{"id":20998,"date":"2026-11-07T10:07:25","date_gmt":"2026-11-07T02:07:25","guid":{"rendered":"https:\/\/www.wehopower.com\/news\/power-supply-voltage-tolerance-no-double-count\/"},"modified":"2026-11-07T10:07:25","modified_gmt":"2026-11-07T02:07:25","slug":"power-supply-voltage-tolerance-no-double-count","status":"publish","type":"news","link":"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/","title":{"rendered":"Power Supply Voltage Tolerance: Avoid Counting Line and Load Regulation Twice"},"content":{"rendered":"<figure class=\"hero\"><a href=\"https:\/\/www.wehopower.com\/tr\/product\/100-guarantee-mdr-series-20w-5v-12v-24v-switching-power-supply\/\"><img decoding=\"async\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/hero-26.webp\" alt=\"Power Supply Voltage Tolerance: Avoid Counting Line and Load Regulation Twice  title=\" fetchpriority=\"high\" power supply voltage tolerance: avoid counting line and load regulation twice title=\"\"><\/a><figcaption>Illustrative MDR-20-24 specification review: setup tolerance, line regulation and load regulation sit inside one stated tolerance definition; external cable and contact loss is considered separately. The screen is an explanatory graphic based on the manufacturer product-page Note3, not measured data. Scene created with AI assistance; original product artwork retained. AI-assisted illustration.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original-19.jpg\">View original product image<\/a><\/figure>\n<p><strong>When a datasheet says voltage tolerance already includes setup tolerance, line regulation and load regulation, do not add those same terms again without a separate reason.<\/strong> Read the note that defines the number before building a worst-case receiver voltage budget.<\/p>\n<p>The MDR-20-24 provides a useful documented example. This article is for an OEM reviewer comparing a receiver\u2019s allowable input with a source specification; it does not convert typical performance into a guaranteed system limit.<\/p>\n<nav class=\"toc\" aria-label=\"On this page\">\n<ol>\n<li><a href=\"#read-the-note\">Read the tolerance note with the model column<\/a><\/li>\n<li><a href=\"#calculate-dc-envelope\">Calculate the stated DC tolerance envelope first<\/a><\/li>\n<li><a href=\"#keep-other-effects-separate\">Keep cable loss, ripple and events in their own categories<\/a><\/li>\n<li><a href=\"#budget-at-receiver\">Apply an external path loss to the correct envelope<\/a><\/li>\n<li><a href=\"#make-review-reproducible\">Make the budget reproducible for purchasing and service<\/a><\/li>\n<\/ol>\n<\/nav>\n<section id=\"read-the-note\">\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u0130\u00e7indekiler<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"\u0130\u00e7indekiler Tablosunu A\u00e7\/Kapat\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Ge\u00e7i\u015f yapmak<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/#Read_the_tolerance_note_with_the_model_column\" >Read the tolerance note with the model column<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/#Calculate_the_stated_DC_tolerance_envelope_first\" >Calculate the stated DC tolerance envelope first<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/#Keep_cable_loss_ripple_and_events_in_their_own_categories\" >Keep cable loss, ripple and events in their own categories<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/#Apply_an_external_path_loss_to_the_correct_envelope\" >Apply an external path loss to the correct envelope<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/#Make_the_budget_reproducible_for_purchasing_and_service\" >Make the budget reproducible for purchasing and service<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/#Voltage_budget_term_register\" >Voltage budget term register<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.wehopower.com\/tr\/news\/power-supply-voltage-tolerance-no-double-count\/#Sources_and_further_reading\" >Sources and further reading<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Read_the_tolerance_note_with_the_model_column\"><\/span>Read the tolerance note with the model column<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The <a href=\"https:\/\/www.wehopower.com\/tr\/product\/100-guarantee-mdr-series-20w-5v-12v-24v-switching-power-supply\/\">MDR-20 product table<\/a> gives \u00b11.0% voltage tolerance for the 24 V column. Note 3 states that tolerance includes setup tolerance, line regulation and load regulation. The separate \u00b11.0% line and load rows should therefore not automatically be summed on top of the stated combined tolerance.