{"id":23593,"date":"2026-11-23T10:18:27","date_gmt":"2026-11-23T02:18:27","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/eft-burst-port-coupling-recovery\/"},"modified":"2026-11-23T10:18:27","modified_gmt":"2026-11-23T02:18:27","slug":"eft-burst-port-coupling-recovery","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/","title":{"rendered":"EFT Burst Immunity: Define the Tested Port, Coupling and Recovery"},"content":{"rendered":"<div class=\"weho-blog\">\n<p>Electrical fast transient testing needs a defined disturbance path and an observable equipment function. A stable DC rail alone cannot establish that the powered controller, communication link or output command behaved acceptably during the burst.<\/p>\n<div class=\"key-takeaways\"><strong>Key Engineering Takeaways<\/strong><\/p>\n<ul>\n<li>Identify the tested port and coupling arrangement before comparing results.<\/li>\n<li>Record equipment behavior alongside the supply voltage.<\/li>\n<li>Separate temporary disturbance, automatic recovery and operator intervention.<\/li>\n<li>Use the governing product requirement for severity and acceptance.<\/li>\n<\/ul>\n<\/div>\n<figure class=\"article-figure hero\" data-asset=\"K01-hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pl\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/5c902365198df58f-ndr-120-24-application.webp\" alt=\"NDR-120-24 product installed in an industrial application scene with original housing and label details.\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" title=\"\"><\/a><figcaption>Application illustration of NDR-120-24 in an equipment setting; not a customer installation photo. Scene created with AI assistance. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c098f4405daa5c57-application-master.webp\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>On this page<\/summary>\n<ol>\n<li><a href=\"#1-write-the-equipment-question-before-the-test-level\">1. Write the equipment question before the test level<\/a><\/li>\n<li><a href=\"#2-connect-each-result-to-its-actual-coupling-path\">2. Connect each result to its actual coupling path<\/a><\/li>\n<li><a href=\"#3-calculate-a-hypothetical-recovery-decision\">3. Calculate a hypothetical recovery decision<\/a><\/li>\n<li><a href=\"#4-keep-recovery-and-severity-in-separate-fields\">4. Keep recovery and severity in separate fields<\/a><\/li>\n<li><a href=\"#5-build-an-actionable-test-and-purchasing-record\">5. Build an actionable test and purchasing record<\/a><\/li>\n<li><a href=\"#6-send-weho-a-bounded-integration-question\">6. Send WEHO a bounded integration question<\/a><\/li>\n<li><a href=\"#7-engineering-faq\">7. Engineering FAQ<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Spis tre\u015bci<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Prze\u0142\u0105cznik Spisu Tre\u015bci\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">D\u017awignia kolankowa<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#1_Write_the_equipment_question_before_the_test_level\" >1. Write the equipment question before the test level<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#2_Connect_each_result_to_its_actual_coupling_path\" >2. Connect each result to its actual coupling path<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#3_Calculate_a_hypothetical_recovery_decision\" >3. Calculate a hypothetical recovery decision<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#4_Keep_recovery_and_severity_in_separate_fields\" >4. Keep recovery and severity in separate fields<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#5_Build_an_actionable_test_and_purchasing_record\" >5. Build an actionable test and purchasing record<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#6_Send_WEHO_a_bounded_integration_question\" >6. Send WEHO a bounded integration question<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#7_Engineering_FAQ\" >7. Engineering FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#Does_a_stable_DC_output_prove_that_an_EFT_test_passed\" >Does a stable DC output prove that an EFT test passed?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#Can_a_signal-cable_clamp_result_replace_a_power-port_result\" >Can a signal-cable clamp result replace a power-port result?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#Is_the_hypothetical_50_ms_recovery_allowance_an_IEC_limit\" >Is the hypothetical 50 ms recovery allowance an IEC limit?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.wehopower.com\/pl\/news\/eft-burst-port-coupling-recovery\/#Does_an_NDR-120-24_photograph_demonstrate_burst_immunity\" >Does an NDR-120-24 photograph demonstrate burst immunity?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"1-write-the-equipment-question-before-the-test-level\"><span class=\"ez-toc-section\" id=\"1_Write_the_equipment_question_before_the_test_level\"><\/span>1. Write the equipment question before the test level<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>An OEM team may receive an EFT result for a supply while its machine has long signal cables, separate enclosures and different grounding paths. The purchasing question is whether the documented arrangement addresses that machine&#39;s required behavior. Start by identifying the equipment boundary, active functions and interfaces rather than copying a headline voltage into the purchase specification.