{"id":21596,"date":"2026-11-11T11:29:50","date_gmt":"2026-11-11T03:29:50","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/lrs-60-12-standby-input-energy-budget\/"},"modified":"2026-11-11T11:29:50","modified_gmt":"2026-11-11T03:29:50","slug":"lrs-60-12-standby-input-energy-budget","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/","title":{"rendered":"LRS-60-12 Standby Energy: Measure Idle Input Power Separately"},"content":{"rendered":"<div class=\"weho-blog\">\n<p><strong>Key Engineering Takeaways<\/strong><\/p>\n<ul>\n<li>Build an energy budget from real input power and time in each equipment state.<\/li>\n<li>A rated-load specification does not specify idle watts or the assembled cabinet\u2019s standby energy.<\/li>\n<li>Distinguish supply no-load, powered-controller idle and active operation before comparing results.<\/li>\n<li>Keep measured consumption, hypothetical calculations and purchasing requirements clearly separate.<\/li>\n<\/ul>\n<figure class=\"article-figure hero\" data-asset=\"hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pt\/product\/60w-ac-to-dc-switched-mode-power-supply\/\" aria-label=\"LRS-60-12 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/lrs-60-12-cabinet-application.avif\" alt=\"LRS-60-12 Standby Energy: Measure Idle Input Power Separately  title=\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" lrs-60-12 standby energy: measure idle input power separately title =\"\"><\/a><figcaption>AI-assisted cabinet illustration retaining the original LRS-60-12 product artwork. Visible L, N and protective-earth routes are illustrative and do not establish the hidden circuit, energy-measurement boundary, standby consumption or installation approval. Not a customer installation or test. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/lrs-60-12-hero-wiring-corrected-master.png\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>On this page<\/summary>\n<ol>\n<li><a href=\"#why-can-a-long-idle-period-matter-more-than-expected\">Why can a long idle period matter more than expected?<\/a><\/li>\n<li><a href=\"#which-operating-states-should-the-energy-budget-distinguish\">Which operating states should the energy budget distinguish?<\/a><\/li>\n<li><a href=\"#how-should-power-factor-watts-and-energy-be-separated\">How should power factor, watts and energy be separated?<\/a><\/li>\n<li><a href=\"#what-does-an-operating-state-calculation-show\">What does an operating-state calculation show?<\/a><\/li>\n<li><a href=\"#how-should-an-oem-verify-an-idle-power-requirement\">How should an OEM verify an idle-power requirement?<\/a><\/li>\n<li><a href=\"#what-belongs-in-a-standby-energy-technical-enquiry\">What belongs in a standby-energy technical enquiry?<\/a><\/li>\n<li><a href=\"#engineering-faq\">Engineering FAQ<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u00cdndice<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar \u00edndice de conte\u00fado\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Alternar<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Why_can_a_long_idle_period_matter_more_than_expected\" >Why can a long idle period matter more than expected?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Which_operating_states_should_the_energy_budget_distinguish\" >Which operating states should the energy budget distinguish?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#How_should_power_factor_watts_and_energy_be_separated\" >How should power factor, watts and energy be separated?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#What_does_an_operating-state_calculation_show\" >What does an operating-state calculation show?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Hypothetical_Equipment_Energy_Example\" >Hypothetical Equipment Energy Example<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#How_should_an_OEM_verify_an_idle-power_requirement\" >How should an OEM verify an idle-power requirement?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#What_belongs_in_a_standby-energy_technical_enquiry\" >What belongs in a standby-energy technical enquiry?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Engineering_FAQ\" >Engineering FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Does_a_rated-load_efficiency_figure_specify_idle_input_watts\" >Does a rated-load efficiency figure specify idle input watts?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Is_an_unloaded_supply_the_same_as_an_idle_control_cabinet\" >Is an unloaded supply the same as an idle control cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Can_I_estimate_standby_energy_from_an_input-current_nameplate\" >Can I estimate standby energy from an input-current nameplate?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.wehopower.com\/pt\/news\/lrs-60-12-standby-input-energy-budget\/#Can_the_12_kWh_example_be_quoted_as_a_product_saving\" >Can the 12 kWh example be quoted as a product saving?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"why-can-a-long-idle-period-matter-more-than-expected\"><span class=\"ez-toc-section\" id=\"Why_can_a_long_idle_period_matter_more_than_expected\"><\/span>Why can a long idle period matter more than expected?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A modest input-power demand can accumulate significant energy when equipment spends many hours waiting. An OEM engineer therefore needs the actual operating-state profile, rather than choosing a supply from its family wattage or treating a power-factor figure as a standby-energy rating.