<\/p>\n<p>Keep the exact model, revision and conditions attached to that interpretation. Note 1 states the default measurement conditions for unspecified parameters. A note that defines included terms does not erase separate environmental, wiring or transient conditions that the receiver must also survive.<\/p>\n<figure id=\"fig-original\" class=\"product-original\"><a href=\"https:\/\/www.wehopower.com\/tr\/product\/100-guarantee-mdr-series-20w-5v-12v-24v-switching-power-supply\/\"><img decoding=\"async\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original-19.jpg\" alt=\"Power Supply Voltage Tolerance: Avoid Counting Line and Load Regulation Twice  title=\" loading=\"lazy\" power supply voltage tolerance: avoid counting line and load regulation twice title=\"\"><\/a><figcaption>Manufacturer image showing the WEHO MDR-20-24; the photograph identifies the pictured unit and does not establish equipment-level suitability.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/original-19.jpg\">View original image<\/a><\/figure>\n<\/section>\n<section id=\"calculate-dc-envelope\">\n<h2><span class=\"ez-toc-section\" id=\"Calculate_the_stated_DC_tolerance_envelope_first\"><\/span>Calculate the stated DC tolerance envelope first<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>At an assumed nominal setting of 24.00 V, \u00b11.0% is \u00b10.24 V. The corresponding preliminary DC envelope is <strong>23.76\u201324.24 V<\/strong>. Automatically adding another one percent for line and another for load would produce 23.28\u201324.72 V and count included terms more than once.<\/p>\n<p>This arithmetic does not prove that every unit in every enclosure remains within the first envelope. Check the table\u2019s conditions, the actual approved setting and any separate applicable temperature or installation effects. If a supplier defines a different combined limit for the supplied revision, use that documented definition.<\/p>\n<figure id=\"fig-diagram\" class=\"diagram\"><img decoding=\"async\" class=\"technical-desktop\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-26.svg\" alt=\"Power Supply Voltage Tolerance: Avoid Counting Line and Load Regulation Twice  title=\" loading=\"lazy\" power supply voltage tolerance: avoid counting line and load regulation twice title=\"\"><img decoding=\"async\" class=\"technical-mobile\" src=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-mobile-26.svg\" alt=\"Power Supply Voltage Tolerance: Avoid Counting Line and Load Regulation Twice  title=\" loading=\"lazy\" power supply voltage tolerance: avoid counting line and load regulation twice title=\"\"><figcaption>Hypothetical nominal setting and external loss; not a full dynamic acceptance envelope.<\/figcaption><a class=\"original-link\" href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2026\/11\/diagram-26.svg\">Open full-size technical illustration<\/a><\/figure>\n<\/section>\n<section id=\"keep-other-effects-separate\">\n<h2><span class=\"ez-toc-section\" id=\"Keep_cable_loss_ripple_and_events_in_their_own_categories\"><\/span>Keep cable loss, ripple and events in their own categories<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div class=\"table-scroll\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">\u00d6\u011fe<\/th>\n<th scope=\"col\">Treatment in a budget<\/th>\n<th scope=\"col\">Important distinction<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Combined DC tolerance<\/td>\n<td>Use its documented included terms<\/td>\n<td>Do not re-add the same line\/load errors<\/td>\n<\/tr>\n<tr>\n<td>Cable and contact drop<\/td>\n<td>Subtract the applicable loaded path loss<\/td>\n<td>It occurs outside the source measurement points<\/td>\n<\/tr>\n<tr>\n<td>Dalgalanma ve g\u00fcr\u00fclt\u00fc<\/td>\n<td>Use the stated method, bandwidth and receiver criterion<\/td>\n<td>Peak-to-peak ripple is not a DC accuracy percentage<\/td>\n<\/tr>\n<tr>\n<td>Transient response<\/td>\n<td>Check time-dependent receiver limits<\/td>\n<td>A steady-state tolerance is not a transient bound<\/td>\n<\/tr>\n<tr>\n<td>Temperature effect<\/td>\n<td>Apply only the applicable documented relationship<\/td>\n<td>Do not invent the reference or direction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The table lists 150 mV peak-to-peak ripple and noise for the 24 V column, with a stated measurement method. That is not permission to add 150 mV to both ends of a DC tolerance range. Whether and how a dynamic waveform is combined depends on the source definition and the receiver\u2019s actual acceptance criterion.