{"id":18888,"date":"2026-10-10T17:11:37","date_gmt":"2026-10-10T09:11:37","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/"},"modified":"2026-10-10T17:11:37","modified_gmt":"2026-10-10T09:11:37","slug":"power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/","title":{"rendered":"Power Supply Transport Vibration: Match the Test Specimen and Protocol to the Shipment"},"content":{"rendered":"<p class=\"standfirst\">A power supply transport-vibration claim is useful only when it names the specimen, the shipment configuration, the test method and the acceptance criteria. An OEM buyer should distinguish a bare supply, a populated machine panel and a packaged machine before comparing reports.<\/p>\n<p>These are different mechanical systems. A supply screwed into a machine can experience the panel&#8217;s response; loose units inside a carton are affected by cushioning and restraints. The transport record must identify what actually moved during the test. A photograph of tidy packaging, or an isolated \u201cvibration tested\u201d line in a quotation, does not close that question.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_86 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u041e\u0433\u043b\u0430\u0432\u043b\u0435\u043d\u0438\u0435<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">\u041f\u0435\u0440\u0435\u043a\u043b\u044e\u0447\u0430\u0442\u044c<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Define_the_specimen_before_choosing_a_protocol\" >Define the specimen before choosing a protocol<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Separate_packaged-product_methods_from_specimen_vibration_methods\" >Separate packaged-product methods from specimen vibration methods<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Keep_the_delivered_revision_visible\" >Keep the delivered revision visible<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Specify_acceptance_before_testing_not_after_damage_appears\" >Specify acceptance before testing, not after damage appears<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Compare_reports_without_inventing_a_severity_ranking\" >Compare reports without inventing a severity ranking<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Frequently_asked_questions\" >Frequently asked questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Does_the_LRS-75_dimensional_sheet_prove_vibration_compliance\" >Does the LRS-75 dimensional sheet prove vibration compliance?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Can_an_individual-unit_report_cover_a_populated_cabinet\" >Can an individual-unit report cover a populated cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Should_the_buyer_choose_the_longest_test_duration\" >Should the buyer choose the longest test duration?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/ru\/news\/power-supply-transport-vibration-match-the-test-specimen-and-protocol-to-the-shipment\/#Can_this_article_provide_the_complete_test_procedure\" >Can this article provide the complete test procedure?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Define_the_specimen_before_choosing_a_protocol\"><\/span>Define the specimen before choosing a protocol<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Start with the delivered full model and revision, then describe the state in which it travels. Is it an individual boxed unit, a master carton of units, a populated control panel or a complete machine on a skid? Include the restraints and packaging configuration in the record. Do not apply a report for one configuration to another without a documented review.<\/p>\n<p>The WEHO example here is the <strong>LRS-75-48<\/strong>: an enclosed chassis supply with a nominal <strong>48 V \/ 1.6 A<\/strong> output. Its complete drawing gives <strong>99 mm overall front-to-rear length, 97 mm terminal-edge width and 30 mm base-to-roof height<\/strong>. The drawing identifies bottom and side M3 fixings. It is not a DIN-rail product.<\/p>\n<p>These facts define a physical specimen, not its transport qualification. The <a href=\"https:\/\/www.wehopower.com\/ru\/product\/75w-power-supply-ac-to-dc-single-output\/\">WEHO English LRS-75 page<\/a> and the approved sheet support the model and envelope, but no route-specific vibration report is supplied with this illustration. The unit is used to explain what an OEM should request, not to imply a passed standard.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i1.wp.com\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/01-application-a-18.png?quality=85&strip=all\" alt=\"Power Supply Transport Vibration: Match the Test Specimen and Protocol to the Shipment  title=\" width=\"1536\" height=\"1024\" power supply transport vibration: match the test specimen and protocol to shipment title =\"\"><\/p>\n<p class=\"image-caption\">Wire-stripping-machine dispatch illustration: the exact supply is chassis-fixed inside the separate electrical bay, with guarded terminal routing. The conditional 48 V interface remains subject to documented receiver qualification. Its installed configuration and machine restraints would need to be defined before selecting a shipment test. No transport test or machine power acceptance is shown.