{"id":22662,"date":"2026-11-18T10:18:59","date_gmt":"2026-11-18T02:18:59","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/it-mains-input-earth-voltage\/"},"modified":"2026-11-18T10:18:59","modified_gmt":"2026-11-18T02:18:59","slug":"it-mains-input-earth-voltage","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/","title":{"rendered":"IT Mains Power Supplies: Verify Input-to-Earth Limits Before Selection"},"content":{"rendered":"<div class=\"weho-blog\">\n<div class=\"key-takeaways\"><strong>Key Engineering Takeaways<\/strong><\/p>\n<ul>\n<li>An input-voltage range alone does not establish suitability for an IT earthing system.<\/li>\n<li>Check voltage across the input and voltage from each input conductor to protective earth separately.<\/li>\n<li>A first earth fault can change conductor-to-earth stress while the supply still sees its normal input voltage.<\/li>\n<li>Obtain exact-model IT-system permission and applicable conditions; another manufacturer&#8217;s approval does not cover WEHO.<\/li>\n<\/ul>\n<\/div>\n<figure class=\"article-figure hero\" data-asset=\"F05-hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/fr\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/5c902365198df58f-ndr-120-24-application.webp\" alt=\"IT Mains Power Supplies: Verify Input-to-Earth Limits Before Selection  title=\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" it mains power supplies: verify input-to-earth limits before selection title =\"\"><\/a><figcaption>AI-assisted application illustration of NDR-120-24. The picture does not establish approval for an IT network or a first-fault condition. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c098f4405daa5c57-application-master.webp\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>On this page<\/summary>\n<ol>\n<li><a href=\"#why-a-normal-input-reading-can-leave-the-selection-unresolved\">Why a normal input reading can leave the selection unresolved<\/a><\/li>\n<li><a href=\"#identify-the-mains-earthing-arrangement-precisely\">Identify the mains earthing arrangement precisely<\/a><\/li>\n<li><a href=\"#separate-three-voltage-questions\">Separate three voltage questions<\/a><\/li>\n<li><a href=\"#calculate-a-hypothetical-first-fault-voltage-shift\">Calculate a hypothetical first-fault voltage shift<\/a><\/li>\n<li><a href=\"#read-a-manufacturer-s-network-permission-with-its-limits\">Read a manufacturer&#8217;s network permission with its limits<\/a><\/li>\n<li><a href=\"#build-an-input-suitability-evidence-record\">Build an input-suitability evidence record<\/a><\/li>\n<li><a href=\"#prepare-an-ndr-120-24-it-network-enquiry\">Prepare an NDR-120-24 IT-network enquiry<\/a><\/li>\n<li><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table des mati\u00e8res<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Basculer<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Why_a_normal_input_reading_can_leave_the_selection_unresolved\" >Why a normal input reading can leave the selection unresolved<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Identify_the_mains_earthing_arrangement_precisely\" >Identify the mains earthing arrangement precisely<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Separate_three_voltage_questions\" >Separate three voltage questions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Calculate_a_hypothetical_first-fault_voltage_shift\" >Calculate a hypothetical first-fault voltage shift<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Read_a_manufacturers_network_permission_with_its_limits\" >Read a manufacturer&#39;s network permission with its limits<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Build_an_input-suitability_evidence_record\" >Build an input-suitability evidence record<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Prepare_an_NDR-120-24_IT-network_enquiry\" >Prepare an NDR-120-24 IT-network enquiry<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Frequently_asked_questions\" >Frequently asked questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Does_an_85%E2%80%93264_V_AC_input_range_establish_IT-network_suitability\" >Does an 85\u2013264 V AC input range establish IT-network suitability?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Can_input_voltage_stay_normal_while_voltage_to_earth_rises\" >Can input voltage stay normal while voltage to earth rises?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Does_a_short_insulation_withstand_test_establish_a_continuous_earth-voltage_limit\" >Does a short insulation withstand test establish a continuous earth-voltage limit?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.wehopower.com\/fr\/news\/it-mains-input-earth-voltage\/#Can_CP20481_instructions_approve_a_WEHO_NDR_model_for_an_IT_network\" >Can CP20.481 instructions approve a WEHO NDR model for an IT network?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"why-a-normal-input-reading-can-leave-the-selection-unresolved\"><span class=\"ez-toc-section\" id=\"Why_a_normal_input_reading_can_leave_the_selection_unresolved\"><\/span>Why a normal input reading can leave the selection unresolved<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A machine designer confirms the expected voltage across a power supply&#39;s input terminals and assumes the same unit is suitable on an IT mains network. The missing question is how each input conductor can move relative to earth, including a first insulation fault elsewhere in the network. The differential input reading does not describe that stress.