- A load that runs in continuous mode may fail to wake an inverter from search mode.
- Qualify the detection pulse, load startup sequence and required service delay together.
- Rated watts and a low standby figure cannot establish reliable intermittent-load operation.
- Confirm whether the exact WHP configuration offers search mode before requesting a wake-up test.

Define the service that must wake up
An unattended equipment station may spend most of its time waiting for a small controller to request AC power. An inverter that periodically searches for load can save idle energy, but a missed request can prevent the intended service. The engineering decision is whether the complete load reliably wakes the selected inverter within the project's allowed delay.
Der WEHO WHP-2000 inverter reference identifies an enquiry candidate, not a confirmed ECO feature. Establish the exact DC input, AC output and ordered configuration first. A family product name does not prove that search operation or an adjustable detection threshold is provided.
Separate search operation from ordinary standby
Search mode intentionally interrupts sustained AC output while checking for a connected load. Victron's SUN Inverter operation manual describes brief periodic output checks followed by continued operation when the load exceeds its configured threshold. That manufacturer-specific behavior explains the qualification problem; it is not a WHP operating instruction.
Continuous standby leaves usable AC present while the load waits for its own command. Search operation can instead require the load to draw enough current during a brief energization interval. A small electronic controller that needs a sustained boot period may never present the expected load during that interval.
The relevant demand is the actual energized behavior, not merely the wattage printed on the finished machine. Record the waiting controller, its supply, downstream relay or contactor, and the final service load separately. Determine which component must operate before the larger load becomes electrically visible.
Der Samlex Xtender manual, section 7.1.1, treats load detection as a configurable sensitivity function and discusses small loads that may not be detected. Its settings apply to the named Xtender equipment only. Use an applicable inverter manual to define the sequence rather than borrowing another manufacturer's threshold.

Model a detection-window conflict before testing
Consider a hypothetical remote inspection station with an AC-powered interface that needs 0.40 seconds of uninterrupted power before closing its service relay. Suppose a candidate inverter supplies a 0.15-second search pulse every 2.00 seconds. These are invented design-review inputs, not measurements or WHP settings.
The interface's startup requirement exceeds the available pulse by 0.40 − 0.15 = 0.25 seconds. If the interface resets completely between pulses and has no alternate supply, each search pulse repeats an incomplete boot. Waiting through more pulses does not automatically accumulate the missing startup time.
Now consider a separate hypothetical arrangement in which a maintained external contact directly connects a detectable load. If the load remains connected until a pulse arrives, the wait to the next pulse can approach the 2.00-second interval. Add an assumed 0.20-second confirmation delay and 0.40-second service startup: the modeled upper delay approaches 2.60 seconds.
A project requirement of service within 1.00 second would reject that modeled arrangement even if every attempt eventually wakes the inverter. A requirement of 5.00 seconds might permit further evaluation, but the calculation alone does not establish detection. Load current, pulse waveform and actual firmware behavior still need verification.
Swipe horizontally on a small screen, or open the full-size diagram.
The two arrangements have different failure mechanisms. The first has a startup dependency that prevents sustained operation; the second may detect successfully but respond too slowly. Keeping those cases separate prevents an energy-saving setting from being accepted on average power figures alone.
A controller supplied from a separate source can change this dependency, but the complete interface must still be qualified. Isolation, switching ratings and the intended shutdown behavior remain equipment design decisions. Do not add an improvised resistor or alter an inverter's internal circuitry simply to force detection.
Compare modes against a functional acceptance record
The useful record connects each service request to a completed function. An illuminated indicator, one successful wake-up or a visible search pulse does not prove that the downstream device completed its task. Define what successful service means before selecting the operating mode.
| Decision item | Continuous output | Search operation | Beweise zum Festhalten |
|---|---|---|---|
| Interface boot power | AC remains available | May depend on pulse duration | Power-ready and boot timestamps |
| Service request delay | Load startup still applies | Search interval may add delay | Request-to-function trace |
| Small waiting load | Can remain powered | May be below detection threshold | Actual waiting-state behavior |
| Mode decision | Compare idle consumption separately | Accept only if function succeeds | Approved configuration and results |
Victron's ECO configuration guidance separates wake-up power, search interval and search time, and notes that load type affects settings. Those distinctions are useful when drafting a supplier question. They do not establish that a WHP unit has corresponding adjustments.
Do not convert a manufacturer's VA detection threshold into the same number of real watts without load evidence. Electronic input stages can draw pulsed or reactive current during a search event. A steady-state wattmeter reading may not describe the condition used by the inverter's detection logic.
Verify repeatable wake-up under the real sequence
- Confirm the available mode. Record the full inverter label, firmware or hardware revision when available, manual revision and supported operating modes. Proceed with a search test only when applicable instructions identify the function; otherwise evaluate continuous operation against the project needs.
- Map the startup dependency. Record which component receives each pulse, how long it needs power, what creates the larger demand and whether its state survives between pulses. The diagram must contain an actual path from a service request to a detectable load.
- Set functional criteria. Record the maximum allowed request-to-service time, required service duration and permitted missed events. Include loss and restoration of the request, repeated short demands and the equipment's intended waiting state.
- Capture synchronized events. Under the approved equipment procedure, record request timing, AC availability, load readiness and completed function on a common time basis. A qualified person must select suitably rated measurement equipment and follow the inverter's connection and isolation instructions.
- Repeat the relevant conditions. Test the approved combinations of battery condition, waiting load, request duration and ambient condition. Compare each result with the functional criteria, retain failures and freeze only the tested configuration.
The test matrix should include requests occurring at different positions within the search interval. Starting every trial immediately before a known pulse can hide the longest delay. A sequence that passes only with favorable timing is unsuitable when field requests are asynchronous.
Acceptance criteria also need to define behavior after the service ends. Check that the station returns to its intended waiting condition and can respond to the next request. A system that wakes once but leaves its interface in an unexpected state has not completed the cycle.
Submit the load sequence with the WEHO enquiry
Send the WHP-2000 configuration enquiry the exact voltage variant, interface startup sequence, waiting-state demand and maximum allowed delay. Ask whether the ordered unit supports a documented search function and which evidence governs it. Include the functional record so that product discussion starts from a reproducible requirement.
Der WEHO WHP-2000W reference PDF supports identification and the need to distinguish configurations; it does not establish the hypothetical ECO settings used above. Retain the applicable supplied documentation with the accepted equipment configuration.
Engineering FAQ
Does a low standby-current figure prove search-mode compatibility?
No, standby current does not prove reliable load detection. Compatibility depends on the actual load sequence, available detection interval and required service delay. Confirm the mode and test completed service rather than relying on one consumption figure.
Can a load below the inverter's rated watts still fail to wake it?
Yes, rated output capacity and wake-up detection are separate conditions. A small controller may need sustained AC before it connects its main load. That dependency can prevent search operation even when the final load is within the inverter's rating.
Should I add a permanent dummy load to make detection work?
A permanent dummy load requires a separate engineering review. It changes energy use, heat and possibly the intended return to search state. Use the applicable instructions and compare the complete arrangement with continuous operation before approving any change.
Does every WHP-2000 inverter provide adjustable ECO mode?