{"id":23271,"date":"2026-11-20T10:05:00","date_gmt":"2026-11-20T02:05:00","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/differential-probe-cmrr-error-budget\/"},"modified":"2026-11-20T10:05:00","modified_gmt":"2026-11-20T02:05:00","slug":"differential-probe-cmrr-error-budget","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/","title":{"rendered":"Differential Probe CMRR: Budget Error at the Relevant Frequency"},"content":{"rendered":"<div class=\"weho-blog\">\n<div class=\"key-takeaways\"><strong>Key Engineering Takeaways<\/strong><\/p>\n<ul>\n<li>Select differential-probe CMRR at the frequencies present in the measurement, rather than using the DC headline alone.<\/li>\n<li>Estimate an input-referred common-mode error component as common-mode amplitude divided by the linear CMRR ratio.<\/li>\n<li>Keep common-mode rejection, permitted input voltage, differential range and loading as separate checks.<\/li>\n<li>Assign an error allowance before judging a small waveform; the calculations below are hypothetical, not WEHO measurements.<\/li>\n<\/ul>\n<\/div>\n<figure class=\"article-figure hero\" data-asset=\"H13-hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/5c902365198df58f-ndr-120-24-application.webp\" alt=\"NDR-120-24 product installed in an industrial application scene with original housing and label details.\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" title=\"\"><\/a><figcaption>NDR-120-24 in an application illustration, not a customer installation photo. Scene created with AI assistance. The image does not establish a differential-probe CMRR or common-mode residual result. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c098f4405daa5c57-ndr-120-24-application-master.webp\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>On this page<\/summary>\n<ol>\n<li><a href=\"#decide-whether-the-probe-can-support-the-measurement\">Decide whether the probe can support the measurement<\/a><\/li>\n<li><a href=\"#define-common-mode-and-the-desired-differential-signal\">Define common mode and the desired differential signal<\/a><\/li>\n<li><a href=\"#match-rejection-to-frequency-and-configuration\">Match rejection to frequency and configuration<\/a><\/li>\n<li><a href=\"#work-a-hypothetical-frequency-specific-error-allowance\">Work a hypothetical frequency-specific error allowance<\/a><\/li>\n<li><a href=\"#compare-evidence-before-accepting-a-near-limit-reading\">Compare evidence before accepting a near-limit reading<\/a><\/li>\n<li><a href=\"#build-a-traceable-probe-capability-record\">Build a traceable probe-capability record<\/a><\/li>\n<li><a href=\"#send-the-measurement-boundary-with-the-enquiry\">Send the measurement boundary with the enquiry<\/a><\/li>\n<li><a href=\"#engineering-faq\">Engineering FAQ<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u00cdndice<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar \u00edndice de conte\u00fado\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Alternar<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Decide_whether_the_probe_can_support_the_measurement\" >Decide whether the probe can support the measurement<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Define_common_mode_and_the_desired_differential_signal\" >Define common mode and the desired differential signal<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Match_rejection_to_frequency_and_configuration\" >Match rejection to frequency and configuration<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Work_a_hypothetical_frequency-specific_error_allowance\" >Work a hypothetical frequency-specific error allowance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Compare_evidence_before_accepting_a_near-limit_reading\" >Compare evidence before accepting a near-limit reading<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Build_a_traceable_probe-capability_record\" >Build a traceable probe-capability record<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Send_the_measurement_boundary_with_the_enquiry\" >Send the measurement boundary with the enquiry<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Engineering_FAQ\" >Engineering FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Does_a_high_DC_CMRR_guarantee_accurate_switching_measurements\" >Does a high DC CMRR guarantee accurate switching measurements?