<\/p>\n<\/section>\n<section id=\"budget-at-receiver\">\n<h2><span class=\"ez-toc-section\" id=\"Apply_an_external_path_loss_to_the_correct_envelope\"><\/span>Apply an external path loss to the correct envelope<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Suppose a hypothetical approved DC source envelope is 23.76\u201324.24 V and the external path can lose up to 0.45 V under load. A preliminary loaded lower value is <strong>23.31 V<\/strong>. The upper value needs its own state analysis: with negligible load the path drop may be near zero, so subtracting 0.45 V from the upper source value would incorrectly hide a possible 24.24 V receiver condition.<\/p>\n<p>Use the receiver\u2019s documented minimum and maximum for the relevant steady and dynamic conditions. If its minimum is 23.5 V, this illustrative lower-value screen fails by 0.19 V. Do not round away that result or increase the source setting without reopening the upper-voltage and other-load checks.<\/p>\n<\/section>\n<section id=\"make-review-reproducible\">\n<h2><span class=\"ez-toc-section\" id=\"Make_the_budget_reproducible_for_purchasing_and_service\"><\/span>Make the budget reproducible for purchasing and service<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For each term, record where it is measured, whether it is already included elsewhere, its sign and conditions, and its source. Keep unknown terms visible in the engineering record. This prevents both excessive pessimism from double counting and false optimism from silently dropping a real loss.<\/p>\n<p>At acceptance, measure using a method appropriate to the particular criterion. A handheld DC reading, a bandwidth-limited noise measurement and a transient capture answer different questions. Compare each with its corresponding limit and preserve the instrument settings and circuit state.<\/p>\n<\/section>\n<section class=\"cta\">\n<p>For an <a href=\"https:\/\/www.wehopower.com\/tr\/product\/100-guarantee-mdr-series-20w-5v-12v-24v-switching-power-supply\/\">MDR-20-24 voltage-budget review<\/a>, send the exact datasheet revision, approved setpoint, receiver limits and a worksheet identifying included tolerance terms, external drops and dynamic criteria. Ask for clarification of any undocumented term before converting the budget into an acceptance limit.<\/p>\n<\/section>\n<section id=\"worksheet\" class=\"sheet\">\n<h2><span class=\"ez-toc-section\" id=\"Voltage_budget_term_register\"><\/span>Voltage budget term register<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div class=\"sheet-row\"><label>Source revision<input aria-label=\"Source revision\"><\/label><label>Approved setting<input aria-label=\"Approved setting\"><\/label><label>Receiver limits<input aria-label=\"Receiver limits\"><\/label><label>Measurement conditions<input aria-label=\"Measurement conditions\"><\/label><\/div>\n<div class=\"table-scroll\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Term<\/th>\n<th scope=\"col\">Included in another term?<\/th>\n<th scope=\"col\">Limit and direction<\/th>\n<th scope=\"col\">Source\/conditions<\/th>\n<th scope=\"col\">Budget result<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<\/tr>\n<tr>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<td contenteditable=\"true\" aria-label=\"Worksheet cell\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Blank project worksheet. Enter verified project data; example calculations above are not measurements.<\/p>\n<\/section>\n<section class=\"source-list\">\n<h2><span class=\"ez-toc-section\" id=\"Sources_and_further_reading\"><\/span>Sources and further reading<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li><a href=\"https:\/\/www.wehopower.com\/tr\/product\/100-guarantee-mdr-series-20w-5v-12v-24v-switching-power-supply\/\">WEHO MDR-20 product information<\/a><\/li>\n<li><a href=\"https:\/\/www.wehopower.com\/wp-content\/uploads\/2021\/11\/MDR-20.pdf\">WEHO MDR-20 specification<\/a><\/li>\n<\/ol>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Read the MDR-20 tolerance note, separate DC accuracy from ripple and build a receiver voltage budget without adding the same error terms twice.<\/p>","protected":false},"author":2,"featured_media":20968,"parent":0,"menu_order":85,"comment_status":"","ping_status":"","template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"news_category":[284],"class_list":["post-20998","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-product-articles","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/news\/20998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/comments?post=20998"}],"version-history":[{"count":0,"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/news\/20998\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/media\/20968"}],"wp:attachment":[{"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/media?parent=20998"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.wehopower.com\/tr\/wp-json\/wp\/v2\/news_category?post=20998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}