{"id":22661,"date":"2026-11-18T10:18:45","date_gmt":"2026-11-18T02:18:45","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/secondary-potting-cure-heat-paths\/"},"modified":"2026-11-18T10:18:45","modified_gmt":"2026-11-18T02:18:45","slug":"secondary-potting-cure-heat-paths","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/","title":{"rendered":"Secondary Potting of Power Assemblies: Verify Cure and Heat Paths"},"content":{"rendered":"<div class=\"weho-blog\">\n<div class=\"key-takeaways\"><strong>Key Engineering Takeaways<\/strong><\/p>\n<ul>\n<li>Adding encapsulant to a finished power assembly is a design and process change requiring manufacturer review.<\/li>\n<li>Check cure compatibility on representative materials, including existing coatings, sealants and cable surfaces.<\/li>\n<li>Higher thermal conductivity does not overcome every thickness, interface or blocked-airflow problem.<\/li>\n<li>Release a changed assembly only against documented cure, thermal, electrical and mechanical requirements.<\/li>\n<\/ul>\n<\/div>\n<figure class=\"article-figure hero\" data-asset=\"F04-hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/es\/product\/lrs-series-400w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"LRS-400-24 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/3c057ec44cefc101-lrs-400-24-application.avif\" alt=\"Secondary Potting of Power Assemblies: Verify Cure and Heat Paths  title=\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" secondary potting of power assemblies: verify cure and heat paths title =\"\"><\/a><figcaption>AI-assisted application illustration of LRS-400-24. The supply remains unmodified; no added potting compound or modification approval is shown. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/37fc252f0794f33d-application-master.webp\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>On this page<\/summary>\n<ol>\n<li><a href=\"#why-a-protective-fill-can-create-a-new-failure-mode\">Why a protective fill can create a new failure mode<\/a><\/li>\n<li><a href=\"#define-the-proposed-change-before-comparing-materials\">Define the proposed change before comparing materials<\/a><\/li>\n<li><a href=\"#check-compatibility-where-the-encapsulant-actually-touches\">Check compatibility where the encapsulant actually touches<\/a><\/li>\n<li><a href=\"#review-cure-heat-geometry-and-mechanical-stress\">Review cure heat, geometry and mechanical stress<\/a><\/li>\n<li><a href=\"#calculate-the-thickness-penalty-in-a-simple-heat-path\">Calculate the thickness penalty in a simple heat path<\/a><\/li>\n<li><a href=\"#qualify-the-changed-assembly-through-explicit-gates\">Qualify the changed assembly through explicit gates<\/a><\/li>\n<li><a href=\"#prepare-an-lrs-400-24-construction-enquiry\">Prepare an LRS-400-24 construction enquiry<\/a><\/li>\n<li><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Tabla de contenido<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar tabla de contenidos\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Palanca<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Why_a_protective_fill_can_create_a_new_failure_mode\" >Why a protective fill can create a new failure mode<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Define_the_proposed_change_before_comparing_materials\" >Define the proposed change before comparing materials<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Check_compatibility_where_the_encapsulant_actually_touches\" >Check compatibility where the encapsulant actually touches<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Review_cure_heat_geometry_and_mechanical_stress\" >Review cure heat, geometry and mechanical stress<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Calculate_the_thickness_penalty_in_a_simple_heat_path\" >Calculate the thickness penalty in a simple heat path<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Qualify_the_changed_assembly_through_explicit_gates\" >Qualify the changed assembly through explicit gates<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Prepare_an_LRS-400-24_construction_enquiry\" >Prepare an LRS-400-24 construction enquiry<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Frequently_asked_questions\" >Frequently asked questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Can_an_electronics-grade_resin_be_added_to_any_finished_power_supply\" >Can an electronics-grade resin be added to any finished power supply?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Does_a_cured_outer_surface_prove_that_the_complete_fill_is_cured\" >Does a cured outer surface prove that the complete fill is cured?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Does_higher_thermal_conductivity_always_lower_component_temperature\" >Does higher thermal conductivity always lower component temperature?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.wehopower.com\/es\/news\/secondary-potting-cure-heat-paths\/#Does_secondary_potting_automatically_create_a_waterproof_product_rating\" >Does secondary potting automatically create a waterproof product rating?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"why-a-protective-fill-can-create-a-new-failure-mode\"><span class=\"ez-toc-section\" id=\"Why_a_protective_fill_can_create_a_new_failure_mode\"><\/span>Why a protective fill can create a new failure mode<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>An OEM proposes filling a power-supply enclosure with resin to improve environmental protection. The proposal changes the materials touching the assembly, the cure exposure, heat transfer and access for inspection. A cured surface or a favorable bulk material datasheet cannot establish that the complete modified assembly remains suitable.