{"id":17118,"date":"2026-09-01T23:31:52","date_gmt":"2026-09-01T15:31:52","guid":{"rendered":"https:\/\/www.wehopower.com\/?post_type=news&#038;p=17118"},"modified":"2026-10-19T11:45:19","modified_gmt":"2026-10-19T03:45:19","slug":"24v-power-supply-manufacturer-oem-rfq-checklist","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/pt\/news\/24v-power-supply-manufacturer-oem-rfq-checklist\/","title":{"rendered":"24V OEM Power Supply RFQ Checklist: Compare Quotes on the Same Basis"},"content":{"rendered":"<div class=\"weho-blog-content\" id=\"weho-article-15\" data-weho-article-id=\"15\">\n<p class=\"direct-answer\">Start an OEM power-supply RFQ with four inputs: source voltage range, continuous and peak output load, installation temperature and mounting space, and expected quantity. When evaluating a 24 V power supply manufacturer for a control cabinet, use the same conditions to compare each bidder\u2019s proposed model, supporting documents and commercial scope. As the shortlist narrows, expand the request into a response matrix, sample acceptance plan, and agreed production requirements. You can begin an inquiry before every matrix row is complete.<\/p>\n<figure class=\"scene-hero\" id=\"application-scene-15\"><a href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-240w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"View WEHO NDR-240-24 product details\" title=\"NDR-240-24 product details\" data-weho-link-kind=\"product_detail\" data-weho-link-role=\"product_image\" data-weho-model=\"NDR-240-24\" class=\"weho-product-image-link\"><picture><source type=\"image\/webp\" srcset=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/15-scene-960.webp 960w, https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/15-scene.webp 1672w\" sizes=\"(max-width:760px) calc(100vw - 36px), 760px\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/15-scene.webp\" width=\"1672\" height=\"941\" alt=\"24V OEM Power Supply RFQ Checklist: Compare Quotes on the Same Basis  title=\" loading=\"eager\" decoding=\"async\" 24v oem power supply rfq checklist: compare quotes on the same basis title =\"\"><\/picture><\/a><figcaption>AI-assisted sample-review illustration. The NDR-240-24 appearance reference and generic documents illustrate RFQ preparation; no actual quotation, qualification result or customer record is shown.<span class=\"weho-image-actions\" data-weho-image-actions=\"1\"><span class=\"weho-image-hint\">NDR-240-24 \u00b7 Select image for product details.<\/span><a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/15-scene.png\" target=\"_blank\" rel=\"noopener noreferrer\" data-weho-link-role=\"view_original\">View larger image \u2197<\/a><\/span><\/figcaption><\/figure>\n<details class=\"article-toc\" open>\n<summary>\u00cdndice<\/summary>\n<nav class=\"toc-links\" aria-label=\"Article sections\"><a href=\"#controlled-requirement-set\">Start with four inputs, then align the RFQ revision<\/a><a href=\"#rfq-response-matrix\">Request a response that can be checked<\/a><a href=\"#same-basis-quote-example\">Normalize bids before comparing price<\/a><a href=\"#documents-and-final-equipment\">Separate component evidence from equipment acceptance<\/a><a href=\"#sample-record\">Make the sample stage resolve the bid&#8217;s assumptions<\/a><a href=\"#production-handoff\">Carry the chosen configuration into production<\/a><\/nav>\n<\/details>\n<section id=\"controlled-requirement-set\">\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_86 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u00cdndice<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar \u00edndice de conte\u00fado\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Alternar<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/pt\/news\/24v-power-supply-manufacturer-oem-rfq-checklist\/#Start_with_four_inputs_then_align_the_RFQ_revision\" >Start with four inputs, then align the RFQ revision<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/pt\/news\/24v-power-supply-manufacturer-oem-rfq-checklist\/#Request_a_response_that_can_be_checked\" >Request a response that can be checked<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/pt\/news\/24v-power-supply-manufacturer-oem-rfq-checklist\/#Normalize_bids_before_comparing_price\" >Normalize bids before comparing price<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/pt\/news\/24v-power-supply-manufacturer-oem-rfq-checklist\/#Separate_component_evidence_from_equipment_acceptance\" >Separate component evidence from equipment acceptance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/pt\/news\/24v-power-supply-manufacturer-oem-rfq-checklist\/#Make_the_sample_stage_resolve_the_bids_assumptions\" >Make the sample stage resolve the bid&#8217;s assumptions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/pt\/news\/24v-power-supply-manufacturer-oem-rfq-checklist\/#Carry_the_chosen_configuration_into_production\" >Carry the chosen configuration into production<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Start_with_four_inputs_then_align_the_RFQ_revision\"><\/span>Start with four inputs, then align the RFQ revision<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A request for quotation becomes difficult to compare when one supplier assumes 230 VAC, another prices a different enclosure, and a third excludes the required test record. For initial screening, share the four inputs above and identify any unknowns. When requesting comparable quotations, put the requirement revision and response deadline on the RFQ cover page and use the same matrix row IDs for every bidder.