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Can_common-mode_voltage_divided_by_CMRR_estimate_error\" >Can common-mode voltage divided by CMRR estimate error?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Is_probe_bandwidth_the_same_as_common-mode_rejection\" >Is probe bandwidth the same as common-mode rejection?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.wehopower.com\/pt\/news\/differential-probe-cmrr-error-budget\/#Does_this_example_qualify_an_NDR-120-24_ripple_result\" >Does this example qualify an NDR-120-24 ripple result?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"decide-whether-the-probe-can-support-the-measurement\"><span class=\"ez-toc-section\" id=\"Decide_whether_the_probe_can_support_the_measurement\"><\/span>Decide whether the probe can support the measurement<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A small waveform on a power rail can be difficult to distinguish from common-mode feedthrough in the measurement system. Increasing vertical sensitivity does not remove that error. An OEM acceptance plan needs a defensible probe error allowance before a displayed ripple component becomes a product pass or fail.<\/p>\n<p>The <a href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">WEHO NDR-120-24 supply reference<\/a> provides the product context for this external measurement discussion. No common-mode spectrum, output ripple result or probe performance is assigned to that supply. The task is to decide whether the selected instruments can resolve the project&#39;s stated quantity.<\/p>\n<h2 id=\"define-common-mode-and-the-desired-differential-signal\"><span class=\"ez-toc-section\" id=\"Define_common_mode_and_the_desired_differential_signal\"><\/span>Define common mode and the desired differential signal<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For input voltages V<sub>A<\/sub> and V<sub>B<\/sub> measured relative to the probe&#39;s applicable reference, the differential voltage is V<sub>D<\/sub> = V<sub>A<\/sub> \u2212 V<sub>B<\/sub>. The common-mode voltage is V<sub>CM<\/sub> = (V<sub>A<\/sub> + V<sub>B<\/sub>)\/2. A small differential component can coexist with a much larger common-mode component.<\/p>\n<p>Tektronix&#39;s <a href=\"https:\/\/download.tek.com\/document\/51W-60485-0%20IsoVu%20White%20Paper%20%20TN%203-25-16.pdf\" target=\"_blank\" rel=\"noopener\">IsoVu measurement-system white paper<\/a>, in its CMRR discussion, defines rejection through the ratio of differential gain to common-mode gain. A useful positive rejection convention is CMRR<sub>dB<\/sub> = 20 log<sub>10<\/sub>(|A<sub>D<\/sub>\/A<sub>CM<\/sub>|). State that convention because an error-transfer plot can instead show negative attenuation values.<\/p>\n<p>Convert a positive rejection value to a linear ratio using K = 10<sup>CMRRdB\/20<\/sup>. The input-referred residual from one common-mode component is then approximately E<sub>CM<\/sub> = |V<sub>CM<\/sub>|\/K. Use the same amplitude convention on both sides: peak with peak, or RMS with RMS.<\/p>\n<figure class=\"article-figure product\" data-asset=\"H13-product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c1d1da3932e864b9-ndr-120-24-product-reference.webp\" alt=\"NDR-120-24 product reference preserving original housing, model marking and visible connection details for comparison.\" width=\"800\" height=\"800\" decoding=\"async\" title=\"\"><\/a><figcaption>WEHO NDR-120-24 product identification reference, retaining the source image&#8217;s visible identity. The photograph does not establish a differential-probe CMRR or common-mode residual result. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/e03f11f17a629a7f-ndr-120-24-product-original.jpg\" target=\"_blank\" rel=\"noopener\">View original-resolution image<\/a><\/figcaption><\/figure>\n<h2 id=\"match-rejection-to-frequency-and-configuration\"><span class=\"ez-toc-section\" id=\"Match_rejection_to_frequency_and_configuration\"><\/span>Match rejection to frequency and configuration<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>CMRR generally varies with frequency, probe range, accessories and input configuration. A value specified at DC does not establish the same rejection at a fast edge&#39;s relevant frequency content. Probe bandwidth and common-mode rejection describe different properties, so a bandwidth number alone cannot close this check.