{"id":23594,"date":"2026-11-23T10:18:40","date_gmt":"2026-11-23T02:18:40","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/mains-flicker-electrical-optical-boundary\/"},"modified":"2026-11-23T10:18:40","modified_gmt":"2026-11-23T02:18:40","slug":"mains-flicker-electrical-optical-boundary","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/","title":{"rendered":"Mains Flicker Evidence: Separate Grid Voltage and LED Light Output"},"content":{"rendered":"<div class=\"weho-blog\">\n<p>A mains flicker report and an optical flicker report answer different questions. Before comparing lighting equipment, identify whether the requirement concerns voltage fluctuations impressed on the AC distribution system or variation in the light emitted by the finished luminaire.<\/p>\n<div class=\"key-takeaways\"><strong>Key Engineering Takeaways<\/strong><\/p>\n<ul>\n<li>Name the measured physical quantity before accepting a flicker claim.<\/li>\n<li>Keep mains-disturbance evidence separate from optical modulation.<\/li>\n<li>Retain switching patterns and operating conditions with the result.<\/li>\n<li>Do not derive flicker severity from one voltage-change percentage.<\/li>\n<\/ul>\n<\/div>\n<figure class=\"article-figure hero\" data-asset=\"K02-hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/it\/product\/hlg-150-150w-12v-24v-36v-48v-waterproof-ip67-led-power-supply-with-pfc\/\" aria-label=\"HLG-150-24 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/9a1e831f40da5a8e-hlg-150-24-application.webp\" alt=\"HLG-150-24 product installed in an industrial application scene with original housing and label details.\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" title=\"\"><\/a><figcaption>Application illustration of HLG-150-24 in an equipment setting; not a customer installation photo. Scene created with AI assistance. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/e17bcc37638f5980-application-master.webp\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>On this page<\/summary>\n<ol>\n<li><a href=\"#1-put-the-word-flicker-in-the-right-measurement-boundary\">1. Put the word flicker in the right measurement boundary<\/a><\/li>\n<li><a href=\"#2-specify-the-two-questions-separately\">2. Specify the two questions separately<\/a><\/li>\n<li><a href=\"#3-recalculate-a-simple-source-voltage-example\">3. Recalculate a simple source-voltage example<\/a><\/li>\n<li><a href=\"#4-review-what-the-report-actually-demonstrates\">4. Review what the report actually demonstrates<\/a><\/li>\n<li><a href=\"#5-build-the-release-record-in-five-actions\">5. Build the release record in five actions<\/a><\/li>\n<li><a href=\"#6-request-the-matching-driver-and-test-information\">6. Request the matching driver and test information<\/a><\/li>\n<li><a href=\"#7-engineering-faq\">7. Engineering FAQ<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Sommario<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Attiva\/disattiva Sommario\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Attiva\/disattiva<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#1_Put_the_word_flicker_in_the_right_measurement_boundary\" >1. Put the word flicker in the right measurement boundary<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#2_Specify_the_two_questions_separately\" >2. Specify the two questions separately<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#3_Recalculate_a_simple_source-voltage_example\" >3. Recalculate a simple source-voltage example<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#4_Review_what_the_report_actually_demonstrates\" >4. Review what the report actually demonstrates<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#5_Build_the_release_record_in_five_actions\" >5. Build the release record in five actions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#6_Request_the_matching_driver_and_test_information\" >6. Request the matching driver and test information<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#7_Engineering_FAQ\" >7. Engineering FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#Does_a_mains_flicker_report_prove_low_optical_modulation\" >Does a mains flicker report prove low optical modulation?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#Can_a_voltage-change_percentage_be_called_a_flicker-severity_result\" >Can a voltage-change percentage be called a flicker-severity result?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#Are_the_040_%CE%A9_and_80_A_values_HLG-150-24_specifications\" >Are the 0.40 \u03a9 and 8.0 A values HLG-150-24 specifications?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.wehopower.com\/it\/news\/mains-flicker-electrical-optical-boundary\/#Can_one_test_report_cover_every_switching_pattern\" >Can one test report cover every switching pattern?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"1-put-the-word-flicker-in-the-right-measurement-boundary\"><span class=\"ez-toc-section\" id=\"1_Put_the_word_flicker_in_the_right_measurement_boundary\"><\/span>1. Put the word flicker in the right measurement boundary<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>An OEM purchasing specification might request a flicker result without stating what was measured. A supplier can then provide a valid report for the wrong question. Resolve that ambiguity before requesting numerical limits, comparing products or asking a laboratory to repeat a test.