<\/p>\n<p>The <a href=\"https:\/\/www.wehopower.com\/pt\/product\/60w-ac-to-dc-switched-mode-power-supply\/\">LRS-60-12 power supply reference<\/a> anchors this discussion. Its nominal output rating does not establish the real input power of an idle control cabinet. This article provides an operating-state worksheet and an energy calculation; it does not report measured idle consumption for an LRS-60-12 or promise savings from replacing an existing supply.<\/p>\n<h2 id=\"which-operating-states-should-the-energy-budget-distinguish\"><span class=\"ez-toc-section\" id=\"Which_operating_states_should_the_energy_budget_distinguish\"><\/span>Which operating states should the energy budget distinguish?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Define each state by what remains connected and operating. A supply with its DC output unloaded, a controller waiting for a command and a machine performing work are different configurations, even if someone labels all three \u201cstandby.\u201d<\/p>\n<p>For a useful comparison, record the supply, receiver population, control state and any other loads inside the measurement boundary. A separately powered fan, communications interface or auxiliary supply can change the complete equipment result. State whether it is included instead of silently assigning its consumption to the LRS supply.<\/p>\n<p>Also distinguish an input measurement from a DC-load estimate. Output voltage multiplied by load current describes a DC output-power term under the stated conditions. It does not include all input-side losses, and an assumed efficiency cannot replace an actual input measurement when the purchasing requirement concerns standby watts.<\/p>\n<p>The referenced <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2025\/07\/LRS-60-a07.pdf\">LRS-60 model specification sheet<\/a> provides rated operating data. A rated-load efficiency figure describes a different operating point from an idle cabinet. Request relevant low-load information and verify the intended equipment state rather than extending a rated-load figure across the whole operating cycle.<\/p>\n<figure class=\"article-figure product\" data-asset=\"product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pt\/product\/60w-ac-to-dc-switched-mode-power-supply\/\" aria-label=\"LRS-60-12 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/lrs-60-12-product-reference.avif\" alt=\"LRS-60-12 Standby Energy: Measure Idle Input Power Separately  title=\" width=\"1000\" height=\"1000\" decoding=\"async\" lrs-60-12 standby energy: measure idle input power separately title =\"\"><\/a><figcaption>Official LRS-60-12 product photograph used for identity. The visible nameplate does not establish idle input power or the complete equipment energy consumption. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/lrs-60-12-product-source.jpg\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">State<\/th>\n<th scope=\"col\">Define the boundary<\/th>\n<th scope=\"col\">Record for comparison<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Supply no-load<\/td>\n<td>Exact supply configuration without a DC receiver load<\/td>\n<td>Input condition, measurement method and real input power<\/td>\n<\/tr>\n<tr>\n<td>Controller idle<\/td>\n<td>Connected controller, interfaces and waiting-state functions<\/td>\n<td>Receiver population, software state and average input power<\/td>\n<\/tr>\n<tr>\n<td>Active equipment<\/td>\n<td>Defined operating task and relevant connected loads<\/td>\n<td>Cycle description, duration and representative input energy<\/td>\n<\/tr>\n<tr>\n<td>Transition<\/td>\n<td>Startup, wake, communication burst or shutdown event<\/td>\n<td>Frequency, energy contribution and capture method<\/td>\n<\/tr>\n<tr>\n<td>Disconnected<\/td>\n<td>Actual disconnected measurement boundary<\/td>\n<td>Whether zero input energy is justified for that boundary<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>A controller may keep network communications or monitoring active while its main mechanism is stopped. That is useful functionality, not automatically waste. The procurement decision should state which waiting-state functions must remain available before assigning an energy target or proposing a shutdown strategy.<\/p>\n<h2 id=\"how-should-power-factor-watts-and-energy-be-separated\"><span class=\"ez-toc-section\" id=\"How_should_power_factor_watts_and_energy_be_separated\"><\/span>How should power factor, watts and energy be separated?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Use real input power for the energy calculation and retain power factor as a separate measurement or documented condition. Do not substitute apparent power or an input-current rating for measured real watts.<\/p>\n<p><a href=\"https:\/\/www.fluke.com\/en-au\/learn\/blog\/power-quality\/power-factor-formula\" target=\"_blank\" rel=\"noopener\">Fluke\u2019s power-factor explanation<\/a> distinguishes real power from apparent power and defines their ratio. A favorable PF can be relevant to the source and distribution assessment, but it does not directly state how many watts the idle equipment consumes.<\/p>\n<p>For example, two hypothetical idle configurations could both have favorable PF while drawing different real input powers. Conversely, two configurations could consume similar real watts with different apparent-power demands. Compare the quantities the project actually requires; do not turn either observation into an unsupported efficiency or energy-bill claim.