블로그

imageye imgi 6 장식

Adding an LC Output Filter to an SMPS: Check Ringing, Sensing and Load Steps

Review an SMPS output LC filter with a resonance calculation, sensing checks and a before-and-after test matrix for ripple, startup

Power Supply Startup Time: Separate Setup Delay from Voltage Rise

Define the input event, output thresholds and controller-ready deadline before comparing power supply startup times.

Electronic Loads for Power Supply Testing: Choose CC, CR, CP or CV Mode

Match the load control law to the real device, then check voltage, current, power and dynamic limits before accepting a

Power Supply Short-Circuit Testing: Define the Fault and Recovery Record

Specify the fault and record its actual exposure, supply response and equipment recovery before assigning a pass result.

Programmable AC Source vs AC-DC Power Supply: Choose the Right Input-Test Equipment

Assign the source, DUT and output-load roles, then map the required input stimulus to documented test-equipment capabilities.

DC-DC Soft Start: Specify the Ramp and Upstream Current

Turn a soft-start feature into a defined ramp, input-current question and startup qualification matrix for the complete assembly.

DC-DC Remote On/Off: Specify the Control Interface Before Wiring

Define the exact control interface and verify its state through reset and power sequencing before approving a converter connection.

DC-DC Output Capacitors: Verify the Allowed Range and ESR

Check effective capacitance, ESR, layout and test conditions before adding or replacing output capacitors on a DC-DC converter.

Synchronous vs Non-Synchronous Buck Converters: What OEMs Should Verify

Compare buck-converter rectification, matched losses, light-load behavior and terminal current limits before approving a module or substitute.

Bidirectional DC-DC Converter vs a One-Way Supply: Map the Required Power Flow

Build a two-port qualification matrix for forward transfer, reverse transfer, direction changes and receiver limits before specifying a DC-DC converter.

Capacitive Load Startup: Check Charging Current Before Choosing a Power Supply

A modest running load can still prevent a DC rail from starting. Calculate the capacitor charging demand, include the load

Power Supply Reverse Current: Define Where Returned Energy Goes

A source that delivers a load current is not automatically able to accept current coming back. Define the power path