Check the WEHO NDR-75-24 against the complete installed envelope, the actual rail and the required wiring and service space. A narrow catalog dimension is not proof that the unit can be latched, wired, cooled or removed in a particular cabinet.
This guide covers installation-fit evidence for that WEHO model, not equivalence with another manufacturer’s supply. It contains no physical sample inspection or completed cabinet acceptance test. The linked documents describe the product; your installation record must identify what was actually checked.

Identify the model and the dimensional source
The WEHO NDR-75 family PDF, page 1, lists NDR-75-24 at 24 V with an output-current range of 0–3.2 A. It prints overall dimensions of 32 × 125.2 × 102 mm. The document is a catalog source, not a measurement report for an incoming sample.
Keep the complete suffix, sample identifier and current installation drawing with the cabinet layout. Verify which dimension corresponds to each axis and which features extend beyond the enclosure. Do not infer a dimensional tolerance, a clearance requirement or an installed depth merely from the printed dimensions.
Request the applicable drawing revision and mounting instructions from WEHO. A family photograph may help identify visible features, but it does not prove that a sample has a particular latch revision or that the rear rail is fully engaged. This article does not use a product photograph as mechanical acceptance evidence.
Separate body dimensions from the usable envelope
Review the cabinet in the intended installed state, including the door, duct covers, adjacent components and cable routing. A supply can occupy the nominal space while its conductors, connector access or removal path conflict with another part.
As a hypothetical width-only calculation, a 40 mm available span minus a 32 mm catalog dimension leaves 8 mm. That arithmetic does not establish acceptable side clearance, ventilation or wiring space. The axes must match, and the required spacing must come from the applicable instructions and cabinet design.
Check height and depth independently, including the rail position relative to the backplate and door. Confirm the actual conductor exit direction and bending envelope without using the terminal as a cable support. Do not force a wire bend or obstruct a ventilation opening just to reproduce a paper layout.
Record each unresolved interference with its location and the document needed to resolve it. Avoid reducing the result to “fits” when only the front width has been compared. Keep any required layout change separate from acceptance of the supply itself.
Verify rail engagement and service access
Use the exact mounting instructions and the actual rail arrangement. Confirm the rail profile and condition, the attachment method and the equipment’s required orientation. If the rail or mounting details are undocumented, obtain clarification before installation; do not approve them from the family name.
Qualified personnel should perform mounting and conductor work only after isolating and verifying all relevant energy sources. Ensure the installed retention mechanism can engage as intended without bending the enclosure or using adjacent equipment to hold the supply in position.
Check how the release mechanism will be reached during maintenance and how the supply can be removed after the cabinet is wired. Document any adjacent equipment that must be moved and whether that action is part of an authorized service procedure. A latch that can be reached only before the wiring ducts are installed does not demonstrate service access in the finished cabinet.

Keep electrical and thermal qualification separate
A mechanical fit decision does not qualify the 24 V branch. The catalog current range is not proof that the receiver will remain within its voltage limits during startup or that the installed enclosure maintains the necessary thermal conditions.
Obtain the applicable load, temperature and derating information for the exact sample and intended installation. Review airflow and heat from adjacent components as installed, rather than assuming a narrow enclosure removes the need for thermal evaluation.
Terminal identification, wire preparation, torque and protective measures must follow the applicable model instructions. This guide gives no torque value or terminal-order diagram. Do not borrow either from another manufacturer or another rating in the same family.
Any separately authorized energized measurement must use suitable rated equipment and a defined safe method. Return to verified isolation before changing mounting or wiring. Record electrical results in their own qualification evidence rather than using a successful mechanical trial as an electrical approval.
Build an installation-fit record
| Review boundary | Record for the actual cabinet | Do not infer |
|---|---|---|
| Identity and drawing | Model suffix, sample identifier and drawing revision | Identical hardware from a shared family name |
| Body envelope | Dimension axes, available space and measured conflicts | Required spacing from nominal body dimensions |
| Rail and retention | Rail details and engagement under the mounting procedure | Retention from a front-view photograph |
| Conductors | Exit direction, bend space and terminal access | A torque or wire size from another supply |
| Cooling and surroundings | Vents, adjacent heat sources and applicable spacing | Thermal qualification from a width comparison |
| Service and release | Release-tool access, removal route and open items | Maintainability before the cabinet is fully assembled |
Finish with a condition-specific conclusion: which sample and cabinet configuration were checked, which requirements were met and which items remain unresolved. A dimensional conflict and missing installation information should remain visible as different findings.
The separate WEHO NDR-120-24 sample-qualification checklist explains electrical demand and thermal evidence for that other model. It is not a source of NDR-75-24 dimensions or operating limits.
Frequently Asked Questions
Does the 32 mm catalog dimension prove cabinet fit?
No. Confirm the axes, the complete installed envelope and the required spacing, conductor access and removal path. Width-only arithmetic cannot close those checks.
Can a front-view photograph confirm rail retention?
No. Verify the actual rail and retention mechanism under the applicable mounting instructions. A photograph does not demonstrate engagement on your installed rail.
Which terminal torque should I use?
Use the value in the applicable instructions for the exact sample. This article does not supply one; request it if the installation information is incomplete.
Should the mechanical trial be performed with power on?
No. Qualified personnel should isolate and verify the relevant energy sources before mounting or changing wiring. Any separately authorized energized check has its own controlled procedure.
Does a successful fit check qualify the 24 V output?
No. Branch demand, receiver voltage limits and thermal operation require their own evidence. Keep those results separate from the mechanical-fit record.
Request installation information for the sample
Provide the full WEHO model, sample label, rail details, cabinet envelope and any blocked wiring or service-access locations. Ask for the applicable drawing, mounting instructions and installation requirements before releasing the layout.