<\/p>\n<p>Energy depends on time as well as power. A device drawing a low power for a long interval can contribute more energy than a higher-power event that occurs briefly. The intended operating schedule is therefore part of the purchasing requirement, not a detail to add after selecting the product.<\/p>\n<h2 id=\"what-does-an-operating-state-calculation-show\"><span class=\"ez-toc-section\" id=\"What_does_an_operating-state_calculation_show\"><\/span>What does an operating-state calculation show?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A state-based calculation makes the consumption assumptions visible. It can support planning and identify which state deserves measurement effort, but it does not prove a particular supply\u2019s consumption.<\/p>\n<h3 id=\"hypothetical-equipment-energy-example\"><span class=\"ez-toc-section\" id=\"Hypothetical_Equipment_Energy_Example\"><\/span>Hypothetical Equipment Energy Example<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Assume an equipment planning period contains 2,000 active hours and 6,000 controller-idle hours. Assume average real input powers of 40 W and 4 W respectively at the defined equipment input boundary. These are illustrative inputs, not LRS-60-12 measurements or datasheet values.<\/p>\n<p>Calculate energy as E = P \u00d7 t, then divide watt-hours by 1,000 to obtain kilowatt-hours. The active-state contribution is 40 W \u00d7 2,000 h \u00f7 1,000 = <strong>80 kWh<\/strong>. The idle contribution is 4 W \u00d7 6,000 h \u00f7 1,000 = <strong>24 kWh<\/strong>. Total energy for the defined 8,000-hour period is <strong>104 kWh<\/strong>.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Assumed state<\/th>\n<th scope=\"col\">Average real input<\/th>\n<th scope=\"col\">Time<\/th>\n<th scope=\"col\">Calculated energy<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Active<\/td>\n<td>40 W<\/td>\n<td>2,000 h<\/td>\n<td>80 kWh<\/td>\n<\/tr>\n<tr>\n<td>Controller idle<\/td>\n<td>4 W<\/td>\n<td>6,000 h<\/td>\n<td>24 kWh<\/td>\n<\/tr>\n<tr>\n<td>Defined period<\/td>\n<td>State-dependent<\/td>\n<td>8,000 h<\/td>\n<td>104 kWh total<\/td>\n<\/tr>\n<tr>\n<td>Alternative idle assumption<\/td>\n<td>2 W<\/td>\n<td>6,000 h<\/td>\n<td>12 kWh for that state<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The idle state accounts for 24 \u00f7 104 \u00d7 100 = approximately <strong>23.1%<\/strong> of the example\u2019s energy, although its assumed power is one-tenth of the active-state power. The calculation covers only the stated period; it should not be described as a complete calendar-year result without accounting for the remaining hours and their states.<\/p>\n<p>Changing the idle assumption from 4 W to 2 W produces a calculated difference of 12 kWh over 6,000 hours. That is a sensitivity example, not an available WEHO product improvement. Any actual equipment change must preserve its required functions and be measured under matched conditions before a saving is claimed.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/lrs-60-12-idle-energy-budget.svg\" alt=\"LRS-60-12 Standby Energy: Measure Idle Input Power Separately  title=\" width=\"1200\" height=\"675\" decoding=\"async\" lrs-60-12 standby energy: measure idle input power separately title =\"\"><\/div><figcaption>Conceptual Engineering Diagram. The 40 W\/2,000 h and 4 W\/6,000 h inputs are hypothetical. Their 80 kWh and 24 kWh contributions do not represent measured LRS-60-12 consumption. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/lrs-60-12-idle-energy-budget.svg\" target=\"_blank\" rel=\"noopener\">Open full-size diagram<\/a><\/figcaption><p class=\"figure-help\">Swipe horizontally on a small screen, or open the full-size diagram.<\/p>\n<\/figure>\n<h2 id=\"how-should-an-oem-verify-an-idle-power-requirement\"><span class=\"ez-toc-section\" id=\"How_should_an_OEM_verify_an_idle-power_requirement\"><\/span>How should an OEM verify an idle-power requirement?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Verify the complete defined state with an appropriate input-power or energy measurement method. Keep the receiver configuration and observation interval repeatable, especially when the controller periodically wakes or communicates.<\/p>\n<ol>\n<li><strong>Set the requirement boundary.<\/strong> State whether the target applies to the supply alone, the DC branch or the complete cabinet input. Define the required waiting-state functions and applicable input and environmental conditions.<\/li>\n<li><strong>Identify the exact configuration.<\/strong> Record the LRS-60-12 unit, relevant revision, receivers, firmware and enabled interfaces. Use the <a href=\"https:\/\/www.wehopower.com\/pt\/product\/60w-ac-to-dc-switched-mode-power-supply\/\">LRS-60-12 product and documentation reference<\/a> to request the information for the intended unit, rather than inferring consumption from the family name.<\/li>\n<li><strong>Choose a suitable method.<\/strong> Qualified personnel should use equipment and a connection procedure appropriate to the electrical installation. Check low-power resolution, uncertainty and the quantity being recorded. This article is not a mains connection or probing instruction.<\/li>\n<li><strong>Capture a representative interval.<\/strong> Allow for the actual state behavior and include relevant complete cycles. Record whether periodic tasks, startup or communications bursts were included. A convenient instantaneous display is not necessarily a representative average.