<\/p>\n<p>El <a href=\"https:\/\/www.wehopower.com\/es\/product\/lrs-series-400w-ac-to-dc-single-output-switching-power-supply\/\">WEHO LRS-400-24 product reference<\/a> provides an enclosed-supply context for discussing that change. The pictured product is not an approved secondary-potting design. Do not pour material into its enclosure, cover openings or obstruct its fan based on this article; obtain an applicable manufacturer assessment before considering a modified construction.<\/p>\n<h2 id=\"define-the-proposed-change-before-comparing-materials\"><span class=\"ez-toc-section\" id=\"Define_the_proposed_change_before_comparing_materials\"><\/span>Define the proposed change before comparing materials<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Document whether the proposal concerns a new subassembly designed for encapsulation or a finished purchased power supply. State the boundaries, proposed fill depth, materials contacted, components excluded and required environmental outcome. A request saying only \u201cmake it waterproof\u201d leaves the mechanical interfaces and validation target undefined.<\/p>\n<p>Identify every function that relies on space or access in the original construction. Ventilation, moving parts, terminal access, adjustment points and service inspection may conflict with the proposed fill. A sealed material sample does not establish an assembled enclosure rating or permission to modify a product&#39;s cooling system.<\/p>\n<p>Keep the proposed process separate from the material&#39;s advertised properties. Mix ratio, application window, cure temperature and final properties belong to the exact material revision and process conditions. Existing product approvals and electrical ratings must not automatically be transferred to a construction changed by the integrator.<\/p>\n<h2 id=\"check-compatibility-where-the-encapsulant-actually-touches\"><span class=\"ez-toc-section\" id=\"Check_compatibility_where_the_encapsulant_actually_touches\"><\/span>Check compatibility where the encapsulant actually touches<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Cure compatibility requires contact tests with representative production surfaces. Dow&#39;s <a href=\"https:\/\/www.dow.com\/en-us\/product-technology\/pt-gels-encapsulants.html\" target=\"_blank\" rel=\"noopener\">encapsulant guidance<\/a> identifies potential inhibitors for platinum-catalyzed addition-cure silicones, including certain amines, sulfur-containing materials and tin compounds. That chemistry-specific warning does not mean every silicone or every contaminant behaves identically.<\/p>\n<p>Build a material-contact list that includes PCB coatings, adhesive residues, labels, cable jackets, cleaning residues and previously applied sealants. Use representative processed parts rather than assuming a bare metal coupon captures the assembly. A release agent or substitute cable compound can matter even when its location is hidden after filling.<\/p>\n<p>Compare a control coupon with a coupon contacting each relevant surface under the proposed process. Record material lot, preparation, ratio basis, mixing method, time and actual thermal exposure. Inspect the interface as well as the outer surface using acceptance criteria agreed with the material supplier; a dry-looking top does not prove complete cure underneath.<\/p>\n<p>Use the selected material&#39;s instructions to define tests and permissible process changes. For example, Dow describes <a href=\"https:\/\/www.dow.com\/en-us\/pdp.dowsil-cn-6015-thermally-conductive-encapsulant.505412z.html\" target=\"_blank\" rel=\"noopener\">DOWSIL CN-6015<\/a> as allowing room-temperature or heat-accelerated curing. That statement is a property of that product and provides no universal oven schedule or permission to expose a finished WEHO supply to the same process.<\/p>\n<figure class=\"article-figure product\" data-asset=\"F04-product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/es\/product\/lrs-series-400w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"LRS-400-24 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/0f29ed8b4c6b5ff9-lrs-400-24-product-reference.avif\" alt=\"Secondary Potting of Power Assemblies: Verify Cure and Heat Paths  title=\" width=\"1000\" height=\"1000\" decoding=\"async\" secondary potting of power assemblies: verify cure and heat paths title =\"\"><\/a><figcaption>Product reference for LRS-400-24; original visible identity is retained. The supply remains unmodified; no added potting compound or modification approval is shown. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/44622179442b7304-product-original.jpg\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<h2 id=\"review-cure-heat-geometry-and-mechanical-stress\"><span class=\"ez-toc-section\" id=\"Review_cure_heat_geometry_and_mechanical_stress\"><\/span>Review cure heat, geometry and mechanical stress<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The cure itself can impose thermal and mechanical loads before the product ever operates. The <a href=\"https:\/\/www.macdermidalpha.com\/sites\/default\/files\/2025-06\/Electrolube-ER2220-PTC-TDS-GL-EN-26Jan2024%20%281%29.pdf\" target=\"_blank\" rel=\"noopener\">Electrolube ER2220 technical datasheet<\/a> reports exotherm with a stated 100 mL sample, cylinder diameter and initial temperature. Preserve such test conditions when reviewing a material; a small successful mix does not automatically qualify a different production fill.