{"id":24732,"date":"2026-11-27T10:14:37","date_gmt":"2026-11-27T02:14:37","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/oot-calibration-prior-acceptance-impact\/"},"modified":"2026-11-27T10:14:37","modified_gmt":"2026-11-27T02:14:37","slug":"oot-calibration-prior-acceptance-impact","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/","title":{"rendered":"Out-of-Tolerance Calibration: Trace Earlier Acceptance Decisions"},"content":{"rendered":"<div class=\"weho-blog\">\n<blockquote>\n<p><strong>Principais pontos de engenharia<\/strong><\/p>\n<ul>\n<li>An out-of-tolerance finding starts an impact assessment; it does not identify every affected unit.<\/li>\n<li>Match the failed function and range to actual earlier use.<\/li>\n<li>Preserve as-found data and distinguish conditional calculations from historical facts.<\/li>\n<li>Repairing the instrument does not close earlier product dispositions.<\/li>\n<\/ul>\n<\/blockquote>\n<p>An out-of-tolerance calibration result requires a traceable review of earlier acceptance decisions that could depend on the affected measurement capability. Begin with the actual calibration finding, instrument use and applicable acceptance requirements. Do not assume that every prior unit failed, or that a current adjustment resolves the historical question.<\/p>\n<p>For an OEM inspecting the <a href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">WEHO NDR-120-24<\/a>, the relevant output is a bounded unit-and-decision impact record. The model provides an enquiry identity, not a claim that a WEHO instrument was out of tolerance. All voltages and lot counts below are fictional and do not define the product&#39;s specification.<\/p>\n<figure class=\"article-figure hero\" data-asset=\"K21-hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/5c902365198df58f-ndr-120-24-application.webp\" alt=\"NDR-120-24 product installed in an industrial application scene with original housing and label details.\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" title=\"\"><\/a><figcaption>Application illustration of NDR-120-24 in an equipment setting; not a customer installation photo. Scene created with AI assistance. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c098f4405daa5c57-application-master.webp\" target=\"_blank\" rel=\"noopener\">Ver a imagem em resolu\u00e7\u00e3o original<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>Nesta p\u00e1gina<\/summary>\n<ol>\n<li><a href=\"#preserve-the-calibration-finding-before-interpreting-it\">Preserve the calibration finding before interpreting it<\/a><\/li>\n<li><a href=\"#bound-the-affected-population-with-actual-use\">Bound the affected population with actual use<\/a><\/li>\n<li><a href=\"#use-a-conditional-example-without-backdating-certainty\">Use a conditional example without backdating certainty<\/a><\/li>\n<li><a href=\"#make-a-disposition-record-that-can-be-reviewed\">Make a disposition record that can be reviewed<\/a><\/li>\n<li><a href=\"#prepare-a-traceability-evidence-enquiry\">Prepare a traceability-evidence enquiry<\/a><\/li>\n<li><a href=\"#frequently-asked-questions\">Perguntas frequentes<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u00cdndice<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar \u00edndice de conte\u00fado\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Alternar<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Preserve_the_calibration_finding_before_interpreting_it\" >Preserve the calibration finding before interpreting it<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Bound_the_affected_population_with_actual_use\" >Bound the affected population with actual use<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Use_a_conditional_example_without_backdating_certainty\" >Use a conditional example without backdating certainty<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Make_a_disposition_record_that_can_be_reviewed\" >Make a disposition record that can be reviewed<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Prepare_a_traceability-evidence_enquiry\" >Prepare a traceability-evidence enquiry<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Frequently_asked_questions\" >Perguntas frequentes<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Does_an_OOT_meter_mean_every_earlier_product_failed\" >Does an OOT meter mean every earlier product failed?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Can_the_latest_deviation_be_subtracted_from_every_old_reading\" >Can the latest deviation be subtracted from every old reading?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Does_an_acceptable_as-left_certificate_close_the_investigation\" >Does an acceptable as-left certificate close the investigation?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/pt\/news\/oot-calibration-prior-acceptance-impact\/#Is_a_current_retest_identical_to_the_original_acceptance_test\" >Is a current retest identical to the original acceptance test?