{"id":24736,"date":"2026-11-27T10:15:43","date_gmt":"2026-11-27T02:15:43","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/wire-stripping-damage-cutback-disposition\/"},"modified":"2026-11-27T10:15:43","modified_gmt":"2026-11-27T02:15:43","slug":"wire-stripping-damage-cutback-disposition","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/","title":{"rendered":"Wire-Stripping Damage: Decide Whether Cutback Is Authorized"},"content":{"rendered":"<div class=\"weho-blog\">\n<blockquote>\n<p><strong>Key engineering takeaways<\/strong><\/p>\n<ul>\n<li>Inspect the conductor and insulation after stripping, before hiding the area in a termination.<\/li>\n<li>Do not assume a universal permitted number of damaged strands.<\/li>\n<li>Cutting back a damaged end also changes finished length and routing margin.<\/li>\n<li>Release rework only when the approved preparation and final assembly requirements remain satisfied.<\/li>\n<\/ul>\n<\/blockquote>\n<p>A damaged stripped conductor needs an authorized disposition that considers both workmanship and the remaining wire length. Removing a nicked section can eliminate the visible damage while making the finished harness too short. The practical decision is whether a documented cutback process can restore every applicable requirement, or whether replacement is necessary.<\/p>\n<p>For a panel incorporating the <a href=\"https:\/\/www.wehopower.com\/th\/product\/ndr-dinrail-75w-ac-to-dc-single-output-switching-power-supply\/\">WEHO NDR-75-24<\/a>, begin with the actual wire and terminal instructions. The selected model provides an installation enquiry identity, not a generic stripping allowance. The hypothetical dimensions below are not WEHO terminal strip lengths, harness drawings or accepted damage limits.<\/p>\n<figure class=\"article-figure hero\" data-asset=\"K25-hero\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/th\/product\/ndr-dinrail-75w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-75-24 details\"><img fetchpriority=\"high\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/95bd837f0d66c898-ndr-75-24-application.webp\" alt=\"NDR-75-24 product installed in an industrial application scene with original housing and label details.\" width=\"1200\" height=\"675\" loading=\"eager\" decoding=\"async\" title=\"\"><\/a><figcaption>Application illustration of NDR-75-24 in an equipment setting; not a customer installation photo. Scene created with AI assistance. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/20cd6909cecfb904-application-master.png\" target=\"_blank\" rel=\"noopener\">\u0e14\u0e39\u0e20\u0e32\u0e1e\u0e43\u0e19\u0e02\u0e19\u0e32\u0e14\u0e15\u0e49\u0e19\u0e09\u0e1a\u0e31\u0e1a<\/a><\/figcaption><\/figure>\n<nav class=\"table-of-contents\" aria-label=\"Article contents\">\n<details open>\n<summary>\u0e43\u0e19\u0e2b\u0e19\u0e49\u0e32\u0e19\u0e35\u0e49<\/summary>\n<ol>\n<li><a href=\"#inspect-before-the-termination-hides-the-preparation\">Inspect before the termination hides the preparation<\/a><\/li>\n<li><a href=\"#separate-rework-permission-from-a-possible-physical-action\">Separate rework permission from a possible physical action<\/a><\/li>\n<li><a href=\"#recompute-a-fictional-length-decision\">Recompute a fictional length decision<\/a><\/li>\n<li><a href=\"#verify-the-receiving-connection-as-a-separate-requirement\">Verify the receiving connection as a separate requirement<\/a><\/li>\n<li><a href=\"#execute-a-controlled-preparation-disposition\">Execute a controlled preparation disposition<\/a><\/li>\n<li><a href=\"#prepare-a-wire-preparation-enquiry\">Prepare a wire-preparation enquiry<\/a><\/li>\n<li><a href=\"#frequently-asked-questions\">\u0e04\u0e33\u0e16\u0e32\u0e21\u0e17\u0e35\u0e48\u0e1e\u0e1a\u0e1a\u0e48\u0e2d\u0e22<\/a><\/li>\n<\/ol>\n<\/details>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u0e2a\u0e32\u0e23\u0e1a\u0e31\u0e0d<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">\u0e2a\u0e25\u0e31\u0e1a<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Inspect_before_the_termination_hides_the_preparation\" >Inspect before the termination hides the preparation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Separate_rework_permission_from_a_possible_physical_action\" >Separate rework permission from a possible physical action<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Recompute_a_fictional_length_decision\" >Recompute