<\/p>\n<p>Tektronix&#39;s <a href=\"https:\/\/download.tek.com\/document\/51W_60956_0_IsoVu_TB.pdf\" target=\"_blank\" rel=\"noopener\">differential-measurement technical brief<\/a> discusses frequency-dependent rejection and lead-related error. Its comparisons concern the named measurement equipment and historical configurations. Use the underlying measurement questions when reviewing a current probe, without treating those examples as specifications for every modern probe.<\/p>\n<p>A repetition rate also does not fully describe an edge. A slowly repeating event can contain fast transitions and higher-frequency content. Review the waveform feature that matters to the decision and the probe&#39;s corresponding response, rather than selecting CMRR at the repetition frequency simply because it is the easiest number to find.<\/p>\n<h2 id=\"work-a-hypothetical-frequency-specific-error-allowance\"><span class=\"ez-toc-section\" id=\"Work_a_hypothetical_frequency-specific_error_allowance\"><\/span>Work a hypothetical frequency-specific error allowance<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Assume a project assesses a 20 MHz sinusoidal differential component and uses peak amplitude throughout. The observed component is 20 mV peak, with an illustrative project upper limit of 25 mV peak. An independently established common-mode component at the same frequency is assumed to be 12 V peak; none of these values describes an NDR-120-24 test.<\/p>\n<p>The example also assumes all probe input, accessory and operating limits are satisfied, and that stated rejection values can be treated as valid lower bounds for this setup. That assumption is stronger than reading a typical curve. In a real record, distinguish guaranteed specifications, typical information and a separately characterized setup.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<caption>Hypothetical inputs for a single-frequency screening calculation<\/caption>\n<thead>\n<tr>\n<th scope=\"col\">Quantidade<\/th>\n<th scope=\"col\">Assumed value<\/th>\n<th scope=\"col\">Record boundary<\/th>\n<th scope=\"col\">Use<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Common-mode component<\/td>\n<td>12 V peak at 20 MHz<\/td>\n<td>Independent input to this example<\/td>\n<td>Estimate feedthrough<\/td>\n<\/tr>\n<tr>\n<td>Differential observation<\/td>\n<td>20 mV peak at 20 MHz<\/td>\n<td>Illustrative reading<\/td>\n<td>Compare with project limit<\/td>\n<\/tr>\n<tr>\n<td>Gain allowance<\/td>\n<td>2% of 20 mV = 0.4 mV<\/td>\n<td>Assumed bound<\/td>\n<td>Additional error term<\/td>\n<\/tr>\n<tr>\n<td>Other allowance<\/td>\n<td>0.8 mV peak<\/td>\n<td>Assumed aggregate bound<\/td>\n<td>Additional error term<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Hypothetical probe arrangement A provides 40 dB rejection at 20 MHz. Its ratio is 10<sup>40\/20<\/sup> = 100, so the common-mode term is 12\/100 = 0.12 V, or 120 mV peak. That term alone is six times the observed 20 mV component and prevents the intended small-signal decision.<\/p>\n<p>Hypothetical arrangement B provides 80 dB at 20 MHz. Its ratio is 10<sup>80\/20<\/sup> = 10,000, giving 12\/10,000 = 0.0012 V, or 1.2 mV peak. For a conservative bound, add the assumed gain and other allowances: 1.2 + 0.4 + 0.8 = 2.4 mV peak.<\/p>\n<p>Under an explicitly agreed upper-bound decision rule, the example upper result becomes 20 + 2.4 = 22.4 mV peak. That is below the assumed 25 mV limit. This calculation supports the hypothetical screening decision only; it is not a calibrated uncertainty statement, a measured product result or proof that every error source was included.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"H13-technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/4c22afd492611381-differential-probe-cmrr-error-budget.svg\" alt=\"Hypothetical differential-probe comparison separates common-mode feedthrough from additional measurement error allowances.\" width=\"1200\" height=\"675\" decoding=\"async\" title=\"\"><\/div><figcaption>Conceptual Engineering Diagram. Assumed single-frequency common-mode signals and probe rejection values produce an illustrative error allowance; no WEHO measurement or actual probe specification is shown. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/4c22afd492611381-differential-probe-cmrr-error-budget.svg\" target=\"_blank\" rel=\"noopener\">Open full-size diagram<\/a><\/figcaption><p class=\"figure-help\">Swipe horizontally on a small screen, or open the full-size diagram.<\/p>\n<\/figure>\n<p>If only 2 mV peak is allocated to common-mode feedthrough, the required rejection is 20 log<sub>10<\/sub>(12\/0.002) = 75.56 dB. Arrangement B&#39;s assumed 80 dB clears that allocation at 20 MHz. Arrangement A&#39;s 40 dB does not; the difference is a measurement-capability issue before it is a supply-quality issue.<\/p>\n<p>Now suppose arrangement B has only 60 dB at a different, relevant frequency. The same 12 V peak component would contribute 12\/1,000 = 12 mV peak. Approval at one frequency cannot be extended to that second condition without updating the spectrum, rejection and complete allowance.<\/p>\n<h2 id=\"compare-evidence-before-accepting-a-near-limit-reading\"><span class=\"ez-toc-section\" id=\"Compare_evidence_before_accepting_a_near-limit_reading\"><\/span>Compare evidence before accepting a near-limit reading<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The numerical screen assumes linear behavior and a single identified frequency component. A broadband transient needs the system&#39;s frequency and phase response, the actual waveform and a suitable analysis. Do not divide a broadband peak by one favorable CMRR number and label the result a guaranteed transient-error bound.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<caption>Keep independent probe questions separate<\/caption>\n<thead>\n<tr>\n<th scope=\"col\">Question<\/th>\n<th scope=\"col\">Evidence to obtain<\/th>\n<th scope=\"col\">What it establishes<\/th>\n<th scope=\"col\">What remains separate<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Is rejection sufficient?<\/td>\n<td>CMRR versus frequency for the setup<\/td>\n<td>Applicable common-mode error estimate<\/td>\n<td>Input ratings<\/td>\n<\/tr>\n<tr>\n<td>Are inputs within limits?<\/td>\n<td>Each input-to-reference and differential limits<\/td>\n<td>Permitted measurement conditions<\/td>\n<td>Small-signal accuracy<\/td>\n<\/tr>\n<tr>\n<td>Does the probe alter the circuit?<\/td>\n<td>Input impedance and accessory information<\/td>\n<td>Loading assessment<\/td>\n<td>Feedthrough allowance<\/td>\n<\/tr>\n<tr>\n<td>Can the result support acceptance?<\/td>\n<td>Complete allowance and decision rule<\/td>\n<td>Defined near-limit disposition<\/td>\n<td>Other operating states<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The <a href=\"https:\/\/download.tek.com\/manual\/THDP0100-0200-TMDP0200-High-Voltage-Differential-Probe-Instruction-Manual-077054001_RevC.pdf\" target=\"_blank\" rel=\"noopener\">THDP0100\/0200 and TMDP0200 instruction manual<\/a> distinguishes differential limits from each input&#39;s potential relative to ground. Apply the actual instrument&#39;s instructions and applicable ratings. A high CMRR does not authorize a connection outside those limits or justify removing protective earth.<\/p>\n<h2 id=\"build-a-traceable-probe-capability-record\"><span class=\"ez-toc-section\" id=\"Build_a_traceable_probe-capability_record\"><\/span>Build a traceable probe-capability record<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li><strong>Name the measurement.<\/strong> Record test points, quantity, amplitude convention, frequency content and project limit. Accept the definition only when another engineer can distinguish the differential requirement from the common-mode environment.<\/li>\n<li><strong>Identify the complete setup.<\/strong> Record probe model, range, accessories, lead arrangement, oscilloscope settings and document revision. Confirm all applicable input, reference, accessory and operating limits before the equipment procedure permits measurement.<\/li>\n<li><strong>Obtain applicable rejection.<\/strong> Record CMRR across the relevant frequencies and its specified or typical status. A missing guarantee remains unresolved; a DC headline or another range&#39;s curve cannot substitute for the selected configuration.<\/li>\n<li><strong>Calculate the allowance.<\/strong> Record common-mode inputs, rejection conversion, gain, offset, noise and other relevant terms. Verify units, amplitude conventions and whether the chosen bounding or uncertainty method is justified.<\/li>\n<li><strong>Apply the decision rule.