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"preserve-the-calibration-finding-before-interpreting-it\"><span class=\"ez-toc-section\" id=\"Preserve_the_calibration_finding_before_interpreting_it\"><\/span>Preserve the calibration finding before interpreting it<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>As-found data describe the observed condition before adjustment or repair. As-left data describe the condition after service under the reported calibration requirements. Request both where relevant, including function, range, test point, result, uncertainty and decision rule; a single overall status discards information needed for the review.<\/p>\n<p><a href=\"https:\/\/www.simco.com\/blogs\/instrument-found-out-of-tolerance-how-to-evaluate-and-document-the-impact\/\" target=\"_blank\" rel=\"noopener\">SIMCO&#39;s guidance on documenting OOT impact<\/a> connects the finding to actual prior use and supporting records. A failed resistance function may have no direct relevance to an application that used only an unaffected voltage function. That exclusion still needs a documented identity and evidence chain.<\/p>\n<p>A current as-found deviation does not establish when the condition began. The instrument may have drifted gradually, changed after an event or behaved intermittently. Avoid assigning a halfway date, a linear trend or a constant historical correction without evidence that supports that model.<\/p>\n<p>The instrument&#39;s calibration tolerance and the product&#39;s acceptance requirement answer different questions. A calibration failure can matter greatly to one application and little to another. Compare the affected capability with the actual measurement process, including its range, uncertainty contributors and decision rule.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Evid\u00eancias<\/th>\n<th scope=\"col\">Pergunta respondida<\/th>\n<th scope=\"col\">Useful record<\/th>\n<th scope=\"col\">Remaining limit<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>As-found calibration<\/td>\n<td>What was observed before service?<\/td>\n<td>Function, point, deviation and uncertainty<\/td>\n<td>Does not establish onset<\/td>\n<\/tr>\n<tr>\n<td>Instrument usage<\/td>\n<td>Which earlier work used that capability?<\/td>\n<td>Station, time, range and unit identity<\/td>\n<td>Missing links widen uncertainty<\/td>\n<\/tr>\n<tr>\n<td>Application requirement<\/td>\n<td>Could the decision be sensitive?<\/td>\n<td>Limits and original decision rule<\/td>\n<td>Not identical to calibration tolerance<\/td>\n<\/tr>\n<tr>\n<td>As-left calibration<\/td>\n<td>What condition followed service?<\/td>\n<td>Post-service results and authorization<\/td>\n<td>Does not close historical impact<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 id=\"bound-the-affected-population-with-actual-use\"><span class=\"ez-toc-section\" id=\"Bound_the_affected_population_with_actual_use\"><\/span>Bound the affected population with actual use<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>An initial search interval may extend from the last relevant documented acceptable condition to discovery. Treat that interval as a scope for investigation, not proof that the instrument was wrong throughout it. Intermediate checks or a documented damage event may help refine the review when their relevance is established.<\/p>\n<p><a href=\"https:\/\/www.transcat.com\/calibration-resources\/white-papers\/non-compliant-conditions-out-of-tolerance-instruments\" target=\"_blank\" rel=\"noopener\">Transcat&#39;s OOT evaluation discussion<\/a> organizes the investigation around what, when, where and how the instrument was used. Connect each candidate measurement to the failed capability before performing detailed calculations. Record why a population was included or excluded rather than relying on a blanket date filter.<\/p>\n<p>A serial-number trail is stronger than an unexplained production total. Identify which station used the instrument, which recipe selected its affected range and which units received the corresponding result. A shared instrument moved between lines may create several populations with different requirements and exposure to the finding.<\/p>\n<p>Missing usage records do not justify a claim of no impact. State the missing link and choose a conservative investigation boundary under the responsible quality process. Independent measurements, retained units and reliable process evidence may support a disposition, but their relevance must be shown rather than assumed.<\/p>\n<figure class=\"article-figure product\" data-asset=\"K21-product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-120-24 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/c1d1da3932e864b9-ndr-120-24-product-reference.webp\" alt=\"NDR-120-24 product reference preserving the original housing, visible label and connection features.\" width=\"800\" height=\"800\" decoding=\"async\" title=\"\"><\/a><figcaption>Product appearance reference for NDR-120-24, preserving the source housing, visible label and connections. