further reading<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Read_the_exact_terminal_assignment_first\"><\/span>Read the exact terminal assignment first<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Der <a href=\"https:\/\/www.wehopower.com\/de\/product\/lrs-series-250w-ac-to-dc-single-output-switching-power-supply\/\">LRS-250 page<\/a> identifies this as a single-output family, and the 24 V table column lists a 0\u201310 A range. The original photograph has repeated DC markings and separate input markings. Read the drawing for the supplied revision before assigning a conductor; do not infer electrical independence from spacing.<\/p>\n<p>The \u201c250\u201d family name and a 24 V \u00d7 10 A arithmetic product must also not be treated as interchangeable guaranteed continuous output conditions. For this review, the published 10 A column is the preliminary current ceiling; the supplier must establish the applicable operating conditions and revision.<\/p>\n<figure id=\"fig-original\" class=\"product-original\"><a href=\"https:\/\/www.wehopower.com\/de\/product\/lrs-series-250w-ac-to-dc-single-output-switching-power-supply\/\"><img decoding=\"async\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original-17.jpg\" alt=\"Multiple Output Screws on One Supply: Record Shared Capacity and Branch Paths  title=\" loading=\"lazy\" multiple output screws on one supply: record shared capacity and branch paths title=\"\"><\/a><figcaption>Manufacturer image showing the WEHO LRS-250-24; the photograph identifies the pictured unit and does not establish equipment-level suitability.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original-17.jpg\">View original image<\/a><\/figure>\n<\/section>\n<section id=\"add-concurrent-branches\">\n<h2><span class=\"ez-toc-section\" id=\"Add_the_currents_that_can_actually_run_together\"><\/span>Add the currents that can actually run together<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For a hypothetical concurrent state, Branch A draws 3.1 A, B draws 2.4 A and C draws 1.7 A. The sum is <strong>7.2 A<\/strong>. At a nominal 24 V that is <strong>172.8 W<\/strong>. Moving Branch C to another +V screw does not reduce the 7.2 A demanded from the source.<\/p>\n<p>Adding a 3.0 A option raises the simultaneous sum to <strong>10.2 A<\/strong>. This exceeds a 10 A initial screen even if no individual branch draws that much. The diagram is a functional distribution map, not permission to land these loads directly on the supply.<\/p>\n<figure id=\"fig-diagram\" class=\"diagram\"><img decoding=\"async\" class=\"technical-desktop\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-24.svg\" alt=\"Multiple Output Screws on One Supply: Record Shared Capacity and Branch Paths  title=\" loading=\"lazy\" multiple output screws on one supply: record shared capacity and branch paths title=\"\"><img decoding=\"async\" class=\"technical-mobile\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-mobile-24.svg\" alt=\"Multiple Output Screws on One Supply: Record Shared Capacity and Branch Paths  title=\" loading=\"lazy\" multiple output screws on one supply: record shared capacity and branch paths title=\"\"><figcaption>Hypothetical simultaneous-current calculation; no per-terminal current rating is assigned.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-24.svg\">Open full-size technical illustration<\/a><\/figure>\n<\/section>\n<section id=\"separate-local-limits\">\n<h2><span class=\"ez-toc-section\" id=\"Check_local_paths_without_inventing_a_per-screw_rating\"><\/span>Check local paths without inventing a per-screw rating<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div class=\"table-scroll\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Limit<\/th>\n<th scope=\"col\">What establishes it<\/th>\n<th scope=\"col\">What does not establish it<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Supply total<\/td>\n<td>Exact variant and operating conditions<\/td>\n<td>Number of +V screws<\/td>\n<\/tr>\n<tr>\n<td>Terminal connection<\/td>\n<td>Applicable terminal instructions and allowed conductors<\/td>\n<td>One third of the total rating by assumption<\/td>\n<\/tr>\n<tr>\n<td>Branch conductor<\/td>\n<td>Installation, current and protective coordination<\/td>\n<td>Supply model name alone<\/td>\n<\/tr>\n<tr>\n<td>Shared return<\/td>\n<td>Total return current through its actual path<\/td>\n<td>Positive-wire labels only<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The available product table does not provide a complete external terminal-use approval for every possible conductor combination. Do not assign \u201c5 A per screw,\u201d double-lug a position or bridge screws simply to use all available holes. Obtain the terminal instructions and use suitable distribution hardware where required.