a fictional length decision<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Verify_the_receiving_connection_as_a_separate_requirement\" >Verify the receiving connection as a separate requirement<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Execute_a_controlled_preparation_disposition\" >Execute a controlled preparation disposition<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Prepare_a_wire-preparation_enquiry\" >Prepare a wire-preparation enquiry<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Frequently_asked_questions\" >\u0e04\u0e33\u0e16\u0e32\u0e21\u0e17\u0e35\u0e48\u0e1e\u0e1a\u0e1a\u0e48\u0e2d\u0e22<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Is_one_damaged_strand_always_acceptable\" >Is one damaged strand always acceptable?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Does_trimming_away_the_damage_automatically_make_the_wire_usable\" >Does trimming away the damage automatically make the wire usable?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Can_a_ferrule_hide_and_repair_a_nicked_conductor\" >Can a ferrule hide and repair a nicked conductor?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.wehopower.com\/th\/news\/wire-stripping-damage-cutback-disposition\/#Should_repeated_stripping_defects_be_handled_only_by_rework\" >Should repeated stripping defects be handled only by rework?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 id=\"inspect-before-the-termination-hides-the-preparation\"><span class=\"ez-toc-section\" id=\"Inspect_before_the_termination_hides_the_preparation\"><\/span>Inspect before the termination hides the preparation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Stripping inspection should distinguish insulation removal, conductor condition and the location of the exposed end. Look for nicked or cut strands, damaged plating where relevant, disturbed construction and insulation defects within the required inspection scope. Use the actual workmanship criteria and an inspection method capable of seeing the relevant condition.<\/p>\n<p><a href=\"https:\/\/assets.phoenixcontact.com\/file\/c1512ff8-7d5d-4b55-9cb4-b5ea6c3d762d\/media\/original?US__Ferrules-Poster_20240214_U006495A.pdf=\" target=\"_blank\" rel=\"noopener\">Phoenix Contact&#39;s ferrule-processing guidance<\/a> illustrates clean preparation and preservation of conductor condition before crimping. A ferrule can cover a defect without repairing it. Inspect and disposition the preparation before the next irreversible or concealing operation.<\/p>\n<p>An intact-looking insulation surface does not exclude conductor damage beneath an incorrectly adjusted stripping tool. Inspect the relevant conductor boundary after preparation and investigate repeated patterns. Do not release a suspect process solely because the assembled connection survives an informal tug.<\/p>\n<p>The applicable wire construction matters. Fine-stranded copper, plated conductors and other constructions may require different approved preparation methods and criteria. A rule taken from a shield braid or a different conductor class must not be transferred into a power conductor without explicit applicability.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Observed condition<\/th>\n<th scope=\"col\">Immediate question<\/th>\n<th scope=\"col\">Evidence needed<\/th>\n<th scope=\"col\">Unsafe assumption<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Nicked or cut conductor<\/td>\n<td>Is the condition permitted or removable?<\/td>\n<td>Applicable workmanship and rework criteria<\/td>\n<td>One missing strand is always acceptable<\/td>\n<\/tr>\n<tr>\n<td>Damaged insulation<\/td>\n<td>Does remaining insulation meet its requirement?<\/td>\n<td>Location, extent and approved disposition<\/td>\n<td>A ferrule collar repairs insulation<\/td>\n<\/tr>\n<tr>\n<td>Too much material removed<\/td>\n<td>Can final geometry still be achieved?<\/td>\n<td>Finished length and terminal preparation limits<\/td>\n<td>Pulling the harness tighter is adequate<\/td>\n<\/tr>\n<tr>\n<td>Repeated preparation defects<\/td>\n<td>Is the tool\/process controlled?