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/e03f11f17a629a7f-product-original.jpg\" target=\"_blank\" rel=\"noopener\">Ver a imagem em resolu\u00e7\u00e3o original<\/a><\/figcaption><\/figure>\n<h2 id=\"use-a-conditional-example-without-backdating-certainty\"><span class=\"ez-toc-section\" id=\"Use_a_conditional_example_without_backdating_certainty\"><\/span>Use a conditional example without backdating certainty<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Assume a fictional meter is found to indicate 0.10 V high at a relevant calibration point. Define the sign as indicated value minus reference value, so a conditional corrected estimate is recorded indication minus 0.10 V. Assume, only for this arithmetic, that the same error applied to a particular earlier measurement.<\/p>\n<p>Suppose the fictional application lower acceptance limit was 23.80 V and the earlier indication was 23.85 V. The conditional estimate is 23.85 \u2212 0.10 = 23.75 V, which is 0.05 V below the assumed limit. The calculation identifies a potentially sensitive decision; it does not prove the historical unit actually had that voltage.<\/p>\n<p>A second indication of 24.10 V gives 24.00 V under the same conditional assumption. That greater nominal margin can inform prioritization, but it is not an automatic release. Actual uncertainty, other limits, error applicability and independent evidence still belong in the disposition.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Fictional record<\/th>\n<th scope=\"col\">Original indication<\/th>\n<th scope=\"col\">Conditional estimate<\/th>\n<th scope=\"col\">Review action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Unit A<\/td>\n<td>23.85 V<\/td>\n<td>23.75 V<\/td>\n<td>Investigate lower-limit sensitivity<\/td>\n<\/tr>\n<tr>\n<td>Unit B<\/td>\n<td>24.10 V<\/td>\n<td>24.00 V<\/td>\n<td>Assess full margin and evidence<\/td>\n<\/tr>\n<tr>\n<td>Unit C<\/td>\n<td>Different unaffected function<\/td>\n<td>No voltage correction applied<\/td>\n<td>Document capability-based exclusion<\/td>\n<\/tr>\n<tr>\n<td>Unit D<\/td>\n<td>Instrument identity missing<\/td>\n<td>Not defensibly calculable<\/td>\n<td>Resolve traceability or widen scope<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The calibration laboratory&#39;s uncertainty is not automatically the uncertainty of the earlier production measurement. Probe connections, environment, method and instrument behavior may add contributions. A numerical adjustment without the applicable uncertainty and decision rule can create a misleading appearance of precision.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"K21-technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/2331acbb43641e15-oot-calibration-conditional-impact.svg\" alt=\"Conditional error estimates flag a sensitive earlier decision without claiming the current deviation existed historically.\" width=\"1200\" height=\"675\" decoding=\"async\" title=\"\"><\/div><figcaption>Conceptual Engineering Diagram. A fictional positive 0.10 V indication error is conditionally subtracted from two prior readings. Historical error applicability is unproven; the estimates are not measured product voltages or NDR-120-24 limits. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/2331acbb43641e15-oot-calibration-conditional-impact.svg\" target=\"_blank\" rel=\"noopener\">Abra o diagrama em tamanho real<\/a><\/figcaption><p class=\"figure-help\">Deslize horizontalmente em uma tela pequena, ou abra o diagrama em tamanho completo.<\/p>\n<\/figure>\n<p><a href=\"https:\/\/www.simco.com\/ebook-download\/beyond-the-oot-result-could-previous-measurements-have-been-affected\/\" target=\"_blank\" rel=\"noopener\">SIMCO&#39;s detailed previous-use guide<\/a> explicitly separates current calibration evidence from earlier measurement impact. Retain the original reading, the conditional assumptions and the resulting investigation decision as separate fields. Never overwrite the original result with a calculated historical value presented as a new measurement.<\/p>\n<h2 id=\"make-a-disposition-record-that-can-be-reviewed\"><span class=\"ez-toc-section\" id=\"Make_a_disposition_record_that_can_be_reviewed\"><\/span>Make a disposition record that can be reviewed<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A useful impact record links the instrument finding to identified populations, applicable requirements and the evidence used for each disposition. Use distinct outcomes such as excluded with evidence, potentially affected pending review, and disposition approved by the accountable function. Avoid marking an entire list closed merely because the instrument returned from calibration.<\/p>\n<p>Retesting can provide important new evidence, but its timing and conditions matter. A product may have changed through storage, adjustment, repair or service use. Record what a retest establishes now and explain how that evidence supports the earlier acceptance question rather than treating the two measurements as interchangeable.<\/p>\n<p>The existing <a href=\"https:\/\/www.wehopower.com\/pt\/news\/din-rail-power-supply-first-article-approval-checklist\/\">WEHO first-article approval checklist<\/a> helps organize product and assembly records. OOT review adds a reverse trace from a measurement asset to the decisions it supported. Keep that asset-use connection available even when a delivery report summarizes results at lot level.