Blogue

imagemye imgi 6 decoração

An AC SSR Is Off but the Power Supply Is Not: Review Leakage and Load Compatibility

Separate SSR control, output leakage and power-supply response. Prepare a time-based compatibility record before changing a relay or adding discharge

LED Driver Soft Start vs Fade-In: Specify the Turn-On Event

Separate power-stage startup, controller fade time and first-light delay when specifying and testing an LED luminaire.

50Hz vs 60Hz Power Supply Input: Check Frequency Separately from Voltage

Match the exact AC input-frequency and voltage ranges, then verify the source configuration and other AC-fed equipment in an export

RF Immunity for Powered Equipment: Define Conducted and Radiated Acceptance

Define conducted and radiated RF immunity evidence by port, operating mode and monitored function before accepting a power supply in

IO-Link Class A and B Power Budget: Check Port Limits, US and UA

Build an IO-Link power worksheet for Class A/B ports: check US/UA mapping, simultaneous current, group limits and behavior when power

Choosing an External AC EMI Filter for an SMPS: Ratings, Leakage and System Retesting

Screen an external AC EMI filter for voltage, current, temperature and leakage, then retest the installed SMPS-powered equipment.

UPS Compatibility with Active-PFC Power Supplies: Test Battery Mode and Transfer

Qualify an AC UPS and SMPS together: check W and VA, startup, transfer, battery operation and equipment recovery against defined

Does a Switching Power Supply Need a Minimum Load?

Check the documented lower load boundary, then qualify unloaded, idle and return-to-load states before approving a single-output supply.

Adding an LC Output Filter to an SMPS: Check Ringing, Sensing and Load Steps

Review an SMPS output LC filter with a resonance calculation, sensing checks and a before-and-after test matrix for ripple, startup

Power Supply Startup Time: Separate Setup Delay from Voltage Rise

Define the input event, output thresholds and controller-ready deadline before comparing power supply startup times.

Electronic Loads for Power Supply Testing: Choose CC, CR, CP or CV Mode

Match the load control law to the real device, then check voltage, current, power and dynamic limits before accepting a

Power Supply Short-Circuit Testing: Define the Fault and Recovery Record

Specify the fault and record its actual exposure, supply response and equipment recovery before assigning a pass result.