Blog

imageye imgi 6 Dekor

RSP-350-12 Load Steps: Check Receiver Voltage Limits

Check RSP-350-12 load events against the receiver voltage window. Record source and load-end limits, then send WEHO your operating conditions.

XLG-25-24 Harness: Check Connector Views and Polarity

Check an XLG-25-24 external harness for mirrored connector views and reversed polarity. Use the pin-map worksheet and ask WEHO for

XLG-75-24 Shared LED Branches: Test Service Continuity

Map XLG-75-24 LED branches and define what must stay lit during service or a fault. Use the continuity worksheet and

XLG-1200-48 Branch Off: Map the Alternate Energy Paths

Map XLG-1200-48 lighting commands, auxiliary supplies and signal paths before defining branch off. Send WEHO your source and controller boundaries.

HVG-250 High-Line Input: Review the AC Switching Path

Review external AC switching components around an HVG-250 high-line driver. Separate coil and contact ratings, then send WEHO your feed

LED Driver Startup: Verify Staggered Current Events

Verify staggered LED driver startup using one command, contact and current timeline. Download the event record and send WEHO your

HLG-120 Replacement: Verify Dimming Interface Evidence

Check control-interface evidence before replacing an LED driver with HLG-120-24. Download the interface register and send WEHO your controller details.

LED Driver Field Checks: Match the Operating Points

Compare factory, site and return LED driver readings at matched operating points. Download the record and send WEHO the load

EDR-480 Dimensions: Resolve 85 and 85.5 mm Width Data

Resolve conflicting EDR-480 width entries before releasing a cabinet layout. Download the conflict register and request the applicable drawing from

Guard-Door Proximity Sensors: Process Feedback or Safety Function?

Separate guard-position indication from the complete safety function. Send WEHO the exact sensor purpose and request applicable model evidence for

Grounded vs Ungrounded Thermocouples: Check Input Isolation

Map thermocouple junction, sheath and controller reference paths. Send WEHO the probe construction and isolation requirements for your TX4 input

Inductive Sensors in Series or Parallel: Validate AND/OR Logic

Check series or parallel sensor logic, receiver limits and power-loss states. Send WEHO the exact output variant and AND/OR requirement