<\/p>\n<p>Le <a href=\"https:\/\/www.wehopower.com\/fr\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">WEHO NDR-120-24 product reference<\/a> is a candidate enquiry route in this article. The available product context does not establish IT-network approval or a permissible continuous input-to-earth voltage. Treat those items as model-specific selection requirements before releasing the candidate for an IT installation.<\/p>\n<h2 id=\"identify-the-mains-earthing-arrangement-precisely\"><span class=\"ez-toc-section\" id=\"Identify_the_mains_earthing_arrangement_precisely\"><\/span>Identify the mains earthing arrangement precisely<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>IT here means an electrical earthing arrangement, not information technology equipment. The source&#39;s live system is isolated from earth or connected through an appropriate impedance, while required exposed conductive parts remain protectively earthed. It does not mean removing the protective-earth conductor from equipment designed to require it.<\/p>\n<p>Obtain the network diagram and identify all live conductors, any distributed neutral, nominal voltages, permitted tolerances and the source&#39;s relationship to earth. A description such as \u201c230 V industrial mains\u201d does not establish these details. A line-to-line connection and a line-to-neutral connection can present different selection conditions even when both are discussed as single-phase loads.<\/p>\n<p>IT networks also require system-level protection and monitoring provisions. Bender&#39;s <a href=\"https:\/\/www.bender.de\/en\/know-how\/technology\/it-system\/it-systems-as-reflected-in-the-standards\/\" target=\"_blank\" rel=\"noopener\">IT-system standards explanation<\/a> discusses first-fault behavior and its dependence on the installation conditions. Selecting a power supply neither completes that design nor authorizes continued operation after a fault without the required system provisions.<\/p>\n<h2 id=\"separate-three-voltage-questions\"><span class=\"ez-toc-section\" id=\"Separate_three_voltage_questions\"><\/span>Separate three voltage questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>First, establish the voltage between the two conductors feeding the power supply. Compare its normal range and relevant events with the exact input requirements. This is the familiar differential-input check, but it is only one part of the assessment.<\/p>\n<p>Second, establish the continuous voltage from each input conductor to protective earth in normal operation and the relevant first-fault states. The conditions may be asymmetric, and a terminal labeled N must not automatically be assumed near earth in every permitted supply arrangement. Ask the manufacturer which network connections the exact model allows.<\/p>\n<p>Third, keep continuous operating voltage separate from transient and insulation-test values. A brief withstand test does not, by itself, establish a permissible continuous conductor-to-earth voltage or a mains-network approval. Record the relevant category, installation conditions and manufacturer instructions without converting one kind of specification into another.<\/p>\n<p>The related <a href=\"https:\/\/www.wehopower.com\/fr\/news\/power-supply-creepage-and-clearance-ask-for-the-insulation-coordination-record\/\">WEHO insulation-coordination evidence guide<\/a> addresses construction records rather than network permission. Use the applicable assessment documents alongside the input-network review, without estimating internal insulation paths from the cabinet image.<\/p>\n<h2 id=\"calculate-a-hypothetical-first-fault-voltage-shift\"><span class=\"ez-toc-section\" id=\"Calculate_a_hypothetical_first-fault_voltage_shift\"><\/span>Calculate a hypothetical first-fault voltage shift<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Consider an ideal balanced three-phase IT source with 230 V RMS line-to-line, no distributed neutral and equal healthy phase-to-earth coupling. A generic input is connected between L1 and L2. This is a theoretical voltage example, not a wiring recommendation or an approved connection of NDR-120-24.<\/p>\n<p>Under the stated symmetric healthy assumptions, each phase is approximately 230 \u00f7 \u221a3 = 132.8 V RMS relative to earth. The input between L1 and L2 still receives 230 V RMS. Actual healthy conductor-to-earth voltages can differ when leakage paths and capacitances are unbalanced, so the symmetric value must not become a field assumption.<\/p>\n<p>Now assume an ideal low-impedance first fault connects L3 to earth. L1 and L2 are each approximately 230 V RMS relative to earth, while their line-to-line difference remains 230 V RMS. The conductor-to-earth magnitude has increased by a factor of \u221a3, although the voltage across the generic input has not changed.