<\/p>\n<p>IL <a href=\"https:\/\/www.wehopower.com\/it\/product\/hlg-150-150w-12v-24v-36v-48v-waterproof-ip67-led-power-supply-with-pfc\/\">WEHO HLG-150-24 product reference<\/a> identifies the candidate driver context. It does not identify the lamp, optical receiver, mains impedance or a completed test configuration. A driver reference therefore belongs alongside the load and measurement conditions, rather than standing in for the complete lighting assembly.<\/p>\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/4150\" target=\"_blank\" rel=\"noopener\">IEC 61000-3-3<\/a> concerns voltage changes, voltage fluctuations and flicker impressed on public low-voltage systems. Its published scope includes specific equipment-current and connection conditions. Determine the applicable edition and equipment category before treating a general EMC declaration as the required evidence.<\/p>\n<p>A measurement of the finished light source uses a different observation path. Its result depends on the emitted light and an appropriate optical measurement system. Neither an electrical input-current trace nor a driver photograph supplies the missing optical waveform.<\/p>\n<h2 id=\"2-specify-the-two-questions-separately\"><span class=\"ez-toc-section\" id=\"2_Specify_the_two_questions_separately\"><\/span>2. Specify the two questions separately<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For the mains question, record the electrical supply conditions, actual equipment operating cycle and test method. The equipment may change its demand when zones switch, a control state changes or another declared operating event occurs. A steady full-load point does not describe every voltage-change event in that cycle.<\/p>\n<p>For the optical question, record the complete luminaire, light-output setting, optical receiver and acquisition conditions. The <a href=\"https:\/\/cie.co.at\/publications\/visual-aspects-time-modulated-lighting-systems-incl-corrigendum-1\" target=\"_blank\" rel=\"noopener\">CIE publication on time-modulated lighting<\/a> addresses visual effects and measurement models associated with emitted light. Use the actual applicable publication and metric; do not translate a mains report into an optical result because both use the word flicker.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Review field<\/th>\n<th scope=\"col\">Mains-voltage question<\/th>\n<th scope=\"col\">Optical-output question<\/th>\n<th scope=\"col\">What procurement retains<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Observed quantity<\/td>\n<td>Electrical voltage fluctuation at the defined input boundary<\/td>\n<td>Time variation of emitted light<\/td>\n<td>Explicit quantity, units and metric name<\/td>\n<\/tr>\n<tr>\n<td>Assembly<\/td>\n<td>Equipment, supply arrangement and operating cycle<\/td>\n<td>Driver, LED load, controls and optical arrangement<\/td>\n<td>Exact tested configuration<\/td>\n<\/tr>\n<tr>\n<td>Method<\/td>\n<td>Applicable electrical method and standard edition<\/td>\n<td>Applicable optical method and publication<\/td>\n<td>Method identifier and actual report<\/td>\n<\/tr>\n<tr>\n<td>Interpretation<\/td>\n<td>Disturbance associated with the equipment on the supply system<\/td>\n<td>Temporal light-output behavior under the tested conditions<\/td>\n<td>Separate dispositions for separate requirements<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Write the full metric name in the report request. Similar abbreviations or related measurement concepts do not make methods interchangeable. If a customer provides only a numerical limit and the word flicker, ask which physical quantity, method and edition define that limit.<\/p>\n<p>The same separation applies to harmonic-current evidence. The existing <a href=\"https:\/\/www.wehopower.com\/it\/news\/harmonic-current-limits-and-pfc-for-en-61000-3-2\/\">harmonic limits and PFC checklist<\/a> addresses a different electrical review. A favorable power-factor value cannot replace either a mains-voltage-fluctuation result or an optical modulation record.<\/p>\n<h2 id=\"3-recalculate-a-simple-source-voltage-example\"><span class=\"ez-toc-section\" id=\"3_Recalculate_a_simple_source-voltage_example\"><\/span>3. Recalculate a simple source-voltage example<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Assume a hypothetical 230 V source feeds a changing load through an equivalent series resistance of 0.40 \u03a9. Ignore reactance, nonlinear current shape and feedback for this deliberately simplified calculation. It illustrates voltage-change amplitude only; it is not the standardized flickermeter algorithm or a predicted HLG input waveform.<\/p>\n<p>For an assumed 2.0 A current step, the resistive voltage change is \u0394V = R \u00d7 \u0394I = 0.40 \u00d7 2.0 = 0.80 V. Relative to the assumed 230 V reference, the change is 100 \u00d7 0.80\/230 = 0.348%. That percentage alone does not establish a flicker-severity result or compliance.