<\/p>\n<p>Record the proposed dispensed volume, maximum local depth, initial temperatures and cure environment. Compare the actual assembly exposure with the permitted conditions of its components and materials. Where void control is required, select and validate an applicable process rather than adding a generic vacuum or heating step to an unreviewed assembly.<\/p>\n<p>Thermal expansion, shrinkage and stiffness also require a construction-specific review. A material that helps transfer heat can still load components or interfaces during cure and temperature cycling. Define which electrical, mechanical and environmental properties must remain within their requirements after the process and through the intended operating conditions.<\/p>\n<h2 id=\"calculate-the-thickness-penalty-in-a-simple-heat-path\"><span class=\"ez-toc-section\" id=\"Calculate_the_thickness_penalty_in_a_simple_heat_path\"><\/span>Calculate the thickness penalty in a simple heat path<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Consider a hypothetical flat slab carrying 6 W through an effective area of 20 cm\u00b2, or 0.002 m\u00b2. Assume one-dimensional steady conduction, uniform thickness, perfect contact and constant thermal conductivity. The example isolates a material layer; it does not represent the internal construction, losses or temperature of LRS-400-24.<\/p>\n<p>For this model, thermal resistance is R_th = t \u00f7 (k \u00d7 A), and temperature difference is \u0394T = P \u00d7 R_th. Candidate A has an assumed thickness of 3 mm and conductivity of 0.8 W\/(m\u00b7K). Its layer resistance is 0.003 \u00f7 (0.8 \u00d7 0.002) = 1.875 K\/W, producing an 11.25 K temperature difference at 6 W.<\/p>\n<p>Candidate B doubles conductivity to an assumed 1.6 W\/(m\u00b7K) but increases thickness to 8 mm. Its layer resistance becomes 0.008 \u00f7 (1.6 \u00d7 0.002) = 2.500 K\/W, producing a 15.00 K temperature difference. Despite the better bulk conductivity, the thicker layer has the higher resistance in this particular model.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Hypothetical layer<\/th>\n<th scope=\"col\">Thickness and conductivity<\/th>\n<th scope=\"col\">Calculated layer resistance<\/th>\n<th scope=\"col\">Temperature difference at 6 W<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Candidate A<\/td>\n<td>3 mm; 0.8 W\/(m\u00b7K)<\/td>\n<td>1.875 K\/W<\/td>\n<td>11.25 K<\/td>\n<\/tr>\n<tr>\n<td>Candidate B<\/td>\n<td>8 mm; 1.6 W\/(m\u00b7K)<\/td>\n<td>2.500 K\/W<\/td>\n<td>15.00 K<\/td>\n<\/tr>\n<tr>\n<td>Comparaci\u00f3n<\/td>\n<td>Same assumed 20 cm\u00b2 path<\/td>\n<td>B is 0.625 K\/W higher<\/td>\n<td>B is 3.75 K higher<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>This model excludes interface resistance, voids, lateral heat spreading, other parallel heat paths and any change to convection. It therefore cannot predict the hottest component or approve a potted supply. Blocking a designed airflow path changes the thermal system and cannot be justified by the slab calculation alone.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"F04-technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/82bb2c8c711b5fda-potting-heat-path-engineering-example.svg\" alt=\"Secondary Potting of Power Assemblies: Verify Cure and Heat Paths  title=\" width=\"1200\" height=\"675\" decoding=\"async\" secondary potting of power assemblies: verify cure and heat paths title =\"\"><\/div><figcaption>Conceptual Engineering Diagram. Hypothetical slab conduction only; excludes interfaces, voids and cooling-system changes, and does not approve secondary potting. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/82bb2c8c711b5fda-potting-heat-path-engineering-example.svg\" target=\"_blank\" rel=\"noopener\">Open full-size diagram<\/a><\/figcaption><p class=\"figure-help\">Swipe horizontally on a small screen, or open the full-size diagram.<\/p>\n<\/figure>\n<h2 id=\"qualify-the-changed-assembly-through-explicit-gates\"><span class=\"ez-toc-section\" id=\"Qualify_the_changed_assembly_through_explicit_gates\"><\/span>Qualify the changed assembly through explicit gates<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Separate material screening from assembly approval so that an early coupon result is not treated as final product acceptance. Define the applicable requirements and decision owners before destructive or irreversible work. Use representative samples and the manufacturer&#39;s permitted construction boundaries in a controlled development program.<\/p>\n<ol>\n<li><strong>Define the construction change.<\/strong> Record the product revision, fill boundaries, contacted materials and required outcome. Accept the proposal for investigation only when the manufacturer and responsible engineering reviewers agree on the scope.<\/li>\n<li><strong>Screen the cure interfaces.<\/strong> Prepare control and contact specimens with the proposed materials and process. Save lot, mixing and exposure records; accept only interfaces meeting the agreed cure and adhesion criteria.<\/li>\n<li><strong>Verify the process exposure.