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Idealized network condition<\/th>\n<th scope=\"col\">Across generic L1\u2013L2 input<\/th>\n<th scope=\"col\">L1-to-earth \/ L2-to-earth<\/th>\n<th scope=\"col\">Selection implication<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Healthy, symmetric coupling<\/td>\n<td>230 V RMS<\/td>\n<td>132.8 V \/ 132.8 V<\/td>\n<td>Still establish actual permitted earth stress<\/td>\n<\/tr>\n<tr>\n<td>First fault from L3 to earth<\/td>\n<td>230 V RMS<\/td>\n<td>230 V \/ 230 V<\/td>\n<td>Unchanged input does not mean unchanged earth stress<\/td>\n<\/tr>\n<tr>\n<td>Same ideal fault case at +10% source voltage<\/td>\n<td>253 V RMS<\/td>\n<td>253 V \/ 253 V<\/td>\n<td>Include permitted network tolerance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Schneider Electric&#39;s <a href=\"https:\/\/www.electrical-installation.org\/enwiki\/IT_system_-_Fault_protection\" target=\"_blank\" rel=\"noopener\">IT fault-protection guide<\/a> describes the rise in healthy phase-to-earth voltage during a first fault. The arithmetic here applies that principle to an explicitly assumed 230 V line-to-line system. It is not an assessment of touch voltage, fault current, protective-device operation or a complete installation.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"F05-technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/f504d83b39915395-it-input-earth-voltage-engineering-example.svg\" alt=\"IT Mains Power Supplies: Verify Input-to-Earth Limits Before Selection  title=\" width=\"1200\" height=\"675\" decoding=\"async\" it mains power supplies: verify input-to-earth limits before selection title =\"\"><\/div><figcaption>Conceptual Engineering Diagram. Idealized IT-network voltage comparison; no NDR network approval, wiring method, fault-current result or protection design is implied. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/f504d83b39915395-it-input-earth-voltage-engineering-example.svg\" target=\"_blank\" rel=\"noopener\">Open full-size diagram<\/a><\/figcaption><p class=\"figure-help\">Swipe horizontally on a small screen, or open the full-size diagram.<\/p>\n<\/figure>\n<h2 id=\"read-a-manufacturer-s-network-permission-with-its-limits\"><span class=\"ez-toc-section\" id=\"Read_a_manufacturers_network_permission_with_its_limits\"><\/span>Read a manufacturer&#39;s network permission with its limits<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A useful instruction identifies the allowed network type and the related input-to-earth limit in the same document. For a concrete external example, the <a href=\"https:\/\/products.pulspower.com\/en\/mwdownloads\/download\/link\/id\/1556\/\" target=\"_blank\" rel=\"noopener\">PULS CP20.481 installation manual<\/a> explicitly permits TN, TT and IT mains networks while limiting continuous AC voltage between input terminals and PE to 300 V. That permission belongs to CP20.481 under its own instructions.<\/p>\n<p>The PULS statement shows what a supplier response can look like; it is not evidence that NDR-120-24 has the same permission or limit. Even a candidate that satisfies one earth-voltage comparison must also meet its differential input, installation, temperature and other applicable requirements. Keep the exact model and document revision attached to every conclusion.<\/p>\n<p>Avoid interpreting a terminal label or a general input range as an equivalent statement. Product photographs can identify the device and its visible connection points, but they do not establish internal input-to-earth component ratings. The cabinet illustration also does not depict an IT network, a first-fault state or an insulation-monitoring arrangement.<\/p>\n<figure class=\"article-figure product\" data-asset=\"F05-product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/fr\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c1d1da3932e864b9-ndr-120-24-product-reference.webp\" alt=\"IT Mains Power Supplies: Verify Input-to-Earth Limits Before Selection  title=\" width=\"800\" height=\"800\" decoding=\"async\" it mains power supplies: verify input-to-earth limits before selection title =\"\"><\/a><figcaption>Product reference for NDR-120-24; original visible identity is retained. The picture does not establish approval for an IT network or a first-fault condition. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/e03f11f17a629a7f-product-original.jpg\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<h2 id=\"build-an-input-suitability-evidence-record\"><span class=\"ez-toc-section\" id=\"Build_an_input-suitability_evidence_record\"><\/span>Build an input-suitability evidence record<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Use a document review to resolve suitability before planning any energized investigation. Record the network arrangement, all relevant normal and fault-state conductor potentials, the candidate&#39;s written permission and the exact limiting conditions. A qualified installation designer must determine the actual fault cases and applicable requirements for the project.<\/p>\n<ol>\n<li><strong>Identify the source arrangement.<\/strong> Obtain the network drawing, voltage definitions, tolerances and neutral distribution. Accept the record when the supply conductors and their relationship to earth are unambiguous.<\/li>\n<li><strong>List the voltage cases.