<\/td>\n<td>Wire\/tool setup and verification records<\/td>\n<td>Rework alone closes the cause<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 id=\"separate-rework-permission-from-a-possible-physical-action\"><span class=\"ez-toc-section\" id=\"Separate_rework_permission_from_a_possible_physical_action\"><\/span>Separate rework permission from a possible physical action<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A technician may physically be able to trim an end, but that does not establish authorization to alter the harness. Identify who approves rework, which instructions apply and what verification is required afterward. The finished drawing and assembly requirements remain in force unless an authorized change says otherwise.<\/p>\n<p><a href=\"https:\/\/nepp.nasa.gov\/files\/27631\/NSTD87394A.pdf\" target=\"_blank\" rel=\"noopener\">NASA&#39;s 2016 cable-and-harness workmanship standard<\/a> includes conductor-preparation and damage criteria for its controlled application. Read the relevant conductor category rather than borrowing a percentage from an unrelated shield provision. This historical reference does not establish that WEHO or an OEM panel follows NASA acceptance rules.<\/p>\n<p>A cutback plan should identify the complete damaged region and the newly prepared end location. It must also preserve requirements for routing, bend geometry, strain relief, identification and terminal access. Restoring one local surface does not automatically restore the finished assembly.<\/p>\n<p>Do not splice in extra wire or substitute a smaller conductor simply to recover lost length unless the approved design permits that change. Such modifications introduce new interfaces and potentially different electrical or mechanical requirements. Route the decision through the responsible design and quality functions.<\/p>\n<figure class=\"article-figure product\" data-asset=\"K25-product\"><a class=\"product-image-link\" href=\"https:\/\/www.wehopower.com\/th\/product\/ndr-dinrail-75w-ac-to-dc-single-output-switching-power-supply\/\" aria-label=\"NDR-75-24 details\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/ea92f7dea8186865-ndr-75-24-product-reference.avif\" alt=\"NDR-75-24 product reference preserving the original housing, visible label and connection features.\" width=\"1000\" height=\"1000\" decoding=\"async\" title=\"\"><\/a><figcaption>Product appearance reference for NDR-75-24, preserving the source housing, visible label and connections. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/e53a3747d3a5bd9a-product-original.jpg\" target=\"_blank\" rel=\"noopener\">\u0e14\u0e39\u0e20\u0e32\u0e1e\u0e43\u0e19\u0e02\u0e19\u0e32\u0e14\u0e15\u0e49\u0e19\u0e09\u0e1a\u0e31\u0e1a<\/a><\/figcaption><\/figure>\n<h2 id=\"recompute-a-fictional-length-decision\"><span class=\"ez-toc-section\" id=\"Recompute_a_fictional_length_decision\"><\/span>Recompute a fictional length decision<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Assume a fictional harness drawing requires at least 110 mm of usable finished length between two defined drawing reference points. The candidate wire presently provides 120 mm between those same references. An approved damage-removal and retermination assessment determines that the proposed cutback would reduce that finished length by 15 mm.<\/p>\n<p>The remaining length would be 120 \u2212 15 = 105 mm. The margin to the required minimum is 105 \u2212 110 = \u22125 mm, so this proposed rework does not satisfy the assumed drawing. Removing the damaged portion is not sufficient to release the harness under those conditions.<\/p>\n<p>The maximum available reduction under this simplified length requirement is 120 \u2212 110 = 10 mm. That arithmetic is a length budget, not permission to leave damage or choose an insufficient cutback. If complete removal requires 15 mm, the 10 mm budget cannot make that repair compliant.<\/p>\n<div class=\"table-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering table\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Fictional field<\/th>\n<th scope=\"col\">Value<\/th>\n<th scope=\"col\">Calculation<\/th>\n<th scope=\"col\">Decision meaning<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Current usable finished length<\/td>\n<td>120 mm<\/td>\n<td>Same defined drawing references<\/td>\n<td>Starting geometry only<\/td>\n<\/tr>\n<tr>\n<td>Required minimum<\/td>\n<td>110 mm<\/td>\n<td>120 \u2212 110 = 10 mm budget<\/td>\n<td>No other requirement waived<\/td>\n<\/tr>\n<tr>\n<td>Required cutback effect<\/td>\n<td>15 mm<\/td>\n<td>120 \u2212 15 = 105 mm<\/td>\n<td>Proposed final geometry<\/td>\n<\/tr>\n<tr>\n<td>Final length margin<\/td>\n<td>\u22125 mm<\/td>\n<td>105 \u2212 110<\/td>\n<td>Do not release this rework as compliant<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The example assumes the 15 mm is the verified reduction in usable finished length after the required preparation. Actual strip length and termination geometry must be accounted for separately in the real drawing and work instruction. Mixing an exposed-tip measurement with a connector-reference dimension would invalidate the calculation.