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Separate_packaged-product_methods_from_specimen_vibration_methods\"><\/span>Separate packaged-product methods from specimen vibration methods<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/ista.org\/test_procedures.php\" target=\"_blank\" rel=\"noopener\">ISTA&#8217;s official procedure guide<\/a> separates screening, partial-simulation and general-simulation approaches. Its 1-Series is not an environmental simulation; its 3-Series addresses transport hazards associated with specified shipment types. A procedure number therefore has to be read with its stated scope, not as a universal stronger-or-weaker badge.<\/p>\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/547\" target=\"_blank\" rel=\"noopener\">IEC&#8217;s public summary of IEC 60068-2-64<\/a> describes broadband random vibration and relates acceptance to the relevant specification. It primarily addresses unpackaged specimens, while also discussing container or packaged-product cases. That summary does not supply a universal power-supply spectrum, duration or pass limit.<\/p>\n<p>Ask the laboratory to identify the applicable current method and edition for the intended article and distribution system. This guide uses public scope information only; it does not reproduce a complete standard or select a mandatory test for every shipment. Do not take a random-vibration method named on a component sheet and silently substitute it for a complete transport-package procedure.<\/p>\n<table>\n<thead>\n<tr>\n<th>Question<\/th>\n<th>Evidence to request<\/th>\n<th>Unsupported shortcut<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>What travels?<\/td>\n<td>Photographs and controlled description of the actual specimen and restraints<\/td>\n<td>A model name without its installed or packed state<\/td>\n<\/tr>\n<tr>\n<td>Which environment is represented?<\/td>\n<td>Shipment route, handling mode and method-selection rationale<\/td>\n<td>The same procedure for every distribution system<\/td>\n<\/tr>\n<tr>\n<td>What test was applied?<\/td>\n<td>Method edition, axes, profile, duration and other specified conditions<\/td>\n<td>\u201cTested\u201d without the controlling procedure<\/td>\n<\/tr>\n<tr>\n<td>What makes it acceptable?<\/td>\n<td>Predefined functional and structural criteria with a traceable result<\/td>\n<td>An undamaged outer box or an output lamp alone<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Keep_the_delivered_revision_visible\"><\/span>Keep the delivered revision visible<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The exact LRS-75-48 photograph carries nominal <strong>100\u2013240 VAC \/ 1.52 A, 50\/60 Hz<\/strong> input and <strong>48 V \/ 1.6 A<\/strong> output markings. The broader family sheet is a separate revision-attributed record, not a reason to rewrite the physical sample. Preserve the delivered identity and confirm the ordered revision. This article does not infer a connected machine load, transport test or installation approval from the label.<\/p>\n<p>Also record the real five-position terminal arrangement\u2014L, N, protective earth, \u2212V and +V\u2014its clear guard and the source-specific chassis fixing. Do not replace the unit with a look-alike housing or add a rail adapter to simplify the photograph. If a mounting bracket or harness is part of the shipped product, its identity and attachment belong in the specimen description.<\/p>\n<p>Retain the source photographs, approved mechanical sheet and delivered serial or lot traceability with the report. A later enclosure, terminal cover or mounting change deserves an explicit applicability review rather than reliance on the earlier model string.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i1.wp.com\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/02-application-b-18.png?quality=85&strip=all\" alt=\"Power Supply Transport Vibration: Match the Test Specimen and Protocol to the Shipment  title=\" width=\"1536\" height=\"1024\" power supply transport vibration: match the test specimen and protocol to shipment title =\"\"><\/p>\n<p class=\"image-caption\">Incoming parts-weighing workstation illustration: a technician examines the exact chassis-mounted supply and service access before conductor termination. This is a different application and assembly stage, not proof of energized post-shipment acceptance or weighing-system compatibility.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Specify_acceptance_before_testing_not_after_damage_appears\"><\/span>Specify acceptance before testing, not after damage appears<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Engineering and procurement should agree what the test is intended to resolve. Define the configuration, permitted mechanical condition, electrical checks and disposition process before the specimen is submitted. Use the responsible design authority and qualified laboratory to determine the actual procedure and safe inspection sequence.<\/p>\n<p>For an installed machine panel, distinguish housing damage, fixing displacement, harness damage and functional deviations. Each observation should identify its location and the relevant criterion. The supply&#8217;s nominal output is not itself a complete machine acceptance specification, and a brief no-load voltage reading cannot establish all functions.