<\/strong> Document differential input and each input-to-earth voltage for the relevant operating and first-fault conditions. Save assumptions and the responsible designer&#39;s analysis; accept only a complete set of project cases.<\/li>\n<li><strong>Request exact-model permission.<\/strong> Ask the manufacturer for allowed mains networks, continuous earth-voltage limits and associated instructions. Record the model and revision; do not release suitability from a similar product&#39;s data.<\/li>\n<li><strong>Compare every applicable requirement.<\/strong> Check the documented cases against the candidate&#39;s input and installation conditions. Record each comparison and unresolved item; accept only the cases supported by the applicable documentation.<\/li>\n<li><strong>Approve the complete installation separately.<\/strong> Have the responsible designer verify monitoring, protective earthing, fault response and required protection. Keep that assessment with the product evidence; a supply-selection pass alone cannot close the installation review.<\/li>\n<\/ol>\n<p>Do not create a deliberate mains earth fault to reproduce the simplified table without a separately engineered and authorized test arrangement. The table is a selection calculation, not a commissioning procedure. Use approved documents and appropriate professional verification methods to establish the real installation conditions.<\/p>\n<h2 id=\"prepare-an-ndr-120-24-it-network-enquiry\"><span class=\"ez-toc-section\" id=\"Prepare_an_NDR-120-24_IT-network_enquiry\"><\/span>Prepare an NDR-120-24 IT-network enquiry<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Send WEHO the <a href=\"https:\/\/www.wehopower.com\/fr\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">NDR-120-24 candidate<\/a>, source diagram, maximum differential input and each conductor&#39;s maximum continuous earth voltage in the defined cases. Ask for explicit model-specific permission and any restrictions that affect the proposed connection. Include the required installation and environmental conditions through the <a href=\"https:\/\/www.wehopower.com\/fr\/contact\/\">Page de contact WEHO<\/a> before placing the candidate on the released BOM.<\/p>\n<h2 id=\"frequently-asked-questions\"><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span>Frequently asked questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"does-an-85-264-v-ac-input-range-establish-it-network-suitability\"><span class=\"ez-toc-section\" id=\"Does_an_85%E2%80%93264_V_AC_input_range_establish_IT-network_suitability\"><\/span>Does an 85\u2013264 V AC input range establish IT-network suitability?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, a differential input range alone does not establish permitted conductor-to-earth stress or allowed network arrangements. Obtain the exact model&#39;s applicable installation permission and conditions.<\/p>\n<h3 id=\"can-input-voltage-stay-normal-while-voltage-to-earth-rises\"><span class=\"ez-toc-section\" id=\"Can_input_voltage_stay_normal_while_voltage_to_earth_rises\"><\/span>Can input voltage stay normal while voltage to earth rises?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Yes, the hypothetical three-phase example shows that possibility after a first fault on another phase. Actual values require the project&#39;s network and fault analysis.<\/p>\n<h3 id=\"does-a-short-insulation-withstand-test-establish-a-continuous-earth-voltage-limit\"><span class=\"ez-toc-section\" id=\"Does_a_short_insulation_withstand_test_establish_a_continuous_earth-voltage_limit\"><\/span>Does a short insulation withstand test establish a continuous earth-voltage limit?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, those specifications describe different conditions. Use a documented continuous operating limit and the manufacturer&#39;s allowed mains arrangements for selection.<\/p>\n<h3 id=\"can-cp20-481-instructions-approve-a-weho-ndr-model-for-an-it-network\"><span class=\"ez-toc-section\" id=\"Can_CP20481_instructions_approve_a_WEHO_NDR_model_for_an_IT_network\"><\/span>Can CP20.481 instructions approve a WEHO NDR model for an IT network?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, CP20.481 permission applies to that PULS model under its instructions. Request separate evidence for the exact WEHO candidate and the intended installation.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Check IT-network input voltage and each conductor-to-earth limit, then request explicit WEHO NDR-120-24 permission for the intended mains arrangement.<\/p>","protected":false},"author":2,"featured_media":22647,"parent":0,"menu_order":4,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-22662","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/news\/22662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/comments?post=22662"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/news\/22662\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/media\/22647"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/media?parent=22662"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/fr\/wp-json\/wp\/v2\/news_category?post=22662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}