<\/p>\n<p>Separate mandatory requirements from preferences. A preferred smaller enclosure may be negotiable; a minimum valid load voltage may define whether the equipment operates. Identify who resolves each open item so an unanswered engineering question is not converted into a purchasing assumption.<\/p>\n<p>The minimum useful electrical input is the source range and load profile rather than a wattage label. Include continuous current, startup demand with duration, standby conditions, output setting, load-terminal voltage limits, and how distribution loss will be handled. Use the <a href=\"https:\/\/www.wehopower.com\/pt\/news\/how-to-size-a-24v-din-rail-power-supply-for-a-control-panel\/\" data-weho-link-kind=\"guide\">24 V sizing method<\/a> to establish that profile before asking suppliers to propose capacity.<\/p>\n<p class=\"related-model-documents\">If the mounting format is still open, compare the <a href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-240w-ac-to-dc-single-output-switching-power-supply\/\" data-weho-link-kind=\"product_detail\">NDR-240 product details<\/a> e <a href=\"https:\/\/www.wehopower.com\/pt\/product\/lrs-series-350w-ac-to-dc-single-output-switching-power-supply\/\" data-weho-link-kind=\"product_detail\">LRS-350 product details<\/a> as concrete examples of the two formats. Put the complete candidate model on the RFQ response; neither product reference establishes compliance with the worked requirement\u2019s load, startup or installation conditions.<\/p>\n<\/section>\n<section id=\"rfq-response-matrix\">\n<h2><span class=\"ez-toc-section\" id=\"Request_a_response_that_can_be_checked\"><\/span>Request a response that can be checked<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div class=\"weho-table-wrap\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable comparison table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Requirement block<\/th>\n<th scope=\"col\">Buyer supplies<\/th>\n<th scope=\"col\">Supplier returns<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Electrical operating points<\/td>\n<td>Input range, frequency or DC source, output setting, continuous and transient load, permitted voltage and noise<\/td>\n<td>Exact model and suffix; supported operating points; limits and exceptions with document references<\/td>\n<\/tr>\n<tr>\n<td>Instala\u00e7\u00e3o<\/td>\n<td>Mounting, usable space, orientation, ambient range, airflow, altitude, connectors, and service access<\/td>\n<td>Dimensioned drawing, terminal limits, mounting and cooling instructions, applicable derating data<\/td>\n<\/tr>\n<tr>\n<td>Interfaces and behavior<\/td>\n<td>Required signals, remote control, fault recovery, startup sequence, continuity objective<\/td>\n<td>Interface levels, timing, isolation, protection behavior, and any unsupported functions<\/td>\n<\/tr>\n<tr>\n<td>Product evidence<\/td>\n<td>Required model-specific documents and intended markets<\/td>\n<td>Current specification, relevant declarations or certificates, test evidence, and installation conditions<\/td>\n<\/tr>\n<tr>\n<td>Sample acceptance<\/td>\n<td>Equipment configuration, test points, operating cases, pass limits, and record format<\/td>\n<td>Identified sample configuration and agreed scope of supporting data<\/td>\n<\/tr>\n<tr>\n<td>Commercial scope<\/td>\n<td>Quantity tiers, delivery location and term, forecast basis, packaging, and requested schedule<\/td>\n<td>Price basis, included items, exclusions, validity, order conditions, and proposed schedule<\/td>\n<\/tr>\n<tr>\n<td>Production control<\/td>\n<td>Traceability and notification needs, approved revision, alternate-model policy<\/td>\n<td>Available identification, change-notification proposal, deviation process, and document handoff<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>At the detailed quotation stage, ask for \u201cmeets,\u201d \u201cexception,\u201d or \u201cinformation required\u201d on each row, with the proposed model and a supporting reference where relevant. This lets procurement route a simple question to the right person and compare the remaining gaps fairly. For the installation row, use the <a href=\"https:\/\/www.wehopower.com\/pt\/news\/din-rail-vs-enclosed-power-supply\/\" data-weho-link-kind=\"guide\">mounting-format comparison<\/a> to record the installed envelope, cooling space, and service access alongside the candidate drawing.<\/p>\n<p>Request the document that answers the question: a specification for operating limits, a test report for test conditions and results, a certificate for its covered scope, and an installation manual for use conditions. The distinction also appears in <a href=\"https:\/\/www.meanwell.com\/qa.aspx\" target=\"_blank\" rel=\"noopener noreferrer\">MEAN WELL&#8217;s official documentation FAQ<\/a>; it is useful when organizing responses from any supplier.