<\/p>\n<p>For a packaged product, retain the complete specimen state and the checks required by the selected method. Record exceptions and interruptions. If the packaging, fixture or test configuration changed, state which result applies to which version; do not merge the favourable observations into a fictional single passed test.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i1.wp.com\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/03-product-detail-18.png?quality=85&strip=all\" alt=\"Power Supply Transport Vibration: Match the Test Specimen and Protocol to the Shipment  title=\" width=\"1536\" height=\"1024\" power supply transport vibration: match the test specimen and protocol to shipment title =\"\"><\/p>\n<p class=\"image-caption\">Authentic LRS-75-48 identity photograph, uniformly contained without changing its trademark, labels, hexagonal roof perforations, terminal cover or proportions. It is not a test result or an application composite.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Compare_reports_without_inventing_a_severity_ranking\"><\/span>Compare reports without inventing a severity ranking<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A longer vibration duration does not by itself establish a more representative shipment test. The specimen state, vibration profile, mounting, axes and acceptance conditions can differ. Compare those fields before comparing the word \u201cpass.\u201d Where they are not comparable, request clarification rather than treating the reports as interchangeable.<\/p>\n<p>Keep transport qualification separate from operational vibration and shock requirements. A machine&#8217;s installed environment may create a different question from its packaged journey. Neither record should be used to imply the other without an engineering applicability assessment.<\/p>\n<p>The decision record should state the shipment covered, the controlled configuration, the selected procedure, the test result and any limitations. Change control should identify the circumstances that reopen the decision, such as a new packaging design, harness revision or distribution mode. This is a qualification boundary, not a guarantee that no shipment can be damaged.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i1.wp.com\/www.wehopower.com\/wp-content\/uploads\/2026\/10\/04-engineering-context-22.png?quality=85&strip=all\" alt=\"Power Supply Transport Vibration: Match the Test Specimen and Protocol to the Shipment  title=\" width=\"1536\" height=\"1024\" power supply transport vibration: match the test specimen and protocol to shipment title =\"\"><\/p>\n<p class=\"image-caption\">Transport-evidence map: identify the specimen, justify the method and apply predefined acceptance criteria. The engineering diagram does not depict a passed vibration test or universal severity.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span>Frequently asked questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Does_the_LRS-75_dimensional_sheet_prove_vibration_compliance\"><\/span>Does the LRS-75 dimensional sheet prove vibration compliance?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. It defines the product envelope and fixings. A relevant test report and its applicability record are separate evidence.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_an_individual-unit_report_cover_a_populated_cabinet\"><\/span>Can an individual-unit report cover a populated cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Do not assume so. The cabinet, mounting and harness can change the specimen. Ask the responsible engineer to assess the report&#8217;s scope.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Should_the_buyer_choose_the_longest_test_duration\"><\/span>Should the buyer choose the longest test duration?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Not by duration alone. Compare the method, profile, specimen and acceptance conditions against the intended shipment.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_this_article_provide_the_complete_test_procedure\"><\/span>Can this article provide the complete test procedure?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. Obtain the applicable current procedure and qualified laboratory instructions. This article explains the purchasing evidence questions, not a substitute test specification.<\/p>\n<p class=\"editorial-note\">Source-referenced OEM qualification guide. Application scenes are illustrations; no measured test, standard conformity or transport guarantee is asserted for the depicted supply or machines.<\/p>","protected":false},"excerpt":{"rendered":"<p>For OEM buyers, a vibration claim must identify the shipped configuration, test method, severity and acceptance record\u2014not just a packaging photograph.<\/p>","protected":false},"author":2,"featured_media":18884,"parent":0,"menu_order":5,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[149,284],"class_list":["post-18888","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-blog","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/news\/18888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/comments?post=18888"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/news\/18888\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/media\/18884"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/media?parent=18888"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/ru\/wp-json\/wp\/v2\/news_category?post=18888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}