<\/p>\n<figure class=\"article-figure technical\" data-asset=\"K25-technical\">\n<div class=\"diagram-scroll\" tabindex=\"0\" role=\"region\" aria-label=\"Scrollable engineering diagram\"><img loading=\"lazy\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/7b965955adace287-wire-damage-cutback-length-budget.svg\" alt=\"Fictional cutback removes fifteen millimeters and leaves the remaining harness below its required minimum.\" width=\"1200\" height=\"675\" decoding=\"async\" title=\"\"><\/div><figcaption>Conceptual Engineering Diagram. A fictional 120 mm usable length reduced by 15 mm becomes 105 mm, below an assumed 110 mm minimum. Reference points are identical; actual strip\/termination geometry remains separate. No WEHO strip length or damage allowance is specified. <a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/7b965955adace287-wire-damage-cutback-length-budget.svg\" target=\"_blank\" rel=\"noopener\">Open full-size diagram<\/a><\/figcaption><p class=\"figure-help\">Swipe horizontally on a small screen, or open the full-size diagram.<\/p>\n<\/figure>\n<p>A replacement wire may be the appropriate disposition when compliant cutback is unavailable. Record that outcome and retain evidence of the original defect for process investigation. Do not force a short harness into position or rely on a terminal to carry unintended mechanical tension.<\/p>\n<h2 id=\"verify-the-receiving-connection-as-a-separate-requirement\"><span class=\"ez-toc-section\" id=\"Verify_the_receiving_connection_as_a_separate_requirement\"><\/span>Verify the receiving connection as a separate requirement<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Correctly stripping a wire does not approve every ferrule or terminal combination. <a href=\"https:\/\/www.wago.com\/global\/industries\/building-technology\/electrical-installers\/helpful-tips\/ferrules\" target=\"_blank\" rel=\"noopener\">WAGO&#39;s ferrule guidance<\/a> explains that ferrule length, diameter and collar geometry affect the receiving connection in its documented products. Apply the corresponding instructions for the actual receiving terminal rather than extending WAGO&#39;s approval to a WEHO device.<\/p>\n<p>The new prepared end needs a fresh inspection after cutback. A defective stripping tool can reproduce the same damage on the replacement end. Verify tool suitability and adjustment with the actual wire combination before repeating the operation across a batch.<\/p>\n<p>The related <a href=\"https:\/\/www.wehopower.com\/th\/news\/terminal-torque-records-oem-assembly\/\">WEHO terminal-torque records article<\/a> addresses installation evidence after preparation. A stripping-disposition record supplies a different earlier control: whether the conductor and remaining geometry are suitable to proceed. A completed torque entry cannot retrospectively establish that concealed conductor damage was acceptable.<\/p>\n<p>A good rework record includes the initial condition, approved action, affected identity, final inspection and any dimensional evidence. For repeated defects, identify the affected production interval and tool setup. Keep process corrective action separate from acceptance of each reworked or replaced wire.<\/p>\n<h2 id=\"execute-a-controlled-preparation-disposition\"><span class=\"ez-toc-section\" id=\"Execute_a_controlled_preparation_disposition\"><\/span>Execute a controlled preparation disposition<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li><strong>Stop the concealing operation.<\/strong> Identify the suspect wire and preserve the defect evidence before crimping or installation. Record its location; verify that the condition can be reviewed against the applicable criteria.<\/li>\n<li><strong>Identify the requirements.<\/strong> Retrieve wire, stripping, termination and finished-geometry instructions. Record references and revisions; verify that no shield or different-conductor allowance has been misapplied.