<\/p>\n<p>For an assumed 8.0 A step through the same resistance, \u0394V = 0.40 \u00d7 8.0 = 3.20 V. The corresponding amplitude is 100 \u00d7 3.20\/230 = 1.391%. These are two hypothetical branch-demand changes, not rated or measured input currents for the pictured driver.<\/p>\n<p>Now consider two schedules with that same 3.20 V amplitude. Schedule A contains one two-second pulse in a sixty-second observation. Schedule B contains ten two-second pulses, each beginning six seconds apart, in that same observation. The amplitude calculation remains identical while the temporal input to a flicker assessment changes.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"K02-technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/4abfbf7e1d8f08e7-technical.svg\" alt=\"Two hypothetical voltage-change schedules share amplitude while differing in pulse count across sixty seconds.\" width=\"1200\" height=\"675\" decoding=\"async\" title=\"\"><\/div><figcaption>Conceptual Engineering Diagram. Assumed 230V resistive-source examples show identical 3.20V changes on different schedules, without calculating electrical or optical flicker severity. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/4abfbf7e1d8f08e7-technical.svg\" target=\"_blank\" rel=\"noopener\">Open full-size diagram<\/a><\/figcaption><p class=\"figure-help\">Swipe horizontally on a small screen, or open the full-size diagram.<\/p>\n<\/figure>\n<p>No flicker severity is calculated from those schedules here. Their purpose is to show why an amplitude-only screenshot omits information needed by the actual method. A real source also requires its specified impedance and waveform conditions, rather than the purely resistive assumption used in this worksheet.<\/p>\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/4173\" target=\"_blank\" rel=\"noopener\">IEC 61000-4-15<\/a> defines functional and design specifications for flicker-measuring apparatus and a severity-evaluation method. Its scope is different from a pass-limit declaration for every product. Keep the instrument method and the equipment limit source as separate entries in the test plan.<\/p>\n<h2 id=\"4-review-what-the-report-actually-demonstrates\"><span class=\"ez-toc-section\" id=\"4_Review_what_the_report_actually_demonstrates\"><\/span>4. Review what the report actually demonstrates<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Match the reported operating cycle to the equipment&#39;s intended use. Record whether a result covers first energization, repeated switching, a stable operating state or another stated sequence. Do not combine rows from different configurations into a single favorable claim without a documented assessment.<\/p>\n<p>The existing <a href=\"https:\/\/www.wehopower.com\/it\/news\/led-driver-flicker-optical-acceptance-matrix\/\">optical flicker acceptance guide<\/a> remains the appropriate starting point when the concern is the emitted light. This article instead separates the electrical report request from that optical task. A project needing both should retain both records and their independent acceptance criteria.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Hypothetical case<\/th>\n<th scope=\"col\">Current step<\/th>\n<th scope=\"col\">Calculated voltage change<\/th>\n<th scope=\"col\">What remains unknown<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Small resistive-source example<\/td>\n<td>2.0 A<\/td>\n<td>0.80 V; 0.348%<\/td>\n<td>Actual standardized severity and equipment result<\/td>\n<\/tr>\n<tr>\n<td>Schedule A<\/td>\n<td>8.0 A; one assumed pulse<\/td>\n<td>3.20 V; 1.391%<\/td>\n<td>Temporal weighting and applicable disposition<\/td>\n<\/tr>\n<tr>\n<td>Schedule B<\/td>\n<td>8.0 A; ten assumed pulses<\/td>\n<td>3.20 V; 1.391%<\/td>\n<td>Temporal weighting and applicable disposition<\/td>\n<\/tr>\n<tr>\n<td>Optical output<\/td>\n<td>No optical data provided<\/td>\n<td>Not calculated from electrical voltage changes<\/td>\n<td>Light waveform, method and result<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>A report should identify its test item, document revision, date, laboratory, method and operating conditions. Preserve actual findings and any limitations imposed by the report. A component reference or declaration with no matching operating-cycle evidence should remain a documentation gap, not become an invented pass.<\/p>\n<figure class=\"article-figure product\" data-asset=\"K02-product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/it\/product\/hlg-150-150w-12v-24v-36v-48v-waterproof-ip67-led-power-supply-with-pfc\/\" aria-label=\"HLG-150-24 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/d725f4f3906167ee-hlg-150-24-product-reference.webp\" alt=\"HLG-150-24 product reference preserving the original housing, visible label and connection features.\" width=\"800\" height=\"800\" decoding=\"async\" title=\"\"><\/a><figcaption>Product appearance reference for HLG-150-24, preserving the source housing, visible label and connections. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/96e7989f0e23ee10-product-original.png\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<h2 id=\"5-build-the-release-record-in-five-actions\"><span class=\"ez-toc-section\" id=\"5_Build_the_release_record_in_five_actions\"><\/span>5. Build the release record in five actions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li><strong>Name the concern.