<\/li>\n<li><strong>Retain the raw record.<\/strong> Preserve the power or energy data, interval, state definition, input conditions and method. For changing demand, use accumulated energy over the interval or a suitable time-based record rather than multiplying an arbitrary reading by all operating hours.<\/li>\n<li><strong>Compare matched configurations.<\/strong> Check the result against the project requirement using the method\u2019s uncertainty and agreed acceptance rule. When comparing alternatives, retain equivalent required functions, boundaries and operating conditions. Repeat after a change that affects idle behavior.<\/li>\n<\/ol>\n<p><a href=\"https:\/\/www.fluke.com\/en-ca\/learn\/blog\/power-quality\/making-watt-hour-measurements-with-fluke-power-quality-analyzers\" target=\"_blank\" rel=\"noopener\">Fluke\u2019s watt-hour measurement guidance<\/a> explains the relationship between average power, observation time and energy, and the importance of observing representative load behavior. The applicable instrument instructions still determine the method for a specific measurement setup.<\/p>\n<p>A failed target does not identify the supply as the cause. Review the connected controller\u2019s functions, additional loads and state transitions inside the boundary. Keep any required engineering change separate from the measurement result so the equipment\u2019s functional requirements remain traceable.<\/p>\n<h2 id=\"what-belongs-in-a-standby-energy-technical-enquiry\"><span class=\"ez-toc-section\" id=\"What_belongs_in_a_standby-energy_technical_enquiry\"><\/span>What belongs in a standby-energy technical enquiry?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/www.wehopower.com\/pt\/contact\/\">Send WEHO your idle-power requirement<\/a> with the exact model, input source, connected receiver demand, required functions and operating-state hours. Include the measurement boundary and acceptance method when available, and ask which relevant low-load data can be provided for the intended configuration.<\/p>\n<p>For procurement, retain the accepted state definitions and documentation with the order specification. Neither a rated-output label nor a calculated saving substitutes for a verified equipment result under that specification.<\/p>\n<h2 id=\"engineering-faq\"><span class=\"ez-toc-section\" id=\"Engineering_FAQ\"><\/span>Engineering FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"does-a-rated-load-efficiency-figure-specify-idle-input-watts\"><span class=\"ez-toc-section\" id=\"Does_a_rated-load_efficiency_figure_specify_idle_input_watts\"><\/span>Does a rated-load efficiency figure specify idle input watts?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>A rated-load efficiency figure does not specify idle input watts. It describes a different operating point and requires its stated conditions. Obtain relevant low-load information and measure the defined waiting-state configuration when the project has an idle-energy requirement.<\/p>\n<h3 id=\"is-an-unloaded-supply-the-same-as-an-idle-control-cabinet\"><span class=\"ez-toc-section\" id=\"Is_an_unloaded_supply_the_same_as_an_idle_control_cabinet\"><\/span>Is an unloaded supply the same as an idle control cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>An unloaded supply is not the same configuration as a powered idle cabinet. Connected controllers, communication interfaces and auxiliary functions can consume power. State which loads and functions remain connected before comparing the results.<\/p>\n<h3 id=\"can-i-estimate-standby-energy-from-an-input-current-nameplate\"><span class=\"ez-toc-section\" id=\"Can_I_estimate_standby_energy_from_an_input-current_nameplate\"><\/span>Can I estimate standby energy from an input-current nameplate?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>A nameplate input-current value alone does not establish standby energy. The calculation requires representative real input power or measured energy over a defined interval. Current, voltage and apparent-power information must not be silently substituted for that quantity.<\/p>\n<h3 id=\"can-the-12-kwh-example-be-quoted-as-a-product-saving\"><span class=\"ez-toc-section\" id=\"Can_the_12_kWh_example_be_quoted_as_a_product_saving\"><\/span>Can the 12 kWh example be quoted as a product saving?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The hypothetical 12 kWh difference cannot be quoted as a product saving. It follows from changing an assumed idle input from 4 W to 2 W for 6,000 hours. Actual savings require matched equipment measurements and preservation of the required functions.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Build an LRS-60-12 standby budget from real input watts and operating hours. Separate idle energy from rated-load data and discuss your requirement.<\/p>","protected":false},"author":2,"featured_media":21559,"parent":0,"menu_order":73,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-21596","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/21596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/comments?post=21596"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/21596\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media\/21559"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media?parent=21596"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news_category?post=21596"}],"curies":[{"name":"wp ent\u00e3o","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}