<\/p>\n<\/section>\n<section id=\"same-basis-quote-example\">\n<h2><span class=\"ez-toc-section\" id=\"Normalize_bids_before_comparing_price\"><\/span>Normalize bids before comparing price<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Consider a hypothetical OEM control cabinet with a 24 V, 6 A continuous load and an 8 A startup demand lasting 200 ms. Assume its required input range is 100\u2013240 VAC, its enclosure ambient is 50\u00b0C, and it uses the mounting orientation and airflow described in the RFQ. These are project requirements chosen for the example, not WEHO specifications.<\/p>\n<p>Two unnamed bids arrive with the same 240 W headline. Bid A supplies only a room-temperature rating. Bid B documents a permitted continuous current of 7 A at the specified installation conditions and supplies a transient record covering the stated 8 A, 200 ms case. Use the <a href=\"https:\/\/www.wehopower.com\/pt\/news\/power-supply-derating-guide\/\" data-weho-link-kind=\"guide\">power-supply derating guide<\/a> to check the installation operating point behind that continuous-current evidence. Neither bid has yet passed the OEM&#8217;s equipment tests.<\/p>\n<figure class=\"batch-figure\" id=\"guide-figure-15\"><picture><source media=\"(max-width:640px)\" type=\"image\/webp\" srcset=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/guide-15-mobile.webp\" width=\"380\" height=\"743\"><source media=\"(max-width:640px)\" type=\"image\/png\" srcset=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/guide-15-mobile.png\" width=\"380\" height=\"743\"><source type=\"image\/webp\" srcset=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/guide-15-desktop.webp\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/guide-15-desktop.png\" width=\"2240\" height=\"1508\" alt=\"24V OEM Power Supply RFQ Checklist: Compare Quotes on the Same Basis  title=\" decoding=\"async\" 24v oem power supply rfq checklist: compare quotes on the same basis title =\"\"><\/picture><figcaption>Hypothetical supplier comparison, not an actual quotation or WEHO performance claim. The RFQ requires 6 A continuous at the defined 50\u00b0C installation and 8 A for 200 ms at startup. Bid B&#8217;s assumed 7 A documented limit gives 1 A of arithmetic headroom; all equipment acceptance tests remain separate.<\/figcaption><a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/guide-15-desktop.png\" target=\"_blank\" rel=\"noopener noreferrer\" class=\"relation-detail\">View full diagram<\/a><\/figure>\n<div class=\"weho-table-wrap\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable comparison table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Comparison row<\/th>\n<th scope=\"col\">Bid A<\/th>\n<th scope=\"col\">Bid B<\/th>\n<th scope=\"col\">Purchasing action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>6 A continuous at stated installation conditions<\/td>\n<td>No supporting operating point<\/td>\n<td>Documented 7 A limit<\/td>\n<td>A needs clarification; B has 1 A of documented arithmetic headroom<\/td>\n<\/tr>\n<tr>\n<td>8 A for 200 ms during startup<\/td>\n<td>Not addressed<\/td>\n<td>Supporting record supplied for matching conditions<\/td>\n<td>Review B&#8217;s endpoint and repeat conditions; include both bids in the same sample test if A resolves its gap<\/td>\n<\/tr>\n<tr>\n<td>Sample configuration<\/td>\n<td>Family name only<\/td>\n<td>Exact suffix and revision stated<\/td>\n<td>Identify A&#8217;s model before ordering a comparison sample<\/td>\n<\/tr>\n<tr>\n<td>Commercial comparison<\/td>\n<td>Packaging excluded<\/td>\n<td>Requested packaging included<\/td>\n<td>Obtain the same scope before calculating a price difference<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The ratio 6 A \u00f7 7 A is about 85.7% utilization at B&#8217;s documented condition. This describes continuous-capacity use at that condition; sample testing still has to cover startup, temperature, and the final equipment. Bid A needs clarification rather than automatic rejection. A single clarification could change the comparison, which is why the response matrix should preserve both the gap and its resolution.<\/p>\n<p>For the commercial review, compare the same currency, quantity, shipping term, destination, packaging, test scope, and validity period. List tooling, engineering charges, freight, taxes, and other costs only where they actually apply and are quoted. Do not bury unknown costs inside an invented \u201ctotal cost\u201d figure.<\/p>\n<\/section>\n<section id=\"documents-and-final-equipment\">\n<h2><span class=\"ez-toc-section\" id=\"Separate_component_evidence_from_equipment_acceptance\"><\/span>Separate component evidence from equipment acceptance<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A power supply&#8217;s evidence helps assess the component. The equipment manufacturer still has to evaluate how it is installed and used. Cables, load, and the final assembly influence system EMC; the <a href=\"https:\/\/www.meanwell.eu\/Upload\/PDF\/EMI_statement_en.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">component-power-supply EMC statement from MEAN WELL<\/a> explains this boundary. Request component test conditions and include the complete equipment in the evaluation plan.<\/p>\n<p>Make document requests specific: full model and output suffix, document revision, covered input range, mounting and cooling conditions, and the exact evidence needed for the intended market and application. Ask the responsible compliance specialist to identify the applicable requirements; a generic request for \u201call certifications\u201d is difficult to answer and does not define product suitability.