
Budget the job-card controllers together
If 16 job-card controllers each draw 0.35 A, their running load is 5.6 A. The S-201-5 lists 40 A at 5 V DC. Use the current during a commanded display refresh, not the value in sleep mode. Check peak demand and available output at the installed temperature.







S-200
S-250
S-150