<\/strong> Measure the relevant cure-time and temperature conditions on representative development samples. Record volume, geometry and observations; reject conditions that exceed permitted component or material limits.<\/li>\n<li><strong>Test the assembly requirements.<\/strong> Evaluate the agreed thermal, electrical, mechanical and environmental cases after processing. Preserve the tested construction and raw results; accept only the requirements actually demonstrated under their specified conditions.<\/li>\n<li><strong>Freeze the approved process.<\/strong> Release the exact materials, ratios, tooling, cure profile and inspections with change control. Require re-evaluation when suppliers, geometry, coatings or process conditions change outside the approved range.<\/li>\n<\/ol>\n<p>Define how hidden defects will be detected before adopting a production process. Cross-sections or other suitable inspections may reveal interfaces and voids that are invisible at the top surface, but the inspection method must match the assembly and acceptance requirement. A finished appearance is useful visual evidence, not a substitute for the required qualification.<\/p>\n<p>Use <a href=\"https:\/\/www.wehopower.com\/es\/news\/power-supply-thermal-test-compare-simulation-with-a-matched-chamber-configuration\/\">WEHO&#39;s thermal-test configuration review<\/a> when planning the separate assembly thermal evidence. Matching a model to a chamber configuration is a different task from proving cure compatibility, and neither result automatically closes the other.<\/p>\n<h2 id=\"prepare-an-lrs-400-24-construction-enquiry\"><span class=\"ez-toc-section\" id=\"Prepare_an_LRS-400-24_construction_enquiry\"><\/span>Prepare an LRS-400-24 construction enquiry<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Send WEHO the <a href=\"https:\/\/www.wehopower.com\/es\/product\/lrs-series-400w-ac-to-dc-single-output-switching-power-supply\/\">LRS-400-24 reference<\/a>, an annotated construction drawing and the reason for considering encapsulation. Include the proposed material data, fill geometry, cure exposure, load and environmental requirements. Use the <a href=\"https:\/\/www.wehopower.com\/es\/contact\/\">WEHO contact page<\/a> to request the applicable construction guidance before modifying purchased units or asserting that an existing rating remains valid.<\/p>\n<h2 id=\"frequently-asked-questions\"><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span>Frequently asked questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"can-an-electronics-grade-resin-be-added-to-any-finished-power-supply\"><span class=\"ez-toc-section\" id=\"Can_an_electronics-grade_resin_be_added_to_any_finished_power_supply\"><\/span>Can an electronics-grade resin be added to any finished power supply?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, material suitability alone does not authorize a construction change. Cooling, contacted surfaces, component exposure and the modified assembly&#39;s requirements need manufacturer and engineering review.<\/p>\n<h3 id=\"does-a-cured-outer-surface-prove-that-the-complete-fill-is-cured\"><span class=\"ez-toc-section\" id=\"Does_a_cured_outer_surface_prove_that_the_complete_fill_is_cured\"><\/span>Does a cured outer surface prove that the complete fill is cured?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, the interface or a deeper region can behave differently. Use the material supplier&#39;s suitable checks on representative contact specimens and assembly geometry.<\/p>\n<h3 id=\"does-higher-thermal-conductivity-always-lower-component-temperature\"><span class=\"ez-toc-section\" id=\"Does_higher_thermal_conductivity_always_lower_component_temperature\"><\/span>Does higher thermal conductivity always lower component temperature?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, thickness, effective area, interfaces and the complete cooling arrangement also affect temperature. The hypothetical example shows why a thicker layer can outweigh a higher conductivity.<\/p>\n<h3 id=\"does-secondary-potting-automatically-create-a-waterproof-product-rating\"><span class=\"ez-toc-section\" id=\"Does_secondary_potting_automatically_create_a_waterproof_product_rating\"><\/span>Does secondary potting automatically create a waterproof product rating?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, an assembled protection claim requires evidence for the actual enclosure, interfaces and exposure requirements. A resin property or coupon result cannot establish that rating for a modified supply.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Check secondary-potting cure interfaces, process exposure and heat paths before asking WEHO to assess a proposed LRS-400-24 construction change.<\/p>","protected":false},"author":2,"featured_media":22243,"parent":0,"menu_order":7,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-22661","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/news\/22661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/comments?post=22661"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/news\/22661\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/media\/22243"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/media?parent=22661"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/es\/wp-json\/wp\/v2\/news_category?post=22661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}