<\/p>\n<\/section>\n<section id=\"trace-every-return\">\n<h2><span class=\"ez-toc-section\" id=\"Trace_the_return_path_with_the_same_care_as_the_positive_path\"><\/span>Trace the return path with the same care as the positive path<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A drawing that shows only positive branches is incomplete. Record which return conductor carries each load current, where returns join and whether a connector carries combined return current. A small return path can carry more than a single branch even when the positive conductors look well divided.<\/p>\n<p>PE, chassis bonds and DC negative perform different functions. Repeated \u2212V access does not authorize using PE as a return or adding an arbitrary bond. Keep any grounding decision separate and supported by the equipment design.<\/p>\n<\/section>\n<section id=\"release-branch-map\">\n<h2><span class=\"ez-toc-section\" id=\"Release_a_branch_map_that_survives_field_changes\"><\/span>Release a branch map that survives field changes<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Label each branch by receiver and conductor identification, not only by a terminal number. Record simultaneous states, the evidence behind each demand and which options are mutually exclusive. If software later allows two options to run together, reopen the sum.<\/p>\n<p>During the authorized assembly test, verify receiver voltage under the demanding state and inspect connections using the documented installation method. A correctly added current budget is an initial design check, not evidence of acceptable contact temperature or fault coordination. Preserve the final terminal assignment and actual test record with the BOM.<\/p>\n<\/section>\n<section class=\"cta\">\n<p>Send the <a href=\"https:\/\/www.wehopower.com\/de\/product\/lrs-series-250w-ac-to-dc-single-output-switching-power-supply\/\">LRS-250-24 distribution proposal<\/a> with a terminal map, simultaneous branch-current schedule, conductor and lug details, and protective-device arrangement. Request the offered revision\u2019s shared-output limits and termination instructions before releasing either the total load budget or an individual connection.<\/p>\n<\/section>\n<section id=\"worksheet\" class=\"sheet\">\n<h2><span class=\"ez-toc-section\" id=\"Single-output_branch_and_return_record\"><\/span>Single-output branch and return record<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div class=\"sheet-row\"><label>Supply revision<input aria-label=\"Supply revision\"><\/label><label>Operating conditions<input aria-label=\"Operating conditions\"><\/label><label>Terminal instruction<input aria-label=\"Terminal instruction\"><\/label><label>Circuit revision<input aria-label=\"Circuit revision\"><\/label><\/div>\n<div class=\"table-scroll\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">State \/ receiver<\/th>\n<th scope=\"col\">Positive path<\/th>\n<th scope=\"col\">Return path<\/th>\n<th scope=\"col\">Current and source<\/th>\n<th scope=\"col\">Decision<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<\/tr>\n<tr>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Blank project worksheet. Enter verified project data; example calculations above are not measurements.<\/p>\n<\/section>\n<section class=\"source-list\">\n<h2><span class=\"ez-toc-section\" id=\"Sources_and_further_reading\"><\/span>Sources and further reading<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li><a href=\"https:\/\/www.wehopower.com\/de\/product\/lrs-series-250w-ac-to-dc-single-output-switching-power-supply\/\">WEHO LRS-250 product information<\/a><\/li>\n<li><a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2025\/07\/LRS-250-a07.pdf\">WEHO LRS-250 specification<\/a><\/li>\n<\/ol>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Use the LRS-250-24 terminal arrangement to distinguish shared output access from independent rails and document each branch without inventing terminal ratings.<\/p>","protected":false},"author":2,"featured_media":20959,"parent":0,"menu_order":83,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-20996","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/news\/20996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/comments?post=20996"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/news\/20996\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/media\/20959"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/media?parent=20996"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/de\/wp-json\/wp\/v2\/news_category?post=20996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}