<\/p>\n<p>Use the <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2021\/11\/NDR-240.pdf\" target=\"_blank\" rel=\"noopener noreferrer\" data-weho-link-kind=\"datasheet\">public NDR-240 specification<\/a> as a document-review example: identify the complete output suffix, then mark which requested operating and installation conditions the sheet states and which still need confirmation. Keep those gaps in the RFQ matrix rather than treating a family headline as a complete requirement match.<\/p>\n<\/section>\n<section id=\"sample-record\">\n<h2><span class=\"ez-toc-section\" id=\"Make_the_sample_stage_resolve_the_bids_assumptions\"><\/span>Make the sample stage resolve the bid&#8217;s assumptions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Identify the sample before testing: model, suffix, hardware or document revision, sample number, voltage adjustment, and any accessories. The sample owner should know whether the item represents the quoted production configuration. If an alternate is supplied, record and assess it as an alternate.<\/p>\n<p>Test the actual points that distinguish proposals. For the hypothetical cabinet, that means steady operation at the specified environment and input corners, the defined startup event, voltage at the critical load, thermal observations, and recovery from the required faults. Include <a href=\"https:\/\/www.wehopower.com\/pt\/news\/power-supply-ripple-acceptance-test-matrix\/\" data-weho-link-kind=\"guide\">ripple acceptance conditions<\/a> only where the load needs them, with a consistent measurement boundary for every sample.<\/p>\n<p>Preserve raw records and link each result to its RFQ row. Classify an issue as a failed requirement, an incomplete test, or a proposed change. A supplier clarification is useful evidence, but it does not retrospectively change a test condition or replace a missing system result.<\/p>\n<\/section>\n<section id=\"production-handoff\">\n<h2><span class=\"ez-toc-section\" id=\"Carry_the_chosen_configuration_into_production\"><\/span>Carry the chosen configuration into production<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Convert the resolved RFQ into a purchase specification or controlled reference set. Record the accepted model, revisions, agreed deviations, packaging and identification, and the evidence retained with the qualification. Avoid placing an unrestricted family name on the bill of materials after qualifying one exact variant.<\/p>\n<p>Discuss notification expectations for component substitutions, hardware changes, firmware where applicable, manufacturing-location changes, and discontinuation. Ask what the supplier can provide and agree the terms; do not assume every supplier offers the same notification period or traceability depth.<\/p>\n<p>An alternate model needs its own interface and application review. Use the <a href=\"https:\/\/www.wehopower.com\/pt\/news\/industrial-power-supply-replacement-interface-validation\/\" data-weho-link-kind=\"guide\">replacement compatibility checklist<\/a> when a purchasing change affects terminals, dimensions, grounding, output behavior, or installation limits. A matching voltage and wattage label is only the start.<\/p>\n<p><a href=\"https:\/\/www.wehopower.com\/pt\/contact\/\" data-weho-link-kind=\"inquiry\">Contact WEHO to start an OEM model review<\/a>. Send four inputs: input range, output load profile, installation temperature and space, and expected quantity. Flag unknowns rather than delaying the inquiry. Use the downloadable RFQ matrix to record model-specific answers as the project moves from screening to sample approval and production.<\/p>\n<\/section>\n<p class=\"worksheet-callout\">Optional project record: <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/weho-blog-batch2-2026-10-17-product-v4-15-oem-power-supply-rfq-matrix.csv\" download=\"\" target=\"_blank\" rel=\"noopener noreferrer\" data-weho-link-kind=\"worksheet\">Download the OEM RFQ response matrix (CSV)<\/a>. Use it to record your own inputs and evidence; example entries are illustrative.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Begin a 24 V OEM inquiry with four practical inputs, then use a detailed response matrix as the project advances. A hypothetical two-bid example separates usable current, startup evidence, sample configuration, and included commercial scope before comparing price.<\/p>","protected":false},"author":1,"featured_media":19472,"parent":0,"menu_order":407,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[149,148,284],"class_list":["post-17118","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-blog","news_category-industry-news","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/17118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/comments?post=17118"}],"version-history":[{"count":2,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/17118\/revisions"}],"predecessor-version":[{"id":19576,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/17118\/revisions\/19576"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media\/19472"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media?parent=17118"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news_category?post=17118"}],"curies":[{"name":"wp ent\u00e3o","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}