<\/strong> Record the reading, allowance, limit and disposition for that state. Hold a near-limit result when the evidence cannot support the agreed rule, rather than automatically attributing the discrepancy to the supply.<\/li>\n<\/ol>\n<p>For the separate question of source and receiver acceptance limits, use the <a href=\"https:\/\/www.wehopower.com\/pt\/news\/power-supply-ripple-acceptance-test-matrix\/\">WEHO ripple acceptance matrix<\/a>. That article organizes acceptance ownership; this procedure checks whether common-mode rejection can support the measurement itself. Preserve both records when the project needs both decisions.<\/p>\n<h2 id=\"send-the-measurement-boundary-with-the-enquiry\"><span class=\"ez-toc-section\" id=\"Send_the_measurement_boundary_with_the_enquiry\"><\/span>Send the measurement boundary with the enquiry<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Include the <a href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">NDR-120-24 project supply reference<\/a>, input and load state, exact external test points, required waveform quantity and instrument configuration in the WEHO enquiry. Separate the requested supply documentation from the probe-capability record. Ask for clarification of an applicable product limit without presenting the hypothetical CMRR calculation as a WEHO test.<\/p>\n<h2 id=\"engineering-faq\"><span class=\"ez-toc-section\" id=\"Engineering_FAQ\"><\/span>Engineering FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"does-a-high-dc-cmrr-guarantee-accurate-switching-measurements\"><span class=\"ez-toc-section\" id=\"Does_a_high_DC_CMRR_guarantee_accurate_switching_measurements\"><\/span>Does a high DC CMRR guarantee accurate switching measurements?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, a DC rejection value does not establish rejection at higher frequencies. Use the selected probe configuration&#39;s frequency-dependent information and the waveform feature being assessed. Check other error terms and input limits separately.<\/p>\n<h3 id=\"can-common-mode-voltage-divided-by-cmrr-estimate-error\"><span class=\"ez-toc-section\" id=\"Can_common-mode_voltage_divided_by_CMRR_estimate_error\"><\/span>Can common-mode voltage divided by CMRR estimate error?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Yes, it can estimate an input-referred component when the linear ratio and frequency conditions apply. Convert positive dB rejection using 10<sup>CMRRdB\/20<\/sup>. A broadband transient requires more information than one ratio.<\/p>\n<h3 id=\"is-probe-bandwidth-the-same-as-common-mode-rejection\"><span class=\"ez-toc-section\" id=\"Is_probe_bandwidth_the_same_as_common-mode_rejection\"><\/span>Is probe bandwidth the same as common-mode rejection?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, bandwidth and rejection are different properties. A probe can pass differential content within its bandwidth while also admitting common-mode error. Both properties must suit the measurement.<\/p>\n<h3 id=\"does-this-example-qualify-an-ndr-120-24-ripple-result\"><span class=\"ez-toc-section\" id=\"Does_this_example_qualify_an_NDR-120-24_ripple_result\"><\/span>Does this example qualify an NDR-120-24 ripple result?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No, the example qualifies no WEHO product result. All numerical signals, rejection values and allowances are hypothetical. A real decision requires the applicable product method, actual instruments and a complete measurement record.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Check differential-probe CMRR versus frequency, calculate common-mode error, and send WEHO an NDR-120-24 measurement enquiry with defined conditions.<\/p>","protected":false},"author":2,"featured_media":22647,"parent":0,"menu_order":34,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-23271","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/23271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/comments?post=23271"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/23271\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media\/22647"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media?parent=23271"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news_category?post=23271"}],"curies":[{"name":"wp ent\u00e3o","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}