<\/p>\n<ol>\n<li><strong>Secure the evidence.<\/strong> Preserve the instrument identity, as-found report and original records before adjustment data are lost. Record service actions; verify that the failed capability and error sign are unambiguous.<\/li>\n<li><strong>Map actual use.<\/strong> Link dates, stations, functions and ranges to product records. Record exclusions and missing traceability; verify that every excluded group has a relevant evidence basis.<\/li>\n<li><strong>Assess decision sensitivity.<\/strong> Compare application requirements with supported error scenarios and measurement uncertainty. Record assumptions; verify the arithmetic independently without declaring unobserved historical values as fact.<\/li>\n<li><strong>Choose the disposition.<\/strong> Obtain appropriate technical and quality review of independent evidence, retest or other actions. Record affected unit identities and approvals; verify that pending cases cannot be released by a generic closure flag.<\/li>\n<li><strong>Restore controlled use.<\/strong> Confirm current suitability, configuration and authorization after service. Record future checks or recordkeeping changes; verify that instrument restoration and historical closure remain separately visible.<\/li>\n<\/ol>\n<h2 id=\"prepare-a-traceability-evidence-enquiry\"><span class=\"ez-toc-section\" id=\"Prepare_a_traceability-evidence_enquiry\"><\/span>Prepare a traceability-evidence enquiry<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Send WEHO the exact <a href=\"https:\/\/www.wehopower.com\/pt\/product\/ndr-dinrail-120w-ac-to-dc-single-output-switching-power-supply\/\">NDR-120-24 enquiry identity<\/a>, unit or lot references, original acceptance requirement and the specific evidence you need. Identify whether the affected instrument belongs to your incoming process or another party. Agree the available records and review responsibilities without assuming an actual OOT event or a standard supplier recall outcome.<\/p>\n<h2 id=\"frequently-asked-questions\"><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span>Perguntas frequentes<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"does-an-oot-meter-mean-every-earlier-product-failed\"><span class=\"ez-toc-section\" id=\"Does_an_OOT_meter_mean_every_earlier_product_failed\"><\/span>Does an OOT meter mean every earlier product failed?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. Relevance depends on the failed capability, actual use, requirements and supporting history. An OOT label alone cannot identify which earlier acceptance decisions changed.<\/p>\n<h3 id=\"can-the-latest-deviation-be-subtracted-from-every-old-reading\"><span class=\"ez-toc-section\" id=\"Can_the_latest_deviation_be_subtracted_from_every_old_reading\"><\/span>Can the latest deviation be subtracted from every old reading?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Not automatically. The deviation was observed at calibration and may not have existed unchanged during earlier use. Any retrospective correction needs justified applicability and appropriate uncertainty treatment.<\/p>\n<h3 id=\"does-an-acceptable-as-left-certificate-close-the-investigation\"><span class=\"ez-toc-section\" id=\"Does_an_acceptable_as-left_certificate_close_the_investigation\"><\/span>Does an acceptable as-left certificate close the investigation?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. It supports the instrument&#39;s post-service condition under the calibration requirements. Earlier measurement impact and product dispositions require their own documented review.<\/p>\n<h3 id=\"is-a-current-retest-identical-to-the-original-acceptance-test\"><span class=\"ez-toc-section\" id=\"Is_a_current_retest_identical_to_the_original_acceptance_test\"><\/span>Is a current retest identical to the original acceptance test?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. A retest produces evidence at a new time and under recorded conditions. Explain how product history and method comparability support its use in the historical disposition.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Trace an out-of-tolerance instrument to earlier acceptance records, preserve conditional error assumptions, and enquire about WEHO NDR-120-24 evidence.<\/p>","protected":false},"author":2,"featured_media":22647,"parent":0,"menu_order":10,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-24732","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/24732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/comments?post=24732"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news\/24732\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media\/22647"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/media?parent=24732"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/pt\/wp-json\/wp\/v2\/news_category?post=24732"}],"curies":[{"name":"wp ent\u00e3o","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}