<\/strong> Record whether the project needs electrical mains-disturbance evidence, optical evidence or both. Verify that the requirement names the measured quantity and applicable method.<\/li>\n<li><strong>Freeze the assembly.<\/strong> Record the exact driver, LED load, controls, input arrangement and revisions. Verify the supplied report against that same configuration and identify differences explicitly.<\/li>\n<li><strong>Describe the cycle.<\/strong> Record relevant switching events, repetition and load states. Verify that the laboratory exercised the operating cases required by the governing procedure and project specification.<\/li>\n<li><strong>Check the result fields.<\/strong> Record metric names, units, instrument method, standard edition and limit source. Verify that electrical and optical results remain in separate rows with separate dispositions.<\/li>\n<li><strong>Close the evidence gaps.<\/strong> Record missing conditions, required supplementary tests and the responsible owner. Verify closure before converting the result into a purchasing or release statement.<\/li>\n<\/ol>\n<p>The electrical test belongs in an appropriately equipped laboratory under its approved procedures. This review does not instruct anyone to change live distribution impedance or repeatedly switch installed lighting for an improvised test. The simplified resistance model is a calculation boundary, not a construction instruction.<\/p>\n<h2 id=\"6-request-the-matching-driver-and-test-information\"><span class=\"ez-toc-section\" id=\"6_Request_the_matching_driver_and_test_information\"><\/span>6. Request the matching driver and test information<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For an <a href=\"https:\/\/www.wehopower.com\/it\/product\/hlg-150-150w-12v-24v-36v-48v-waterproof-ip67-led-power-supply-with-pfc\/\">HLG-150-24 lighting-project review<\/a>, send the exact driver suffix and revision, LED-load requirements, input conditions, controls, intended switching cycle and the report being requested. State separately whether the project needs mains flicker, optical modulation or harmonic-current evidence. This gives WEHO and the responsible laboratory a precise documentation question without assigning unsupported performance to the model.<\/p>\n<h2 id=\"7-engineering-faq\"><span class=\"ez-toc-section\" id=\"7_Engineering_FAQ\"><\/span>7. Engineering FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"does-a-mains-flicker-report-prove-low-optical-modulation\"><span class=\"ez-toc-section\" id=\"Does_a_mains_flicker_report_prove_low_optical_modulation\"><\/span>Does a mains flicker report prove low optical modulation?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. The physical observation and method differ. Obtain the optical record for the complete lighting configuration when the requirement concerns emitted light.<\/p>\n<h3 id=\"can-a-voltage-change-percentage-be-called-a-flicker-severity-result\"><span class=\"ez-toc-section\" id=\"Can_a_voltage-change_percentage_be_called_a_flicker-severity_result\"><\/span>Can a voltage-change percentage be called a flicker-severity result?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. A percentage describes amplitude under its stated calculation. The applicable severity method also needs the relevant time-dependent waveform and defined test conditions.<\/p>\n<h3 id=\"are-the-0-40-and-8-0-a-values-hlg-150-24-specifications\"><span class=\"ez-toc-section\" id=\"Are_the_040_%CE%A9_and_80_A_values_HLG-150-24_specifications\"><\/span>Are the 0.40 \u03a9 and 8.0 A values HLG-150-24 specifications?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. They are explicit assumptions for a resistive-source arithmetic example. They do not establish driver input current, installation impedance or compliance.<\/p>\n<h3 id=\"can-one-test-report-cover-every-switching-pattern\"><span class=\"ez-toc-section\" id=\"Can_one_test_report_cover_every_switching_pattern\"><\/span>Can one test report cover every switching pattern?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Not automatically. Review the tested cycle and applicable procedure against the required equipment states. Identify uncovered conditions before using the report for release.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Separate mains voltage fluctuations from optical light modulation before accepting flicker evidence. Send WEHO the HLG-150-24 configuration and test scope.<\/p>","protected":false},"author":2,"featured_media":23410,"parent":0,"menu_order":18,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-23594","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/news\/23594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/comments?post=23594"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/news\/23594\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/media\/23410"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/media?parent=23594"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/it\/wp-json\/wp\/v2\/news_category?post=23594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}