{"id":20728,"date":"2026-11-03T10:08:03","date_gmt":"2026-11-03T02:08:03","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/tx4h-control-cycle-relay-operations-budget\/"},"modified":"2026-11-03T10:08:03","modified_gmt":"2026-11-03T02:08:03","slug":"tx4h-control-cycle-relay-operations-budget","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/","title":{"rendered":"TX4-H Control Cycle: Estimate Relay Operations Before Choosing a Switching Period"},"content":{"rendered":"<figure class=\"hero\"><a href=\"https:\/\/www.wehopower.com\/ms\/product\/tx4-series-tx4-h-economic-dual-display-pid-temperature-controller\/\"><img decoding=\"async\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/hero-3.webp\" alt=\"TX4-H beside relay and solid-state switching interfaces and an illustrative control-cycle budget screen.\" fetchpriority=\"high\" title=\"\"><\/a><figcaption>Control-interface review with mechanical and solid-state switching alternatives. The external screen illustrates the article\u2019s hypothetical event budget; controller display artwork is retained from the manufacturer reference. AI-assisted illustration.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original.png\">View original product image<\/a><\/figure>\n<p><strong>A shorter PID control cycle can greatly increase mechanical relay operations without increasing the controller&#8217;s displayed temperature accuracy.<\/strong> Before changing the TX4-H switching period, identify whether the installed output is a relay or an SSR drive and calculate the switching demand for the actual operating schedule.<\/p>\n<p>This guide is for an OEM electrical designer choosing how a local temperature loop commands its power-switching interface. It provides an operations budget and a review method. It does not predict a contact replacement interval or authorize the controller to switch an arbitrary heater directly.<\/p>\n<nav class=\"toc\" aria-label=\"On this page\">\n<ol>\n<li><a href=\"#control-output\">Identify the output before comparing cycle times<\/a><\/li>\n<li><a href=\"#operations-model\">Count cycles at the duty that actually causes switching<\/a><\/li>\n<li><a href=\"#worked-operations\">A tenfold cycle change creates a tenfold event estimate<\/a><\/li>\n<li><a href=\"#interface-review\">Review the switch and the thermal process together<\/a><\/li>\n<li><a href=\"#trial\">Use the output trace to explain the temperature result<\/a><\/li>\n<li><a href=\"#front-form\">Retain the full output configuration with the BOM<\/a><\/li>\n<\/ol>\n<\/nav>\n<section id=\"control-output\">\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Jadual Kandungan<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Togol<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#Identify_the_output_before_comparing_cycle_times\" >Identify the output before comparing cycle times<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#Count_cycles_at_the_duty_that_actually_causes_switching\" >Count cycles at the duty that actually causes switching<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#A_tenfold_cycle_change_creates_a_tenfold_event_estimate\" >A tenfold cycle change creates a tenfold event estimate<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#Review_the_switch_and_the_thermal_process_together\" >Review the switch and the thermal process together<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#Use_the_output_trace_to_explain_the_temperature_result\" >Use the output trace to explain the temperature result<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#Retain_the_full_output_configuration_with_the_BOM\" >Retain the full output configuration with the BOM<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#Control-cycle_and_switching_demand_record\" >Control-cycle and switching demand record<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/ms\/news\/tx4h-control-cycle-relay-operations-budget\/#Sources_and_further_reading\" >Sources and further reading<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Identify_the_output_before_comparing_cycle_times\"><\/span>Identify the output before comparing cycle times<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The <a href=\"https:\/\/www.wehopower.com\/ms\/product\/tx4-series-tx4-h-economic-dual-display-pid-temperature-controller\/\">WEHO TX4-H product page<\/a> describes relay\/SSR output selection. The <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2023\/11\/TX4.pdf\">TX4 instruction manual TX4 230808EN<\/a> distinguishes the relay output from the 12 VDC\u00b12V,\u226420mA SSR drive and suggests 20s for relay control and 2s for SSR control. These are documented configuration references, not proof that every process or external switch should use those periods.<\/p>\n<p>An SSR drive is a low-power control signal for a compatible external device. The relay output has its own voltage\/current and load conditions. Confirm the complete ordering code, selected output mode and installed interface; the front TX4-H marking does not identify all of these details.<\/p>\n<\/section>\n<section id=\"operations-model\">\n<h2><span class=\"ez-toc-section\" id=\"Count_cycles_at_the_duty_that_actually_causes_switching\"><\/span>Count cycles at the duty that actually causes switching<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For a simple repeating time-proportioning output at an intermediate duty, estimate one ON pulse and one OFF transition in each control period. If the period isT seconds overh operating hours, pulse cycles are approximately <strong>N = h \u00d73600\/T<\/strong>. If recording individual transitions, the total is approximately 2N. State which convention is used.<\/p>\n<p>This model is deliberately limited. At continuous 0% or 100% demand, a repeating pulse may not occur every period. Process changes, startup and alarm transitions can add events. Use an output trace or controller record to determine the real schedule rather than assuming every clock cycle creates a mechanical contact operation.<\/p>\n<\/section>\n<section id=\"worked-operations\">\n<h2><span class=\"ez-toc-section\" id=\"A_tenfold_cycle_change_creates_a_tenfold_event_estimate\"><\/span>A tenfold cycle change creates a tenfold event estimate<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"fig-diagram\" class=\"diagram\"><img decoding=\"async\" class=\"technical-desktop\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-3.svg\" alt=\"A2second control period gives ten times the pulse-cycle estimate of 20seconds under the same 10hour schedule\" loading=\"lazy\" title=\"\"><img decoding=\"async\" class=\"technical-mobile\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-mobile-3.svg\" alt=\"A2second control period gives ten times the pulse-cycle estimate of 20seconds under the same 10hour schedule\" loading=\"lazy\" title=\"\"><figcaption>Hypothetical output schedule;mechanical and electrical endurance remain separate.