<\/p>\n<p>The <a href=\"https:\/\/www.wehopower.com\/pl\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">WEHO NDR-120-24 product reference<\/a> identifies the supply being discussed in a cabinet integration review. Its presence in an application illustration does not establish an EFT level or recovery result. Request the applicable exact-model report and describe the complete equipment that the report must help assess.<\/p>\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/4222\" target=\"_blank\" rel=\"noopener\">IEC 61000-4-4<\/a> addresses repetitive electrical fast transients applied to supply, signal, control and earth ports. It is a basic test-method publication. The relevant product requirement and approved laboratory plan determine which ports, operating conditions, severities and performance criteria apply to the particular equipment.<\/p>\n<p>EFT is also a different phenomenon from continuous conducted or radiated RF. Keep the <a href=\"https:\/\/www.wehopower.com\/pl\/news\/power-supply-system-rf-immunity-acceptance\/\">equipment RF-immunity acceptance record<\/a> as a related procedure rather than substituting its stimulus for a burst test. A port name shared by two tests does not make the stress or acceptance evidence interchangeable.<\/p>\n<h2 id=\"2-connect-each-result-to-its-actual-coupling-path\"><span class=\"ez-toc-section\" id=\"2_Connect_each_result_to_its_actual_coupling_path\"><\/span>2. Connect each result to its actual coupling path<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Power-port coupling and cable coupling answer different questions. A coupling\/decoupling network applies the disturbance through a defined power-line arrangement, while a capacitive clamp can couple a burst onto a specified cable without making a direct signal-conductor connection. Preserve the arrangement actually used and its governing instructions.<\/p>\n<p><a href=\"https:\/\/www.ametek-cts.com\/products\/productgroups\/transient-generators-surge-and-burst\/coupling-networks-power-lines\" target=\"_blank\" rel=\"noopener\">AMETEK CTS describes power-line coupling networks<\/a> as equipment selected for particular transient-generator and line configurations. That catalog does not authorize an arbitrary network for every supply voltage, current or port. The laboratory must match its rated equipment, operating conditions and reference arrangement to the approved test plan.<\/p>\n<p><a href=\"https:\/\/www.analog.com\/en\/resources\/app-notes\/an-1398.html\" target=\"_blank\" rel=\"noopener\">Analog Devices AN-1398<\/a> gives a concrete signal-interface example using a capacitive coupling clamp. Its interface, cable and observed communication behavior belong to that named design. The useful transferable practice is to record the disturbance path and the function being exercised; its test result is not an NDR result.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Record field<\/th>\n<th scope=\"col\">Power-port case<\/th>\n<th scope=\"col\">Signal-cable case<\/th>\n<th scope=\"col\">Decision supported<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Applied path<\/td>\n<td>Identified power conductors and approved network<\/td>\n<td>Identified cable and approved coupling arrangement<\/td>\n<td>What was actually stressed?<\/td>\n<\/tr>\n<tr>\n<td>Assembly<\/td>\n<td>Supply, external components, load and earth arrangement<\/td>\n<td>Both cable-end devices, shield and auxiliary supplies<\/td>\n<td>Does the tested boundary match the project?<\/td>\n<\/tr>\n<tr>\n<td>Observation<\/td>\n<td>Voltage and relevant powered functions<\/td>\n<td>Communication or input\/output behavior with timestamps<\/td>\n<td>Did equipment behavior satisfy the stated criterion?<\/td>\n<\/tr>\n<tr>\n<td>Recovery<\/td>\n<td>Automatic, reset-command or power-cycle response<\/td>\n<td>Link recovery, data validity and retained state<\/td>\n<td>What intervention was required?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>A photograph of the setup helps identify components but cannot replace the connection record. Record cable identities, lengths, routing and shield treatment in the laboratory configuration. Changes to an auxiliary source or remote receiver can alter the disturbance path while leaving the supply and generator unchanged.<\/p>\n<h2 id=\"3-calculate-a-hypothetical-recovery-decision\"><span class=\"ez-toc-section\" id=\"3_Calculate_a_hypothetical_recovery_decision\"><\/span>3. Calculate a hypothetical recovery decision<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Assume an equipment team declares two independent requirements for one controlled test case. Its external controller must see at least 23.0 V at a named measurement point, and a defined data-valid function must recover within 50 ms after losing validity. These are invented project requirements, not standard thresholds or NDR-120-24 specifications.