<\/li>\n<li><strong>Assess authorized cutback.<\/strong> Define complete damage removal and the resulting usable dimensions. Record the length budget and other affected features; verify all final requirements, not just the damaged tip.<\/li>\n<li><strong>Prepare and inspect again.<\/strong> Use the approved tool\/setup and inspect the newly exposed end. Record the result; verify that the same defect has not been reproduced before concealing the connection.<\/li>\n<li><strong>Release or replace.<\/strong> Obtain the required disposition and retain traceability. Verify final routing and connection evidence; investigate recurring tool or method causes independently of the individual repair.<\/li>\n<\/ol>\n<h2 id=\"prepare-a-wire-preparation-enquiry\"><span class=\"ez-toc-section\" id=\"Prepare_a_wire-preparation_enquiry\"><\/span>Prepare a wire-preparation enquiry<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Send WEHO the exact <a href=\"https:\/\/www.wehopower.com\/th\/product\/ndr-dinrail-75w-ac-to-dc-single-output-switching-power-supply\/\">NDR-75-24 enquiry identity<\/a>, conductor construction, proposed termination and the actual preparation question. Ask for the applicable receiving-terminal instructions while keeping your harness drawing and rework authorization under the responsible design control. No damage allowance or 110 mm requirement in this example applies to the product.<\/p>\n<h2 id=\"frequently-asked-questions\"><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span>\u0e04\u0e33\u0e16\u0e32\u0e21\u0e17\u0e35\u0e48\u0e1e\u0e1a\u0e1a\u0e48\u0e2d\u0e22<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 id=\"is-one-damaged-strand-always-acceptable\"><span class=\"ez-toc-section\" id=\"Is_one_damaged_strand_always_acceptable\"><\/span>Is one damaged strand always acceptable?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. Acceptance depends on the applicable conductor and workmanship requirements. Do not invent a universal strand-loss allowance or transfer a shield-braid criterion to a power conductor.<\/p>\n<h3 id=\"does-trimming-away-the-damage-automatically-make-the-wire-usable\"><span class=\"ez-toc-section\" id=\"Does_trimming_away_the_damage_automatically_make_the_wire_usable\"><\/span>Does trimming away the damage automatically make the wire usable?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. The remaining finished length, preparation, routing and connection requirements must still be satisfied. A physically clean end can belong to a harness that is now too short.<\/p>\n<h3 id=\"can-a-ferrule-hide-and-repair-a-nicked-conductor\"><span class=\"ez-toc-section\" id=\"Can_a_ferrule_hide_and_repair_a_nicked_conductor\"><\/span>Can a ferrule hide and repair a nicked conductor?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. A ferrule is a termination component, not evidence that prior damage has been repaired. Inspect and disposition the conductor before a crimp conceals the affected region.<\/p>\n<h3 id=\"should-repeated-stripping-defects-be-handled-only-by-rework\"><span class=\"ez-toc-section\" id=\"Should_repeated_stripping_defects_be_handled_only_by_rework\"><\/span>Should repeated stripping defects be handled only by rework?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. Individual dispositions address the affected wires, while repeated defects require a tool and process investigation. Verify the actual wire\/tool setup before allowing the preparation process to continue.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Inspect stripping damage before termination, verify remaining harness length after authorized cutback, and enquire about WEHO NDR-75-24 wire preparation.<\/p>","protected":false},"author":2,"featured_media":23251,"parent":0,"menu_order":6,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-24736","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/news\/24736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/comments?post=24736"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/news\/24736\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/media\/23251"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/media?parent=24736"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/th\/wp-json\/wp\/v2\/news_category?post=24736"}],"curies":[{"name":"\u0e2b\u0e19\u0e49\u0e32","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}