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-3.svg\">Open full-size technical illustration<\/a><\/figure>\n<p>Assume a hypothetical loop runs 16 h\/day and spends 10 h\/day at an intermediate duty that creates one pulse cycle per period. At 20s, the estimate is <strong>10 \u00d73600\/20=1800 pulse cycles\/day<\/strong>. At 2s, it is <strong>18000\/day<\/strong>. Over 250 such days, those become 450000 and 4500000 pulse cycles.<\/p>\n<p>These are arithmetic event estimates, not predicted relay life. A mechanical endurance statement and an electrical endurance statement are different. Contact loading, switching conditions and the actual definition of an operation affect interpretation. Do not divide a mechanical life figure by 1800 and promise the customer that many days of electrical service.<\/p>\n<\/section>\n<section id=\"interface-review\">\n<h2><span class=\"ez-toc-section\" id=\"Review_the_switch_and_the_thermal_process_together\"><\/span>Review the switch and the thermal process together<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A slow period can produce more visible temperature ripple in some systems, while a fast period can create unacceptable switching demand for a mechanical interface. The useful comparison includes the process&#8217;s thermal behavior, required temperature variation, output-device ratings and any minimum ON\/OFF timing of the external equipment.<\/p>\n<p>If an external SSR is considered, verify its compatible control-input requirements, power-circuit rating, thermal installation and protection from its own documentation. The presence of an SSR-drive setting does not qualify an unspecified SSR, remove heat-sinking needs or establish the result of a power-device fault.<\/p>\n<\/section>\n<section id=\"trial\">\n<h2><span class=\"ez-toc-section\" id=\"Use_the_output_trace_to_explain_the_temperature_result\"><\/span>Use the output trace to explain the temperature result<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Compare the candidate period on the actual process under an approved commissioning method. Record set value, measured value, output duty, startup behavior and steady-state variation. Count or estimate actual switching events during representative states. Keep the sensor type, control mode and other tuning parameters unchanged when isolating a period change.<\/p>\n<p>Do not improve the apparent graph by smoothing away real temperature variation or omitting startup. If the process needs a faster period than the approved mechanical interface supports, revise the interface or process design. A different period is an engineering change, not a cosmetic setting.<\/p>\n<\/section>\n<section id=\"front-form\">\n<h2><span class=\"ez-toc-section\" id=\"Retain_the_full_output_configuration_with_the_BOM\"><\/span>Retain the full output configuration with the BOM<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"fig-original\" class=\"product-original\"><a href=\"https:\/\/www.wehopower.com\/ms\/product\/tx4-series-tx4-h-economic-dual-display-pid-temperature-controller\/\"><img decoding=\"async\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original.png\" alt=\"WEHO TX4-H front form with dual display and base model marking\" loading=\"lazy\" title=\"\"><\/a><figcaption>Official TX4-H front-form illustration. The complete order code and rear connection option must be confirmed separately.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original.png\">View original image<\/a><\/figure>\n<p>The official TX4-H illustration identifies the tall 48 \u00d796 mm front form. It does not identify the complete supply\/output\/alarm order code or prove a power-switching arrangement. Retain the current manual, exact device marking, external-switch information and tested control period together so replacement or setup restoration does not silently alter the event budget.<\/p>\n<\/section>\n<section class=\"cta\">\n<p>Send <a href=\"https:\/\/www.wehopower.com\/ms\/contact\/\">WEHO<\/a> the full TX4-H code, sensor type, selected output mode, external-switch model, operating hours and proposed period. Include the temperature and output trace when requesting a configuration review.<\/p>\n<\/section>\n<section id=\"worksheet\" class=\"sheet\">\n<h2><span class=\"ez-toc-section\" id=\"Control-cycle_and_switching_demand_record\"><\/span>Control-cycle and switching demand record<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div class=\"sheet-row\"><label>Full model\/code<input aria-label=\"Full model\/code\"><\/label><label>Output mode<input aria-label=\"Output mode\"><\/label><label>External switch<input aria-label=\"External switch\"><\/label><label>Cycle s<input aria-label=\"Cycle s\"><\/label><label>Operating schedule<input aria-label=\"Operating schedule\"><\/label><\/div>\n<div class=\"table-scroll\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Representative state<\/th>\n<th scope=\"col\">Hours<\/th>\n<th scope=\"col\">Pulse cycles<\/th>\n<th scope=\"col\">Transitions convention<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Period change<\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Old\/new event estimate<\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Temperature variation<\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Interface limits<\/td>\n<\/tr>\n<tr>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Trial<\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Actual output trace<\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Temperature trace<\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\">Release<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Blank project worksheet. Enter verified project data; example calculations above are not measurements.<\/p>\n<\/section>\n<section class=\"source-list\">\n<h2><span class=\"ez-toc-section\" id=\"Sources_and_further_reading\"><\/span>Sources and further reading<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li><a href=\"https:\/\/www.wehopower.com\/ms\/product\/tx4-series-tx4-h-economic-dual-display-pid-temperature-controller\/\">WEHO TX4-H product page<\/a><\/li>\n<li><a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2023\/11\/TX4.pdf\">TX4 instruction manual TX4 230808EN<\/a><\/li>\n<\/ol>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Estimate TX4-H relay switching events from the proposed period and duty hours. Separate controller timing from the external switch&#8217;s electrical-life evidence.<\/p>","protected":false},"author":2,"featured_media":20697,"parent":0,"menu_order":175,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-20728","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/news\/20728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/comments?post=20728"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/news\/20728\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/media\/20697"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/media?parent=20728"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/ms\/wp-json\/wp\/v2\/news_category?post=20728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}