<\/p>\n<p>Assume the recorded minimum voltage is 23.7 V. Assume data validity is lost at 12 ms and restored at 88 ms on the same timebase. The minimum-voltage margin is 23.7 \u2212 23.0 = 0.7 V, while the observed recovery interval is 88 \u2212 12 = 76 ms.<\/p>\n<p>The latest permitted recovery time would be 12 + 50 = 62 ms. Recovery at 88 ms therefore exceeds that assumed deadline by 26 ms. Under this example&#39;s predeclared criteria, the voltage observation passes and the functional-recovery observation fails; neither result should overwrite the other.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"K01-technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/9b5c6aacd4c76a21-technical.svg\" alt=\"Hypothetical EFT record compares steady controller voltage with a timed interruption of data validity.\" width=\"1200\" height=\"675\" decoding=\"async\" title=\"\"><\/div><figcaption>Conceptual Engineering Diagram. Assumed voltage minimum passes its project window, while a 76 ms data-valid interruption exceeds an assumed 50 ms allowance. No NDR test result is represented. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/9b5c6aacd4c76a21-technical.svg\" target=\"_blank\" rel=\"noopener\">Open full-size diagram<\/a><\/figcaption><p class=\"figure-help\">Swipe horizontally on a small screen, or open the full-size diagram.<\/p>\n<\/figure>\n<p>Do not rename the 76 ms interval a supply interruption unless the voltage record supports that statement. A controller can lose valid communication while the observed rail remains inside its project window. The result identifies a functional failure in the tested arrangement, not its electrical root cause.<\/p>\n<p>The timestamp definition also matters. If one system records the first missing message and another records an application timeout, they can produce different recovery intervals from the same physical event. Retain the raw evidence and the detection rules so another engineer can reproduce the declared comparison.<\/p>\n<h2 id=\"4-keep-recovery-and-severity-in-separate-fields\"><span class=\"ez-toc-section\" id=\"4_Keep_recovery_and_severity_in_separate_fields\"><\/span>4. Keep recovery and severity in separate fields<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A larger generator setting does not automatically describe a better equipment result. Compare only records with the same applicable method, port, coupling, operating state and required behavior. If a report uses a different configuration, identify the gap rather than ranking candidates from its voltage number alone.<\/p>\n<p>The same discipline applies to <a href=\"https:\/\/www.wehopower.com\/pl\/news\/surge-immunity-test-report-port-recovery\/\">surge-report review<\/a>. Surge and EFT must retain their own waveform and coupling evidence. A declaration for one phenomenon cannot fill a missing report for the other, even when both documents refer to an AC input.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Hypothetical observation<\/th>\n<th scope=\"col\">Calculation or record<\/th>\n<th scope=\"col\">Example disposition<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Controller voltage<\/td>\n<td>23.7 V minimum versus assumed 23.0 V minimum<\/td>\n<td>0.7 V positive margin<\/td>\n<\/tr>\n<tr>\n<td>Data-valid recovery<\/td>\n<td>88 ms \u2212 12 ms = 76 ms<\/td>\n<td>26 ms beyond assumed 50 ms allowance<\/td>\n<\/tr>\n<tr>\n<td>Intervention<\/td>\n<td>No operator action assumed in this example<\/td>\n<td>Do not infer behavior after another fault<\/td>\n<\/tr>\n<tr>\n<td>Cause<\/td>\n<td>No root-cause investigation provided<\/td>\n<td>Retain as an unresolved functional finding<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Separate temporary corruption from a permanent setting change. A communication link may reconnect while the application retains an incorrect command, lost count or cleared alarm. The test owner should specify which states must remain correct and which recovery actions are permitted before observing the event.<\/p>\n<figure class=\"article-figure product\" data-asset=\"K01-product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pl\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c1d1da3932e864b9-ndr-120-24-product-reference.webp\" alt=\"NDR-120-24 product reference preserving the original housing, visible label and connection features.\" width=\"800\" height=\"800\" decoding=\"async\" title=\"\"><\/a><figcaption>Product appearance reference for NDR-120-24, preserving the source housing, visible label and connections. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/e03f11f17a629a7f-product-original.jpg\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<h2 id=\"5-build-an-actionable-test-and-purchasing-record\"><span class=\"ez-toc-section\" id=\"5_Build_an_actionable_test_and_purchasing_record\"><\/span>5. Build an actionable test and purchasing record<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li><strong>Define the boundary.<\/strong> Record the exact supply, load, firmware, interfaces and document revisions. Verify that the proposed report addresses this assembly rather than a similar product family.<\/li>\n<li><strong>Assign the disturbance path.<\/strong> Record each selected port, coupling device, cable arrangement and applicable test requirement. Have the laboratory confirm that its setup and ratings implement the intended method.<\/li>\n<li><strong>Declare the observations.<\/strong> Record voltage points, functional indicators, timebase alignment and detection rules. Verify that the required behavior remains observable during the disturbance and recovery.<\/li>\n<li><strong>Judge separate criteria.<\/strong> Record each limit, measured result, automatic recovery and intervention. Recalculate intervals from retained timestamps and identify precisely which requirement passed or failed.<\/li>\n<li><strong>Control the release.<\/strong> Record findings, corrective changes and the affected repeat-test scope. Verify closure against the same stated requirements before approving the configuration for the next project stage.<\/li>\n<\/ol>\n<p>The plan belongs to a properly equipped laboratory using its applicable high-voltage and energy-control procedures. This article defines review records; it provides no generator-wiring instructions or permission to inject disturbances into installed equipment. Product identification, method selection and equipment acceptance remain distinct responsibilities.<\/p>\n<h2 id=\"6-send-weho-a-bounded-integration-question\"><span class=\"ez-toc-section\" id=\"6_Send_WEHO_a_bounded_integration_question\"><\/span>6. Send WEHO a bounded integration question<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For an <a href=\"https:\/\/www.wehopower.com\/pl\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">NDR-120-24 equipment review<\/a>, send the exact model and revision, AC conditions, output loading, relevant ports, intended equipment functions and the required test scope. Include the existing report and clearly identified differences from your assembly. Ask for matching product documentation before treating the supplied component evidence as part of an OEM release.<\/p>\n<h2 id=\"7-engineering-faq\"><span class=\"ez-toc-section\" id=\"7_Engineering_FAQ\"><\/span>7. Engineering FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"does-a-stable-dc-output-prove-that-an-eft-test-passed\"><span class=\"ez-toc-section\" id=\"Does_a_stable_DC_output_prove_that_an_EFT_test_passed\"><\/span>Does a stable DC output prove that an EFT test passed?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. The equipment&#39;s required functions can be disturbed while the observed voltage stays within its declared window. Record the applicable functional criteria alongside the electrical measurements.<\/p>\n<h3 id=\"can-a-signal-cable-clamp-result-replace-a-power-port-result\"><span class=\"ez-toc-section\" id=\"Can_a_signal-cable_clamp_result_replace_a_power-port_result\"><\/span>Can a signal-cable clamp result replace a power-port result?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Not automatically. The coupling path and tested boundary differ. Compare the actual port coverage with the governing equipment requirement and laboratory plan.<\/p>\n<h3 id=\"is-the-hypothetical-50-ms-recovery-allowance-an-iec-limit\"><span class=\"ez-toc-section\" id=\"Is_the_hypothetical_50_ms_recovery_allowance_an_IEC_limit\"><\/span>Is the hypothetical 50 ms recovery allowance an IEC limit?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. It is an explicitly assumed project criterion used to explain the arithmetic. Use the applicable product requirement and approved test plan for a real acceptance decision.<\/p>\n<h3 id=\"does-an-ndr-120-24-photograph-demonstrate-burst-immunity\"><span class=\"ez-toc-section\" id=\"Does_an_NDR-120-24_photograph_demonstrate_burst_immunity\"><\/span>Does an NDR-120-24 photograph demonstrate burst immunity?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. The photograph identifies the product and application context. Exact-model reports and equipment-level evidence are needed for an immunity claim.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Define EFT burst ports, coupling and functional recovery before comparing reports. Send WEHO your NDR-120-24 equipment conditions and evidence needs.<\/p>","protected":false},"author":2,"featured_media":22647,"parent":0,"menu_order":17,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-23593","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/news\/23593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/comments?post=23593"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/news\/23593\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/media\/22647"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/media?parent=23593"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/pl\/wp-json\/wp\/v2\/news_category?post=23593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}